• Title/Summary/Keyword: KRTCS-2

Search Result 2, Processing Time 0.015 seconds

Development of Standard Specification of Korea Radio based Train Control System(KRTCS-2) for Conventional & High Speed Railway (일반·고속철도용 무선기반 열차제어시스템(KRTCS-2) 표준사양 개발)

  • Kim, Chan-ho;Park, Jong-won;Lee, Kang-gyoo;Sung, Dong-il;Yun, Hak-sun
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.6
    • /
    • pp.736-743
    • /
    • 2016
  • In accordance with the trend of higher speed and automation, the Train Control System is building on the technology of control methods using radio in the technology of exchanging information by wire, toward a wireless communication method that will be applied using LTE-R radio communication technology with $4^{th}$ generation LTE mobile communication a $2^{nd}$ generation GSM-R. Therefore, a standard specification suitable for the Korea Radio based Train Control System-2(below KRTCS-2) for the 350km/h class using wireless communication is created; a prototype based on the standard specification is installed on a high-speed train and is installed on a test section(Ik san-Jeong eup) on the Honam high speed line to ensure the reliability and safety of the standard specifications, which are verified through various performance tests. In the future, the standard specification that has been established as a national railway standard, and the standard specifications will be commercialized by applying the train control system to conventional and High speed railway lines.

Expanding Plan Study of KRTCS-2(Korean Radio Train Control System for Conventional & High Speed Railway) (일반 및 고속철도용 한국형열차제어시스템 확대적용 방안 연구)

  • Lee, Kang-Gyoo;Choi, Jong-gwoan;Sung, Dong-Il;Yun, Hak-Sun;Park, Jong-Won;Kim, You-Ho;Lee, Nam-Hyoung;Yoo, Jong-Cheon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.533-539
    • /
    • 2017
  • ERTMS/ETCS Level 2 is currently planning, making contract, constructing and operating at several lines in European well-developed railway countries different from past ten years ago, and applying extensively for purpose of its intercompatibility and operational efficiency, and economic feasibility. On the other hand, ATP system correspond to ETCS Level 1, which was domestically introduced in early 2000, has introduced, operated, and planned or constructed in national railwaynetwork, but the lines, which its improvement period is come, are being occurred starting Gyeongbu Line. Therefore, we study the consideration and construction plan by stages if LTE-R Korean Radio-based Train Control System for conventional & high-speed railway under domestic development is extensively applied as the third National Railway Network Construction Plan was announced.