• 제목/요약/키워드: KEPCO System

검색결과 1,670건 처리시간 0.034초

신개발 접지장치의 성능평가시스템에 관한 연구 (A study on the system to evaluate the performance of novel ground apparatus)

  • 박상만;장상옥;박창호;강문호;최종기;이문석;최하옥;이용한;황광수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2666-2668
    • /
    • 2003
  • The most widely employed grounding apparatus in distribution systems is a driven rod. But this method has some difficulties to get a specified ground resistivity in cities or islands. Recently, the new ground apparatus are proposed. This paper describes the research which relates with the system to evaluate the performance of novel grounding apparatus.

  • PDF

실시간 시뮬레이터 기반의 스마트 인버터 제어기능 시험 환경 구축 및 시험 결과 (Test bed for Advanced function of Smart Inverter and Results Based on Real-Time Simulation Platform)

  • Sim, Junbo;Ban, Minho;Lim, Hyeonok;Cho, Seong-Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.107-114
    • /
    • 2021
  • High penetration of renewable energy generators causes unnecessary investment for power system facilities. Especially with Korean government policies such as Renewable Energy 3020 and Inter-connection support Responsibility of KEPCO for 1 MW DERs, the applications of DER interconnection in distribution system have been increasing. To save the investment, smart control functions for DERs are required and the test bed for the inverters which have not been prepared are necessary to insure DER inter-connection stability. For this, test bed for advanced functions of a smart inverter has been constructed and the tests for necessary functions have been implemented. In this paper, the test bed and environment as well as specifications are introduced and the test results for the validation of the functions are analyzed.

지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법 (MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets)

  • 조종은;이온유;김상봉;김강식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권2호
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.

DTS 기반 온도 감시 및 온도 조건에서의 배터리 셀 열화 특성 분석 (DTS-based Temperature Monitoring and Analysis of Battery Cell Deterioration Characteristics by Temperature Condition)

  • 권순종;김수연;황진;우상균;김봉석
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권2호
    • /
    • pp.143-149
    • /
    • 2022
  • As ESS safety issues increase recently, there is a need to more precisely monitor the temperature of the ESS. In this paper, DTS technology for temperature monitoring of ESS batteries is introduced and the temperature measurement principle is explained. The temperature of the battery module is measured using the DTS system, and the thermal deviation between battery cells inside the battery module is analyzed. In order to analyze how thermal imbalance affects the charging and discharging performance of the battery, an accelerated degradation test was conducted. Cycle life characteristics analysis, battery surface temperature change, and AC impedance characteristics were conducted to analyze how the performance of battery cells differs according to temperature conditions.

원격 훈련용 발전 시뮬레이터 개발 (Development of Web-based Power Plant Simulator System)

  • 변승현;강해수;우주희;이지훈;김덕호
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권2호
    • /
    • pp.277-283
    • /
    • 2021
  • Power plant simulators have been used for operator training, control verification and engineering verification. In general, simulators can be used in the place where they are installed by only single user group at a time. Considering high cost of simulator development, a lot of available scenarios, the diversity of user level and accessibility based on users' work location, development of simulator system that can be used by multiple user groups regardless of location is required in order to enhance utilization of simulators. In this paper, the simulator system that can be used by multiple user group simultaneously without location limitation is proposed. The simulator system is composed of simulator servers, database servers, HMI servers, a web server, web clients. Simulator server consists of control model, process model that are developed for Circulating Fluidized Bed power plant located overseas. A web server manages user accounts, operation procedures, multiple server access between web client group and simulator server group. In other words, a web server makes a user group select a simulator server at a time. The developed simulator system is integrated after implementing process model, control model, HMI, and web server. Web client systems are installed on local site where power plant is located, while simulator servers, HMI servers, database servers, and a web server are located in KEPCO RI. The developed simulator system is verified by steady-state test, malfunction test and so on via remote access.

PLC를 이용한 저압 AMI(Advanced Metering Infrastructure) 시스템 구축 (Development of Low Voltage AMI(Advanced Metering Infrastructure) System using PLC)

  • 정준홍;김성만;정수미;김광영;김홍산
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.743-744
    • /
    • 2011
  • Currently, the major issue in power system is construction of smart grid. Unlike conventional electricity grids, smart grid allows two-way communication between electricity suppliers and consumers, as well as enabling more dispersed generation and storage of power. The AMI(advanced metering infrastructure) system is the core technology of smart grid and this paper deals with the design methodology of AMI System using PLC(power line communication) networks.

  • PDF

화력발전소 통합감시제어시스템의 기기검증시험 사례 분석 (Anaysis of Equipment Qualification Tests for IMCS(Integrated Monitoring & Control System) in Thermal Power Plants)

  • 신만수;이주현;박두용;변승현;최인규;이세경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.1820-1821
    • /
    • 2011
  • The equipment qualification test was accomplished before application to power generating stations because troubles in applying to real system could be prevented trough the test. That is, if a system was judged to be suitable in the equipment qualification test, the system was expected to be operated stable to the designed life.

  • PDF

한전계통에서 중장기 조상설비 소요량 산정에 관한 연구 (A Study on the amount of compensators at the KEPCO system in a middle-long term point of view)

  • 김호표;허연;최재명;김상권;이호용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.187-189
    • /
    • 2006
  • Compensators need to keep the voltage properly at the KEPCO system in a ruddle-long term point of view. Therefore, it is necessary to forecast the amount of compensators. In this paper, we analyze how much compensators are needed and what kind of effects is given on the KEPCO system in a middle-long term point of view. In addition, this analysis is based on the books named "The plan of Transmission and Substation at the KEPCO in 2005" and we used PSS/E program when we analyze the KEPCO system.

  • PDF