• 제목/요약/키워드: Korea power system

검색결과 12,499건 처리시간 0.045초

지중 송전케이블 자산데이터의 자동 정제 알고리즘 개발연구 (Automatic Cleaning Algorithm of Asset Data for Transmission Cable)

  • Hwang, Jae-Sang;Mun, Sung-Duk;Kim, Tae-Joon;Kim, Kang-Sik
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.79-84
    • /
    • 2021
  • The fundamental element to be kept for big data analysis, artificial intelligence technologies and asset management system is a data quality, which could directly affect the entire system reliability. For this reason, the momentum of data cleaning works is recently increased and data cleaning methods have been investigating around the world. In the field of electric power, however, asset data cleaning methods have not been fully determined therefore, automatic cleaning algorithm of asset data for transmission cables has been studied in this paper. Cleaning algorithm is composed of missing data treatment and outlier data one. Rule-based and expert opinion based cleaning methods are converged and utilized for these dirty data.

IEEE 1459-2010 규격의 정의를 이용한 다중 입력 채널을 갖는 전력 감시 시스템 (Power Monitoring System with Multiple Input Channels Using the Definition of IEEE Standard 1459-2010)

  • 전정채;오훈
    • 한국산학기술학회논문지
    • /
    • 제15권5호
    • /
    • pp.3100-3106
    • /
    • 2014
  • 본 논문에서는 전력 시스템의 전원 및 부하 측을 동시에 감시가 가능한 다 채널(전압 8채널, 전류 10채널) 전력 측정 시스템을 개발하였다. 제안된 시스템은 전력품질과 관련된 규정인 IEEE 1459-2010의 정의를 사용하여 전력 성분을 계산하는 신호처리 알고리즘을 기반으로 TMS320C42 DSP를 이용하여 개발하였다. 개발된 시스템은 표준 전원 공급 장치를 이용하여 그 성능 시험을 실시하였고, 그 결과 측정오차는 0.2% 이하로 나타났다. 또한 제안된 시스템을 3상 4선식 전력시스템에 설치하여 실증 시험을 실시하여 그 성능을 입증하였다. 제안된 시스템은 상업 및 산업용 전력 시스템에 적용하여 동시에 다 채널로 전력을 측정 및 분석함으로써 전력품질과 관련된 다양한 문제를 줄일 수 있을 것이다.

해외사업용 송전선로 설계시스템 개발 (Development of the Transmission Line Design System for Overseas Projects)

  • 민병욱;김종화;최석준;방항권;최한열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.129-131
    • /
    • 2006
  • KEPCO constructed the first 765kV 2 circuit transmission line in the world with its home grown technologies. Through this 765kV transmission system project, KEPCO accumulated experience and technologies related to the 765 kV power system. Based on the successful completion of the 765kV transmission project, KEPCO is conducting overseas business by using its abundant experience and know-how. In particular, KEPCO developed the training course for power system, called the ATT (Advanced Transmission Technology) training courses for overseas business, especially for developing countries. Therefore, KEPCO developed the "Transmission line design system for overseas projects". This system supports the calculation of wind pressure load, tower design, wire selection, insulation design, etc. by applying the meteorological data of foreign countries and design standards. And this system is applied to the training program so that the trainees can design the optimal transmission line for their own countries.

  • PDF

Carbon Free를 위한 도서지역용 독립전원계통의 모델링 및 운용알고리즘에 관한 연구 (A Study on the Modeling and Operation Algorithm of Independent Power System for Carbon Free)

  • 왕종용;김병기;박재범;김병목;김응상;노대석
    • 전기학회논문지
    • /
    • 제65권5호
    • /
    • pp.760-768
    • /
    • 2016
  • Recently, as one of the policies for carbon free operation method of independent power system replacing diesel generator with renewable energy such as wind power and photovoltaic(PV) system has been presented. Therefore, this paper proposes an operation algorithm and modeling of independent power system by considering CVCF(constant voltage constant frequency) ESS(energy storage system) for constant frequency and voltage, LC(load control) ESS for demand and supply balancing and SVC(static var compensator) for reactive power compensation. From the simulation results based on the various operation scenario, it is confirmed that proposed operation algorithm and modeling may contribute stable operation and carbon free in independent power system.

100 kW급 용융탄산염 연료전지 시스템 개발 II(스택 및 시스템 설계) (System Development of a 100 kW Molten Carbonate Fuel Cell II (Design of Stack and System))

  • 임희천;안교상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1322-1324
    • /
    • 2002
  • For developing a 100 kW MCFC power generation system, Several design parameters for a fuel cell stack and system analysis results by Cycle Tempo, a processing computer soft ware, were described. Approximately 170 cells are required to generate 100 kW at a current density of 125 mA/$cm^2$ with 6000 $cm^2$ cells. An overall heat balance was calculated to predict exit temperature. The 100 kW power is expected only under pressurized operation condition at 3 atm. Recycle of cathode gas by more than 50% is recommended to run the stack at 125 mA/$cm^2$ and 3 atm. Manifolds should be designed based on gas flow rates for the suggested operating condition. The fuel cell power generation system was designed conceptually with several choices of utilization of anode exhaust gas. Also system efficiency was calculated at various type of system and operation conditions.

  • PDF

100 kW급 용융탄산염 연료전지 시스템 개발 I (시스템 및 스택 설계) (System Development of a 100 kW Molten Carbonate Fuel Cell I (Design concept of Stack and System))

  • 임희천;안교상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 B
    • /
    • pp.1300-1302
    • /
    • 2001
  • For developing a 100 kW MCFC power generation system. Several design parameters for a fuel cell stack and system analysis results by Cycle Tempo, a processing computer soft ware, were described. Approximately 170 cells are required to generate 100 kW at a current density of $125mA/cm^2$ with $6000cm^2$ cells. An overall heat balance was calculated to predict exit temperature. The 100 kW power is expected only under pressurized operation condition at 3 atm. Recycle of cathode gas by more than 50% is recommended to run the stack at $125mA/cm^2$ and 3 atm. Manifolds should be designed based on gas flow rates for the suggested operating condition. The fuel cell power generation system was designed conceptually with several choices of utilization of anode exhaust gas. Also system efficiency was calculated at various type of system and operation conditions.

  • PDF

120kW급 태양광 발전시스템의 실 계통 연계 운영에 대한 연구 (A Study on Application and evaluation of a 120kw Photovoltaic Power Generation system in a real power system)

  • 황정희;안교상;황인호;임희천;오제명;김수창;김신섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.523-524
    • /
    • 2006
  • This paper summarizes the results of medium-scale(120kW class) installed in a Taeahn steam power system of Korea Western Power Co., Ltd., Scope of the study is development on the practical Technology for Application and evaluation of 120kW class PV system in a real power system. In this paper represent performance of 120kW PV system has been evaluated and analysed with simulation.

  • PDF

풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구 (A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System)

  • 정승민;유연태;김현욱;장길수
    • 조명전기설비학회논문지
    • /
    • 제29권7호
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.

전력계통계획의 종합기계화에 관한 연구 (Study on the computer method for power system planning)

  • 송길영
    • 전기의세계
    • /
    • 제27권1호
    • /
    • pp.49-55
    • /
    • 1978
  • This paper describes a computer method for power system planning. Power system planning was usually studied through individual programs. Because of the laborious work involved in data preparation, the increase of task for power system planning and the time required for the detailed analysis of results, the available time for assessment and decision making has been sacrificed. In order to improve the above situation, the use of data base techniques an the simplified evaluation of the presented programs were newly developed. This program has been used successfully for the routine of power system planning in Korea Electric Company. In addition, this paper describes some results of analysis and evaluation of power system planning in KECO.

  • PDF

고속전철용 보조전원장치 시스템 조합시험 (Combined test of Power Supply System for Korean High Speed Train)

  • 조현욱;김연충;김태환;장경현;김철호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.619-625
    • /
    • 2008
  • Electrical Power supply System conditions of korea high speed train consists of main transformer, four AC-DC PWM converter of Auxiliary Block, Battery Charger in Power Car and Trailer Car, Trailer Inverter, Auxiliary inverter. Main transformer, at nominal voltage of 25kv supplied to secondary winding nominal output Voltage 383Vac, The Auxiliary block consists of AC-DC converters for generating 670VDC power, Auxiliary inverters for ventilation and air compressor, Trailer car inverter provide three phase power supplies at 440Vac for air conditioning and heating. The Battery charger Trailer and Power car supplies 72VDC all necessary equipment to energize the trainset equipment and suppy essential control. This Paper introduces the combined test results of the power supply system for korea high speed train. The main purpose of this combined test is to verify the performance of the power supply system that is designed to operate up to full load test.

  • PDF