• Title/Summary/Keyword: KEPCO Power System

Search Result 1,269, Processing Time 0.037 seconds

Power Quality Analysis of the Distribution System with Large scale PV Generators (대용량 태양광발전 연계 배전계통 전기품질 분석)

  • Jung, Won-Wook;Shin, Dong-Yeol;Lee, Hak-Ju;Cho, Seong-Soo;Yoon, Gi-Gab
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.528-529
    • /
    • 2008
  • 본 논문에서는 국내에 건설된 MW급 태양광 발전소를 대상으로 태양광발전의 출력 특성과 전기품질을 분석하였다. 태양광발전에 의한 전기품질 평가를 위해 1MW 용량의 태양광발전 연계 배전계통을 대상으로 전기품질 측정시스템을 구축하여 1달간 데이터를 취득하였으며 태양광발전의 출력 고조파를 분석하였다. 또한 태양광발전 연계 배전계통의 변전소 및 말단 부하단에서 동시에 전기품질을 모니터링하여 태양광발전이 배전계통의 전기품질에 미치는 영향을 분석하였다.

  • PDF

Test-Field Construction for Long-term Reliability of EHV Underground Transmission Cable (초고압 지중케이블 장기신뢰성 실증시험장 구축)

  • Kim, Jin;Kang, Ji-Won;Jang, Tae-In;Yang, Byeung-Mo;Park, Jun-Woo;Park, Hung-Sok;Yoon, Hyung-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.383_384
    • /
    • 2009
  • After the 1970s, the importance of underground transmission systems increased and the construction rate of underground transmission lines also showed increasing trends each year, especially in metropolitan areas. Accordingly the social ripple effects are very large and wide when the fault occurs in underground power system, and the amount of time and money spent to restore the system also increases. So we must ensure stable operation and long-term reliability of the facilities. In Korea's case, long-term reliability tests for EHV power cables and accessories progressed poorly because equipment was not compatible for long-term reliability tests. Therefore we planned to construct a long-term reliability test field for EHV underground cables in order to ensure international quality reliability and optimal power cable operation techniques. The Gochang Underground Cable Test Field is under construction, funded by the Korean government, the govenment's union investment department, KEPCO, KERI and three private cable corporations. This project began in March, 2005 and will be completed by February, 2010. It is designed to promote joint research by incorporating several types of test equipment, construction of operating facilities, and being an internationally certified authority.

  • PDF

Insulation design for KEPCO 765kV Transmission Lines (한전 765 kV 송전선로의 절연설계)

  • Koo, B.M.;Won, Y.J.;Hwang, J.I.
    • Proceedings of the KIEE Conference
    • /
    • 1994.07b
    • /
    • pp.1628-1632
    • /
    • 1994
  • KEPCO is now promoting the new project of upgrading its highest system voltage from 345kV to 765kV. The main reason of this project is an insurance of bulk power transmission from power complexes at coast to power demand center at Kyoung-In area. The new system needs a careful approach to basic design to secure its reliability and to reduce the increase of investment cost. So, We introduced the basic philosophy of insulation design in spring meeting of this transaction. This paper, after preceding paper, deals with the insulation design example for 765kV transmission lines.

  • PDF

Anaysis of Equipment Qualification Tests for IMCS(Integrated Monitoring & Control System) in Thermal Power Plants (화력발전소 통합감시제어시스템의 기기검증시험 사례 분석)

  • Shin, Man-Su;Lee, Joo-Hyun;Park, Du-Yong;Byun, Seung-Hyun;Choi, In-Kyu;Lee, Se-Gyeong
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1820-1821
    • /
    • 2011
  • The equipment qualification test was accomplished before application to power generating stations because troubles in applying to real system could be prevented trough the test. That is, if a system was judged to be suitable in the equipment qualification test, the system was expected to be operated stable to the designed life.

  • PDF

A Study on AMI System of KEPCO (KEPCO의 지능형 원격검침 시스템에 대한 연구)

  • Myoung, No-Gil;Kim, Young-Hyun;Lee, Sang-Yeum
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.8B
    • /
    • pp.1251-1258
    • /
    • 2010
  • Major utilities have been focusing on R&D and business of AMI system which plays a vital role in SmartGrid whose concept is to optimize energy efficiency with exchanging real time information between utilities and consumers based on IT technologies in power grid. In this paper, we introduce KEPCO's AMI business plan, the AMI System architecture, designed core devices, communication networks and value added services, and also explore technical and business characteristics of KEPCO's AMI system.

Application Optimal Reconfiguration Algorithm for Distribution Power System to KEPCO System (배전계통 최적 재구성 알고리즘의 실계통 적용)

  • Seo, Gyu-Seok;Baek, Young-Sik;Kim, Jung-Nyun;Chae, Woo-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.125-127
    • /
    • 2008
  • This paper shows application of optimal reconfiguration algorithm for distributing power system to KEPCO(Korea Electric Power Corporation) system for loss minimization and load balancing. That is, it suggests additional algorithm to check potential problems caused in case of theoretical algorithm being applied to real system and recover from them. Also, comparing the results of reconfiguration algorithm Tabu-Search Algorithm applied to current KEPCO distribution power system and those of Branch Exchange Algorithm using initial operation point suggested in this paper, it shows how much the results are improved in aspects of load balancing, loss reduction and calculating time.

  • PDF

Release of Ammonia Odor from AAFA (Ammonia Adsorbed Fly Ash) by Installation of NOx Reduction System

  • Kim, Jae-kwan;Park, Seok-un;Lee, Hyun-dong;Chi, Jun-wha
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.437-445
    • /
    • 2016
  • This paper discussed the effect of ammonia concentration adsorbed on fly ash for the ammonia emission as AAFA (Ammonia Adsorbed Fly Ash) produced from coal fired plants due to operation of NOx reduction technologies was landfilled with distilled or sea water at closed and open systems, respectively. Ammonia bisulfate and sulfates adsorbed on fly ash is highly water soluble. The pH of ammonium bisulfate and sulfate solution had significant effect on ammonia odor emission. The effect of temperature on ammonia odor emission from mixture was less than pH, the rate of ammonia emission increased with increased temperature when the pH conditions were kept at constant. Since AAFA increases the pH of solution substantially, $NH_3$ in the ash can release the ammonia order unless it is present at low concentration. $NH_4{^+}$ ion is unstable in fly ash and water mixtures of high pH at open system, which is changed to nitrite or nitrate and then released as ammonia gas. The proper conditions for < 20 ppm of ammonia concentration released from the AAFAs landfilled in ash pond were explored using an open system with sea water. It was therefore proposed that optimal operation to collect AAFA of less than 168 ppm ammonia at the electrostatic precipitator were controlled to ammonia slip with less than 5 ppm at SCR/SNCR installations, and, ammonia odor released from mixture of fly ash of 168 ppm ammonia with sea water under open system has about 20 ppm.

Development of Supply Capability Calculation and Prediction Technology for Generator (발전기 공급능력 산정 및 예측 기술개발)

  • Kim, Euihwan;An, Youngmo;Hong, Eunkee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.

Nodal price of the power system considering voltage and transient stability (전압안정도 및 과도 안정도틀 고려한 모선가격 산정)

  • Kim, Yong-Ha;Lee, Bum;Choi, Sang-Gyu;Jo, Sung-Lin;Jung, Hyeon-Sung;Oh, Suk-Hyeon;Kim, Dong-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.129-130
    • /
    • 2006
  • This paper presents a optimal power flow calculation algorithm considering voltage and transient stability. In this method, voltage stability margin and transient stability constraints is incorporated into a optimal power flow calculation formulation to guarantee adequate voltage and transient security levels in power system. In addition, this paper provides the Effect of Nodal Price and decomposed Element in Power System Operation. This Effect can be applied in the Estimation of Electric rates because the Electric market will be Competitive Market. The proposed method is applied to IEEE-24 Reliability Test System and the results shows the effectiveness of the method.

  • PDF

A Planning study on the VR/AR Common Platform in Electric Power Industry (전력산업에서 VR/AR 기술동향 및 공통 플랫폼 구성방안 연구)

  • Chae, Changhun;Choi, Minhee;Yoo, Eungeun;Lim, Chanuk;Park, Jinwoo;Jung, Namjoon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.397-402
    • /
    • 2016
  • Recently, many ICT companies are trying to expand the ecosystem of VR (Virtual Reality) and AR (Augmented Reality). They are developing a variety of industries such as entertainment, education, e-commerce and so on. There is also contains the power, energy field. And application related with VR/AR will increase in power industry. Thus, Platform is necessary because there are problems such as re-use, interface with legacy system and security. We can expect the convenience and efficiency by developing VR/AR power platform. In this paper, we will discuss the trends of VR/AR technologies, possibilities of VR/AR in energy field, essential elements of VR/AR power platform. In the future, we expect to lead standards of VR/AR in energy and to develop a killer application such as Pokemon GO.