• Title/Summary/Keyword: K공사

Search Result 2,768, Processing Time 0.028 seconds

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Re-Organization of Port Governance in Gyeonggi Province (경기도의 항만 거버넌스 재정비방안)

  • Jung, Hyun-Jae;Lee, Dong-Hyon
    • Journal of Digital Convergence
    • /
    • v.18 no.11
    • /
    • pp.159-167
    • /
    • 2020
  • The purpose of this study was to present an alternative to improve the complex structure of Gyeonggi port governance. Based on previous research, advanced port operation, timely development of port, port safety management, and growth with the region were selected as the main roles of port governance. In addition, the importance of each role was analyzed by selecting the government-led port authority and government and local joint port authority as alternatives. As a result of the analysis, it was found that the establishment of the government-led port authority was reasonable in terms of advanced port operation, timely port development, and port safety management. On the other hand, local joint port authority is reasonable in terms of growth with the region. The implication of this study is that it is necessary to simplify port governance in Gyeonggi Privince and establish the government-led port authority in which Participation of local governments is required for linking regional administration and urban development plans.

Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition (해외건설공사관련 계약적 리스크 인자에 대한 연구 - FIDIC Red Book 1999년판 기준 -)

  • Hyun, Hak-Bong;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1153-1160
    • /
    • 2016
  • There have been many studies on the subject of risks in the Construction Industry and many useful results have been produced. However, risk studies on the conditions of contract, which is the most critical contract documents, has not been tried despite of its contractual function in the overseas projects. In this study, various contractual risks are identified for proper and reasonable evaluation of the contractual risks possibly encountered in the Tender and/or Contract stages of the Projects. For development of study, FIDIC Red Book 1999 Edition which is world widely recognised as a standard conditions of contract prepared for the projects designed by the Employer. Contractual risks are divided into three levels and applicable clauses are assigned to each appropriate risk factors. And table of major contractual risk factors are made using the classified levels of each factors with evaluation criteria as a result of this study. As this study is made only for the conditions of contract which is prepared for the construction contracts designed by the Employer, further studies for other types of contracts such as Design-Build (FIDIC Yellow Book), EPC/Turnkey (FIDIC Silver Book) and recently developed Design, Build and Operate type of contract (FIDIC Gold Book) are required to cover various types of projects executed in the world construction markets.

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Development of Data Warehouse for Construction Material Management (건설공사 자재 관리를 위한 데이터 웨어하우스 개발)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.319-325
    • /
    • 2011
  • During a construction project, construction managers must be provided with material information to help them to make decisions more efficiently without delaying the delivery of material. Construction work can be smoothly performed with the proper material supply. Construction duration depends on several material-related decisions, including the order, delivery, and allocation of material to the correct work location. Hence, it is worthwhile to introduce data warehouse techniques that generate subject-oriented and integrated data to construction material management. The data warehouse for construction material management can perform multidimensional analysis and then define KPIs (Key Performance Index) in order to provide construction managers with construction material information such as lead time, material delivery rate, material installation rate and so on. This research proposes a method of effectively facilitating large amounts of data in the operating systems during the construction management process. In other words, the proposed method can supply structured and multi-perspective material-related information using data warehouse techniques.

Evaluation of Track irregularity due to Adjacent Excavation Work on Serviced Urban Transit (도시철도 인접굴착공사에 따른 운행선 궤도의 궤도틀림 분석)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.481-487
    • /
    • 2020
  • In this study, finite element analysis was performed to evaluate the track irregularity of the existing track system on urban transit according to the large-scale excavation work that is constructed adjacent to the serviced line. Based on the numerical analysis, the effect of track irregularity generated during the step-by-step construction process was analytically derived, and the stability in terms of track deformation was evaluated through comparison with related standards. As the results, in the case of track irregularity items evaluated based on the relative displacement difference at a certain distance, such as alignment and vertical irregularity, it occurred most clearly at the location where deformation of the existing structure begins, such as the end point of adjacent excavation work. On the other hand, the overall vertical and horizontal displacement of the track was the largest deformation at the center of the construction section. The vulnerable position of the deformed side of the existing structure due to adjacent excavation is analytically proven that the both of the end point section and the center of the construction can be a vulnerable position in terms of track irregularity.

A Study on the Effects of KORAIL's CSR on Customers' Reliability and Loyalty (철도공사의 사회적 책임이 고객신뢰와 충성도에 미치는 영향에 관한 연구)

  • Yang, Jae-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.423-432
    • /
    • 2014
  • The purchasing behavior of consumers is related to service quality and corporate social responsibility (CSR). Therefore, CSR is recognized as an important factor in company strategies. This study determines the relationship between the CSR activities of KORAIL and the reuse intention and recommendation intention of the consumer. CSR is composed of economic, legal, philanthropic, ethical, and environmental responsibilities. In the results of the structural equation modeling analyses, legal responsibility and economic reliability affect the reliability of KORAIL and this reliability affects the customers' reliability and loyalty. This paper proposes a compliance program, wagon safety information, customized tour packages, and communication strategy that will increase customer's reliability and loyalty.

Study on Stress Variation in Slab and Support of Shearwall-Type RC Apartment during Construction (전단벽식 아파트에서 시공중 슬래브 및 동바리의 응력변화에 대한 연구)

  • Kim Young-Chan
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.161-165
    • /
    • 2004
  • Safety and efficiency in the construction of RC structures mainly depends on optimal operation of shore-slat systems. The disasters in RC construction are mainly due to excessive load applied to falsework and premature removal of supports. Development of sufficient compressive strength of early-age connote is essential for the safety of structures during construction. Most of studies on shore-slab interaction have focused on flat slab structures. In this study, load distributions in floor slabs and supports during the construction of shear wall-type RC apartment building structures is investigated using finite element analysis.