• Title/Summary/Keyword: KUH

Search Result 212, Processing Time 0.028 seconds

The Overview of the Design and Development Process of the Indigenous Korean Utility Helicopter (KUH) (한국형기동헬기(KUH) 설계개발과정 개관)

  • Yoon, Heekweon;Oh, Sangchul;Jeong, Sangwon;Yang, Junho
    • Journal of Aerospace System Engineering
    • /
    • v.2 no.3
    • /
    • pp.29-32
    • /
    • 2008
  • The overview of KUH design and development process is presented according to Buede's systems and development "vee" model. The system decomposition and integration activities exemplify KUH specification tree, design maturity and analysis according to design stage(conceptual, preliminary, and detail design), scheduled work breakdown structure, qualification test, ground test, and flight test. This process can be applied to the development of a new aircraft.

  • PDF

A Study on Quality Improvement of Electrical Master Box for KUH (한국형 기동헬기 전원분배 제어장치의 품질 향상에 관한 연구)

  • Kim, Young Mok;Jun, Byung Kyu;Jeong, Sang Gyu;Lee, Joo Hyung
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.1
    • /
    • pp.71-78
    • /
    • 2017
  • The electrical power system of Korean Utility Helicopter(KUH) is designed as a dual control system to enhance the system safety of aircraft and each system is installed separately at left and right of the aircraft. The system is composed of 2 AC generators, 1 APU generator, 2 Transformer Rectifier Units(TRU), AC/DC Electrical Master Box(AC/DC EMB). The AC/DC EMB, consists of 2 AC EMB and 2 DC EMB, is essential equipment which supply and distribute electric power to the aviation electronics and electrical equipment of KUH. There were defects caused by internal short circuit in AC EMB during the first production phase of the KUH. This paper describes the analysis of the defects, troubleshooting process, root cause, and the solution by design change.

A Way to Perform a Helicopter PFAT by KUH Case Study (KUH 사례를 통한 헬기 비행전 수락시험 수행 방안)

  • Lee, Sangmok;Hwang, Jungsun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.12
    • /
    • pp.994-1001
    • /
    • 2013
  • Process of helicopter development is divided in design, manufacture and test & evaluation phase. Test & evaluation is performed step by step in order of component test, rig test, system ground test and flight test. After completing ground test and before first flight, US military specification requires 50hrs-PFAT in order to assure flight safety. PFAT is the test which requires tie-down and severe load imposition and it needs special ground test vehicle which is similar to helicopter prototype as well as much cost and period. In case of KUH, we have performed tailored PFAT considering KUH development environment. In this paper, we propose a proper way to perform the PFAT in accordance with development environment by giving KHU PFAT procedure and result.

The Results of Gastric Cancer Surgery during the Early Stage of a Training Hospital (설립 초기의 수련 병원에서의 위암 수술 성적)

  • Kim, Kun-Young;Yoo, Moon-Won;Han, Hye-Seung;Yun, Ik-Jin;Lee, Kyung-Yung
    • Journal of Gastric Cancer
    • /
    • v.8 no.4
    • /
    • pp.244-249
    • /
    • 2008
  • Konkuk University Hospital (KUH), which opened in September 2005, is currently categorized as a secondary hospital. Early on after its establishment, the surgical residents and nurses were relatively inexperienced in the treatment of stomach cancer. Therefore, the quality of surgery for stomach cancer at KUH may be different from that of the existing large-scale tertiary hospitals. The purpose of this study is first to investigate the clinicopathological characteristics of the gastric cancer patients at the KUH, and second to compare our morbidity & mortality rates with those of previous studies, and we also analyzed the risk factors of morbidity at the early stage of a training hospital. Materials and Methods: This study retrospectively collected the clinicopathological characteristics and the post-operative morbidity rates and mortality rates with using the electronic medical records of all the patients who went under a gastric cancer operation at KUH from September 2005 to April 2008. Results: The total number of gastric cancer patients who underwent operation was 201. The morbidity rate and death rate at KUH were 10.4% and 0.5%, respectively. The morbidity has increased with an older age. The other variables had no influence on morbidity. Conclusion: The morbidity rate, death rate and the clinicopathological characteristics of gastric cancer patients at KUH were similar to those of the previous reports. We found that age is the main factor affecting the morbidity rate after stomach cancer surgery. For further surgical qualification of stomach cancer surgery at KUH, it is necessary to collect the survival data of patients who undergo stomach cancer surgery.

  • PDF

A Study on Winter Season Usability Performance Improvement of Flapper Valve for KUH-1 (한국형 기동헬기 동계운용능력 향상을 위한 플래퍼밸브 개선연구)

  • Choi, Jae Hyung;Chang, In ki;Shim, Dai Sung;Ahn, Jeong Min
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.1
    • /
    • pp.49-56
    • /
    • 2016
  • Flapper Valve of Korean Utility Helicopter(KUH-1) is an essential equipment in Environmental Control System(ECS) for pilot to perform flight mission. It provides pilots and crews with heating, ventilating and air conditioning. It has function of maintaining room temperature to sustain operational capability for pilot and crew. This paper summarizes pilot comments in flight test which are classified by cause of occurrence and the troubleshooting process about each comment. It also describes design improvements which was derived from troubleshooting and suggests verification results of flight test at low temperature.

An Improvement Study on Brake System for KUH-1 (한국형 기동헬기의 제동장치 개선에 관한 연구)

  • Choi, Jae Hyung;Lim, Hyun-Gyu;Yoon, Jong Jin;Kang, Deuk Soo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.45 no.4
    • /
    • pp.292-299
    • /
    • 2017
  • The KUH-1's Wheel Brake Assembly which is Brake System is an essential component to perform flight mission for pilot. It has function of taxing, differential braking and parking to sustain landing capability. However, the skid and abrasion of tire were occurred in mass-produce operation. Also, if it is occurred on the ground, the flight can not be performed. In this case, the defect is a major cause of the decrease in the operation rate of aircraft. In this paper, the cause of the defect in flight was identified and the failure process was organized. Also, it describes design improvements which was derived from troubleshooting and suggests verification results of flight test.

A Study on Voice Communication Quality Improvement of Intercom System for KUH (한국형 기동헬기 내부통화장치의 통화품질 향상에 관한 연구)

  • Kim, Young Mok;Chang, Joong Jin;Jun, Byung Kyu;Kim, Chang Young;Jeong, Jin Woong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.12
    • /
    • pp.1002-1010
    • /
    • 2013
  • Intercom System(ICS) of Korean Utility Helicopter(KUH) is an essential equipment for pilot to perform flight mission and it consists of communication system of KUH with VHF-FM radio set and U/VHF-AM radio set. It provides pilots and crews with internal communication, external communication and audible alarm. It has function of controlling volume and selecting two communication modes, normal mode and backup mode. This paper summarizes pilot comments in flight test which are classified by cause of occurrence and the troubleshooting process about each comment. It also describes design improvements which was derived from troubleshooting and suggests verification results of flight test.

Development of T700/701K Engine for KUH (한국형 기동 헬기 엔진 (T700/701K) 개발)

  • Kim, Jae-Hwan;Ahn, Iee-Ki;Lee, Dae-Sung;Sung, Ok-Suck;Sung, In-Kyung
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.15 no.4
    • /
    • pp.79-84
    • /
    • 2011
  • This paper presents development activities of the T700/701K turbo-shaft engine for Korean Utility Helicopter(KUH). The T700/701K is the first rear-drive variant of the GE's T700 engine which is proven for military applications in the world. The main workscope of the development includes a modification from a front-drive engine to a rear-drive one, an performance enhancement of the power turbine and an incorporation of two channel FADEC(Full Authority Digital Engine Control) system for more reliable operation. The first engine run for development and qualification test was successfully completed in 2008. Since the PFRT(Preliminary Flight Rating Test) has been completed, the first flight of the engine installed in the first prototype of KUH has been successfully demonstrated in March, 2010 and the engine installation compatibility tests are being carried out during KUH flight test. The test and evaluation for qualification has been done except for the low cycle fatigue test up to date.

Development of T700/701K engine for KUH (한국형 기동 헬기 엔진 (T700/701K) 개발)

  • Kim, Jae-Hwan;Ahn, Iee-Ki;Lee, Dae-Sung;Sung, Ok-Suck;Sung, In-Kyung
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.506-511
    • /
    • 2010
  • This paper presents development activities of the T700/701K turbo-shaft engine for Korean Utility Helicopter(KUH). The T700/701K is the first rear-drive variant of the GE's T700 engine which is proven for military applications in the world. The main workscope of the development includes a modification from a front-drive engine to a rear-drive one, an performance enhancement of the power turbine and an incorporation of two channel FADEC(Full Authority Digital Engine Control) system for more reliable operation. The first engine run for development and qualification test was successfully completed in 2008. Since the PFRT(Preliminary Flight Rating Test) has been completed, the first flight of the engine installed in the first prototype of KUH has been successfully demonstrated in March, 2010 and the engine installation compatibility tests are being carried out during KUH flight test. The test and evaluation for qualification of the engine has been done except for the LCF test up to date.

  • PDF