• Title/Summary/Keyword: Job-Shop

Search Result 273, Processing Time 0.023 seconds

Job shop에서 평균처리시간 최소화를 위한 할당 규칙

  • 전태준;박성호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.310-313
    • /
    • 1996
  • Mathematical programming method for finding optimal solution of job shop scheduling is inadequate to real situation because fo too much computation time. In contrast, dispatching rule is helpful for reducing compuation time but is not guaranted to find optimal solution. The purpose of this paper is to develop a new dispatching rule and procedure to minimize mean flow time whose result is near the optimal solution for job shop scheduling. First step is to select machine which have shortest finishing operation time among the schedulable operations. Second step is to select operation with regard to estimated remaining operation time. The suggested rule is compared with nondelay and MWKR rule for three examples, and is confirmed to be most effective to minimize mean flow time.

  • PDF

Lot-Streaming Flow Shop Problem with Delivery Windows (딜리버리 윈도우 로트-스트리밍 흐름 공정 문제)

  • Yoon, Suk-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.30 no.2
    • /
    • pp.159-164
    • /
    • 2004
  • Lot-streaming is the process of splitting a job (lot) into a number of smaller sublots and then scheduling these sublots in order to accelerate the completion of jobs in a multi-stage production system. Anew genetic algorithm (NGA) is proposed for an-job, m-machine, equal-size sublot lot-streaming flow shop scheduling problem with delivery windows in which the objective is to minimize the mean weighted absolute deviation of job completion times from due dates. The performance of NGA is compared with that of an adjacent pairwise interchange (API) method and the results of computational experiments show that NGA works well for this type of problem.

An Efficient Heuristic Technique for Job Shop Scheduling with Due Dates (납기를 갖는 job shop 일정계획의 효율적인 발견적기법)

  • 배상윤;김여근
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.3
    • /
    • pp.75-88
    • /
    • 1996
  • This paper presents an efficient heuristic technique for minimizing the objectives related to tardiness such as total tardiness, maximum tardiness and root mean of tardiness in the job shop scheduling. The heuristic technique iteratively improves an active schedule through exploring the schedule's neighborrhood, using operation move methods. The move operatio is defined on an active chain of tardy jobs in the active schedule. To find the move operations which have a high probability of reducing tardiness, we develop move methods by exploiting the properties of active chains. Our technique is compared with the two existing heuristic techniques, that is, MEHA(Modified Exchange Heuristic Algorithm) and GSP(Global Scheduling Procedure) under the various environmental with the three levels of due date tightness and several sized problems. The experimental results show that the proposed technique outperforms the two exissting techiques in terms of solution quality and computation time.

  • PDF

Job Shop System Analysis through DBR Simulation (DBR 시뮬레이션을 통한 Job Shop 시스템 분석)

  • Shim, Yun-Seop;Byeon, Ji-Hwan;Hwang, Soon-Hyun;Jeon, Tae-Bo
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.51-58
    • /
    • 2011
  • Simulation plays a pivotal role in the analysis of complex systems. In this study, a job shop manufacturing system has been analyzed through DBR (Drum-buffer-rope) simulation. Specific attention has been put to examine the rate of due-date achievement. We first derived key factors affecting the system performance. We then developed ARENA simulation program based on DBR of TOC (Theory of Constraints) concepts. Based on the performance measure, factors, and experimental design, we obtained the results. We have drawn meaningful results through examination of the results. The results obtained from this study may provide a good base for practical applications.

  • PDF

Multi-objective job shop scheduling using a competitive coevolutionary algorithm (경쟁 공진화알고리듬을 이용한 다목적 Job shop 일정계획)

  • Lee Hyeon Su;Sin Gyeong Seok;Kim Yeo Geun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.1071-1076
    • /
    • 2003
  • Evolutionary algorithm is recognized as a promising approach to solving multi-objective combinatorial optimization problems. When no preference information of decision makers is given, multi-objective optimization problems have been commonly used to search for diverse and good Pareto optimal solution. In this paper we propose a new multi-objective evolutionary algorithm based on competitive coevolutionary algorithm, and demonstrate the applicability of the algorithm. The proposed algorithm is designed to promote both population diversity and rapidity of convergence. To achieve this, the strategies of fitness evaluation and the operation of the Pareto set are developed. The algorithm is applied to job shop scheduling problems (JSPs). The JSPs have two objectives: minimizing makespan and minimizing earliness or tardiness. The proposed algorithm is compared with existing evolutionary algorithms in terms of solution quality and diversity. The experimental results reveal the effectiveness of our approach.

  • PDF

A Bottleneck-Based Production Scheduling under Fuzzy Environment (퍼지 환경하에서 품질수준 확보를 위한 일정계획에 관한 연구 -Bottleneck을 고려한 생산라인에서-)

  • Lee, Sang Wan;Shin, Dae Hyuk
    • Journal of Korean Society for Quality Management
    • /
    • v.23 no.3
    • /
    • pp.156-166
    • /
    • 1995
  • Job shop scheduling problem is a complex system and an NP-hard problem. Thus it is natural to look for heuristic method. We consider the multi-part production scheduling problem for quality level in a job shop scheduling under the existence of alternative routings. The problem is more complex if the processing time is imprecision. It requires suitable method to deal with imprecision. Fuzzy set theory can be useful in modeling and solving scheduling problems with uncertain processing times. Li-Lee fuzzy number comparison method will be used to compare processing times that evaluated under fuzziness. This study presents heuristic method for quality level in bottleneck-based job shop scheduling under fuzzy environment. On the basis of the proposed method, an example is presented.

  • PDF

An Investigation of the Effect of Re-entrance to the Same Station in a Job Shop Scheduling (Job Shop Scheduling에서 동일한 작업장에 대한 재투입 허용이 미치는 영향분석)

  • 문덕희;최연혁;신양우
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.47
    • /
    • pp.125-138
    • /
    • 1998
  • In this paper, we investigate the effect of re-entrance to the same work station in a job shop with multiple identical machines. System A is defined as the system in which re-entrance is not permitted, and system B is defined as the system in which re-entrance is permitted. By the analytical result of the queueing network, we find that the two systems have the same queue length distributions and utilizations under FIFO dispatching rule when all parameters are same. Simulation models are developed for various comparisons between the two systems, and simulation experiments are conducted for the combinations of five dispatching rules, two average workloads and two due date allowances. Five performance measures are selected for the comparison. The simulation results show that permitting re-entrance affects for some combinations of system environments.

  • PDF

A resource-constrained job shop scheduling problem with general precedence constraints

  • Ahn, Jaekyoung
    • Korean Management Science Review
    • /
    • v.10 no.1
    • /
    • pp.171-192
    • /
    • 1993
  • In this paper, a rule for dispatching operations, named the Most Dissimilar Resources (MDR) dispatching rule is presented. The MDR dispatching rule has been designed to maximize utilization of resources in a resource-constrained job shop with general precedence constraints. In shown that solving the above scheduling problem with the MDR dispatching rule is equivalent to multiple solving of the maximum clique problem. A graph theoretic approach is used to model the latter problem. The pairwise counting heuristic of computational time complexity O(n$^{2}$) is developed to solve the maximum clique problem. An attempt is made to combine the MDR dispatching rule with the existing look-ahead dispatching rules. Computational experience indicates that the combined MDR dispatching rules provide solutions of better quality and consistency than the dispatching rules tested in a resource-constrained job shop.

  • PDF

A Heuristic Method for n/m Job-Shop Scheduling Using the SDME (SDME를 이용한 n/m Job-Shop 스케쥴링에 대한 발견적 방법)

  • 김제홍;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.165-180
    • /
    • 1998
  • To make a scheduling for minimizing the tardiness of delivery, we present an efficient heuristic algorithm for job-shop scheduling problems with due dates. The SDME(Slack Degree Modified Exchange) algorithm, which is the proposed heuristic algorithm, carries out the operation in two phases. In the phase 1, a dispatching rule is employed to generate an active or non-delay initial schedule. In the phase 2, tasks selected from a predetermined set of promising target operations in the initial schedule are tested to ascertain whether, by left-shifting their start times and rearranging some subset of the remaining operations, one can reduce the total tardiness. In the numerical example, the results indicate that the proposed SDME algorithm is capable of yielding notable reductions in the total tardiness for practical size problems.

  • PDF

A Study on the Order Release Method in Job Shop (Job Shop에서의 주문 투입 통제 방안 연구)

  • Choi, Ki-Beom;Kim, Sung-Shick;Lee, Hong-Chul
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.2
    • /
    • pp.192-203
    • /
    • 1999
  • This paper deals with the order release problem for minimizing weighted earliness and tardiness as well as Work In Process (WIP) in dynamic job shop environments. A newly designed hierarchical order release mechanism is developed for efficient real-time control of the earliness/tardiness and WIP. The hierarchical order release mechanism consists of the order release plan and the order release control which is composed of two procedures. The experimental results show that the proposed order release mechanism is superior to other four order release mechanisms under overall simulation conditions of utilization rate, due-date allowances, and earliness/tardiness cost structures. In addition, the difference of total cost among the four dispatching rules is much more reduced in the proposed order release mechanism than in other release mechanisms.

  • PDF