• Title/Summary/Keyword: KSLV-I

Search Result 159, Processing Time 0.029 seconds

KSLV-I Assembly Complex System Design (KSLV-I 조립콤플렉스 시스템 설계)

  • Jin, Seung Bo;Park, Jung Ju
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.37-41
    • /
    • 2006
  • The KSLV-I satellite launch vehicle will be launched in a space center currently under construction. The Space Center which is an advance post base of space development of Korea is located on Oenaro island in Kohung, South Cholla Province. A Ground Complex of the Space Center consists of an AC(Assembly Complex), a LC(Launch Complex), and a MCC(Mission Control Center). Assembly and test facilities are located in the AC in which stage assembly, integrated assembly, check-up, certification test, and pre-launch test are made effectively. A launch pad, fuel supply facilities, a launch control center and associated supporting facilities are located in the LC, and the MCC has control over the space center. These ground complex facilities have diverse forms of an interface with mechanical device, electric device, and etc. These should also provide optimum condition and performance during launch operation processes of the launch vehicle. This paper introduces the result of R&D for the AC of the ground complex performed during system design period.

  • PDF

Flight Safety Operation for the 1st Flight Test of Naro(KSLV-I) (나로호(KSLV-I) 1차 비행시험 비행안전 운영)

  • Ko, Jeong-Hwan;Choi, Kyu-Sung;Sim, Hyung-Seok;Roh, Woong-Rae;Park, Jeong-Joo;Cho, Gwang-Rae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.3
    • /
    • pp.280-287
    • /
    • 2010
  • The first Korean satellite launch vehicle, KSLV-I(Korea Space Launch Vehicle-I), was launched for its first flight test on Aug. 25, 2009 from Naro Space Center located in south Jolla province. Because launch vehicles usually fly long range with large amount of propellants aboard, preparation of countermeasures against potential malfunctions during flight is essential in launch operation. In this paper, the flight safety operation, prepared to guarantee flight safety during launch operation of KSLV-I, is presented. Prior to flight test, flight safety analysis is performed to estimate associated risk levels quantitatively, and during flight, flight safety systems are operated to cope with any risky situations. Real-time flight monitoring including computation of instantaneous impact point using tracking data is executed normally and the flight test is completed without activation of flight termination system.

TVC Actuation Tests and Analyses for Real-Sized Kick Motor Assembly of KSLV-I (KSLV-I 실물형 킥모터조합체 TVC 구동특성시험 및 분석)

  • Sun, Byung-Chan;Park, Yong-Kyu
    • Aerospace Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.146-156
    • /
    • 2007
  • In this paper, the TVC actuation test and analysis results for a flexible seal kick motor nozzle are presented. A real-sized test model of KSLV-I kick motor system is applied to water pressurizing TVC tests which investigate the property changes in TVC nozzle expansion and TVC actuation performance against chamber pressure changes. The equipments which are required for TVC actuation tests are briefly explained. The TVC actuation tests are firstly accomplished in static mode, which reveals TVC error characteristics including thrust misalignment, control accuracy, and TVC stroke increase, etc. The properties in frequency domain is given via dynamic tests. These results may play an important role in enhancing the TVC control performance of KSLV-I.

  • PDF

Operation of the GPS Receiver System for KSLV-I on the Launch Site at Naro Space Center (나로우주센터 발사장에서 나로호 GPS 수신기 시스템의 운용)

  • Kwon, Byung-Moon;Moon, Ji-Hyeon;Shin, Yong-Sul;Choi, Hyung-Don;Cho, Gwang-Rae
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.7
    • /
    • pp.737-745
    • /
    • 2010
  • This paper describes the operation results of the GPS receiver system for KSLV (Korea Space Launch Vehicle)-I on the launch site at Naro Space Center that is the first spaceport of South Korea located at Goheung. All equipments of KSLV-I including the GPS receiver system should be monitored and controlled through hard-wired interface during KSLV-I is on standby at the launch pad. The GPS receiver for KSLV-I is connected to triple almost omni-directional patch antennas mounted on the cylindrical surface of KSLV-I that should be erected vertically on the launch pad until lift-off. Signal interference and multipath effects observed in the GPS receiver on the launch site are analyzed in this paper based on the GPS signals received from each GPS antenna.

Development of Nitrogen Supply System for Launch Complex of KSLV-I (KSLV-I 발사대 질소 공급 시스템 개발)

  • Cho, Kie-Joo;Ahn, Kyu-Bok;Kim, Mun-Ki;Kang, Sun-Il;Ra, Seung-Ho;Oh, Seung-Hyub
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.15 no.2
    • /
    • pp.68-73
    • /
    • 2011
  • For the launch preparation of KSLV-I, gaseous nitrogen with various level of pressure and cryogenic liquid nitrogen are required. Nitrogen Supply System on launch complex has been developed to perform the production of high pressure gaseous nitrogen, the production of gaseous nitrogen with temperature of 273 ${\pm}$ 2K for protection purge of launch vehicle after loading of propellant and the supply of cryogenic liquid nitrogen for cooling of fuel (kerosene) and oxidizer (liquid oxygen). The operational instability of vaporizer mainly caused by its heat transfer characteristics which sensitively depends on the atmospheric conditions was removed by introducing parallel installation of two vaporizer and their switching operation. The developed Nitrogen Supply System carried out its function successfully in preparation of KSLV-I flight tests.

Development of Nitrogen Supply System for Launch Complex of KSLV-I (KSLV-I 발사대 질소공급시스템 개발)

  • Cho, Kie-Joo;Ahn, Kyu-Bok;Kim, Mun-Ki;Kang, Sun-Il;Ra, Seung-Ho;Oh, Seung-Hyub
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.752-757
    • /
    • 2010
  • For the launch preparation of KSLV-I, gaseous nitrogen with various level of pressure and cryogenic liquid nitrogen are required. Nitrogen Supply System on launch complex has been developed to perform the production of high pressure gaseous nitrogen, the production of gaseous nitrogen with temperature of $273{\pm}2K$ for protection purge of launch vehicle after loading of propellant and the supply of cryogenic liquid nitrogen for cooling of fuel (kerosene) and oxidizer (liquid oxygen). The operational instability of vaporizer mainly caused by its heat transfer characteristics which sensitively depends on the atmospheric conditions was removed by introducing parallel installation of two vaporizer and their switching operation. The developed Nitrogen Supply System carried out its function successfully in preparation of KSLV-I flight tests.

  • PDF

Development and Performance test of Mechanical Support Equipment for Assebmly/Integration of KSLV-I (KSLV-I 총조립용 기계지원장비 개발 및 성능시험)

  • Jin, Seung-Bo;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.116-124
    • /
    • 2010
  • Ground complex composed of Assembly Complex(AC) and Launch Complex(LC) which is located on Oenarodo space center in Kohung is necessary for successful launching of KSLV-I. AC performs accepting of a KSLV-I 1st stage and 2nd stage, stage assembly, the integrated launch vehicle, the checked out, and all kinds of performance test, pre-launch tests and processing. At AC, the mechanical support equipments, that is called the technological equipments, are installed in the Launch Vehicle Assembly Test Building(LVATB). These technological equipments have diverse forms of an interface with mechanical/electric device of the launch vehicle and have to provide a condition and the performance guarantee of an optimum in the launching operation process. In this paper, the requirements specification and manufacturing performance test for the mechanical support equipments which are used in the assembly/disassembly and test of the launch vehicle are introduced.

Introduction of Thrust Vector Control System and Control Valve Development for Space Launch Vehicles (우주발사체용 추력벡터제어 시스템 및 제어밸브류 개발 현황 소개)

  • Lee, Je-Dong;Park, Bong-Kyo;Park, Ho-Youl;Kim, Sang-Beom;Jun, Pil-Sun;Jang, Ki-Won
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.613-615
    • /
    • 2009
  • This paper is to introduce Hanwha Aerospace R&D Center's development status of TVC(Thrust Vector Control) system and control valves for Korean space launch vehicles. With the successful development of KSR-III TVC system, Hanwha have developed TVC system and RCS control valves for KSLV-I. Also, in the advance research area of KSLV-II, Hanwha have participated in LOx and fuel flow control valves and LOx shut-off valve development in the engine supply system. Based on the accumulated experiences and technologies in the aerospace key components and system development, Hanwha will make an important contribution to KSLV-II development in the future.

  • PDF

Development of On Board Pyro-Shock Recorder for Launch Vehicle (발사체 탑재용 파이로 충격기록장치 개발 및 시험)

  • Kim, Joo-Nyun;Jung, Hae-Seung;Lee, Jae-Deuk;Kim, Bo-Gwan
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.33 no.5
    • /
    • pp.65-71
    • /
    • 2005
  • Pyro-shock measurement system in launch vehicle is necessary to validate structural robustness and to prepare environmental qualification criteria for launch vehicle systems. This paper describes design, development and function test of prototype pyro-shock recorder to be employed on KSLV-I in the near future. Due to the limitation of telemetry transmission rate, pyro-shock recorder acquires and stores the shock sensor data with high sampling rate in short period and sends the data to the KSLV-I telemetry system with lower data rate. Signal conditioning in pyro-shock recorder is designed to enhance signal-to-noise ratio through proper placement of anti-aliasing filter.

Design and Implementation of a Testbed for the Development of KSLV-II Onboard Equipment Simulator (한국형발사체 탑재장비 시뮬레이터 개발을 위한 테스트베드 설계 및 구축)

  • Yoon, Won-Ju
    • Aerospace Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.173-179
    • /
    • 2013
  • This paper describes a testbed that was designed and implemented for the development of KSLV-II onboard equipment simulator. It used the CPCI-based industrial hardware system for scalability and the QNX real-time operating system for reliability and real-time simulation. In addition, a real-time application under QNX for function simulations of the KSLV-I PDU was developed and it was verified through interface experiments with KSLV-I upper-stage test equipment. The implemented simulator testbed will be used to verify the development feasibility in the design and development phase of a real KSLV-II onboard equipment simulator.