• Title/Summary/Keyword: Item-based construction

Search Result 164, Processing Time 0.028 seconds

Scale Development of Job Stress for Home Care Nurses (가정전문간호사의 직무스트레스 측정 도구 개발)

  • Hong Jeong-Sook;Lee Ga-Eon
    • Journal of Korean Academy of Nursing
    • /
    • v.34 no.6
    • /
    • pp.1097-1107
    • /
    • 2004
  • Purpose: The purpose of this study was to develop a job stress scale for hospital-based home care nurses in Korea. The process was construction of the conceptual framework, development of the preliminary items, verification of the content validity, item analysis and test of the reliability. The preliminary items were based on literature review and in-depth interviews with home care nurses. As a result, eight categories and sixty items were selected. These were reviewed by seven specialists for content validity and finally fifty one items were chosen. Data was collected from 180 home care nurses who were engaged in 87 hospitals from August to September 2003. The result of item analysis one was excepted, The final item count was 50. Categories were as follows: overload work(8 items), lack of specialized knowledge and technique(5 items), ethical dilemma(4 items), role conflict(5 items), interpersonal relationships(6 items), visiting home environment(9 items), driving conditions(4 items) and lack of administrative support(9 items), The reliability of the scale by Cronbach's alpha was .948 and the domain's reliability ranged from .649 to .841. The result of this study could be used to measure the job stress of home care nurses. However, for further validity and reliability, repeated studies will be necessary.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Study on the Investment Priority Item of Educational Facilities using AHP Method;Focused on Elementary ${\cdot}$ Middle ${\cdot}$ High school of Chungcheong-Namdo (AHP기법을 이용한 교육시설물 투자 우선순위 Item 도출에 관한 연구;충청남도 초 ${\cdot}$${\cdot}$ 고등학교를 중심으로)

  • Kim, Sung-Kyum;Lee, Eun-Dong;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.98-102
    • /
    • 2006
  • This study was conducted to derive a priority of investment in educational facilities by collecting and analyzing investment records from elementary, middle, and high schools in Chung Nam area. In addition, the AHP survey and analysis were performed in order to draw the priority item in the educational facility improvement. Students, parents, teachers and a educational facility managers from those schools provided their opinions and data for the AHP study. As a result of the study, the actual investment-cost and a lack of educational facilities were found. A priority item based on the above study was derived which can be used to increase user's satisfaction in the educational facilities. The result of this study can be used as a basis to improve the environment of the educational facilities.

  • PDF

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

A Case Study on the Mentorship Mathematics Education for the Gifted with Construction Based on the Aesthetic Experiences. - Focused on Waldorf Education - (미적 체험을 강조한 수학 영재교육 프로그램 개발 연구 - 발도르프교육의 작도교육의 활용 -)

  • Cho, Youngmi;Joung, Youn Joon
    • Journal of the Korean School Mathematics Society
    • /
    • v.16 no.3
    • /
    • pp.621-636
    • /
    • 2013
  • In this paper we intended to present the case of mentorship program for the gifted in elementary mathematics education, which is related with Waldorf education. We installed the program to four six-grade students during six months. We focused on cultivating integrated perspective, aesthetic perspective and substantial skills. For the aim we dealt with the item, construction based on the aesthetic experiences. Finally we presented three main ideas, construction of regular polygons and flowers, construction of islamic design, and farmland cleanup with construction. We also contained the students' project in this paper.

  • PDF

A study on the Increase in Construction Cost for Zero Energy Building (제로에너지건축물의 공사비 증가분 산출에 관한 연구)

  • Shim, Hong-Souk;Lee, Sungjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.603-613
    • /
    • 2021
  • As a core policy for achieving the goal of reducing greenhouse gas emissions in the building sector, Korea has enforced the mandatory certification of zero energy buildings for new public buildings from 2020. This study suggests energy-saving technologies and economic factors that building officials can refer to for decision-making on the implementation of zero energy buildings. For this study, the construction cost for the energy item of a building was analyzed by collecting the building energy efficiency level certification data and detailed construction cost statement data from public institutions for the last three years. Based on the building energy efficiency certification data, each energy item of the baseline building was derived, and the energy performance of the zero energy building was derived through repetitive simulations by gradually increasing the energy performance value of the baseline building. By applying the analyzed construction cost, the construction cost for each energy item of the baseline and zero energy buildings was derived. As a result, the lighting equipment contributed up to 10.5% energy savings, and the increase in construction cost of the cooling and heating system was at least 9.1%.

Template database development for evaluation of CO2 emissions from building using BIM (건축물 CO2 배출량 평가를 위한 BIM Template DB 구축에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Keum, Won-Seok;Kim, Tae-Hyoung;Roh, Seung-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.147-148
    • /
    • 2012
  • With the rise of BIM application and green building assessment, studies on assessment of CO2 emissions from buildings using BIM are needed. In accordance with the requirements, this study aims at developing BIM Template database, as a part of development of CO2 assessment technology using BIM. Based on the research of construction materials, this study develops database by applying Procurement Agency Item Code to BIM Template. The results of this research makes it possible to assess CO2 emissions of materials with BIM Template and building data modeling implementation.

  • PDF

DEVELOP AND USE OF STUD PENETRATE WELDING TECHNOLOGY IN COMPOSITE FLOOR OF STEEL STRUCTURE

  • Fu, Jifei;Zhang, Youquan;Ma, Dezhi
    • Proceedings of the KWS Conference
    • /
    • 2002.10a
    • /
    • pp.349-354
    • /
    • 2002
  • Stud penetrate welding is an important item of composite floor in modern steel structure, especially in high-rise buildings. But it is difficult to get satisfied welding quality due to all kinds of factors. In this paper, the author put forward a new welding procedure named method of energy control through analysis and comparison of the wave curves of stud welding based on large amount of experiments and tests in laboratory and construction areas. The use of this welding procedure in some large engineering in recent years proved that this method is effective and practicable

  • PDF

Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication (Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석)

  • Jang, Se-Jun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

Establishment of Assessment Criteria for Apartment Housing Remodeling Performance Grading Indication System (공동주택 리모델링 성능등급표시제도에 있어서 평가기준 설정)

  • Baek, Cheong-Hoon;Kim, Soo-Am;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.153-154
    • /
    • 2018
  • It is required that an evaluation method that can present the performance after remodeling to residents objectively as the increase in demand for remodeling. New construction is able to evaluate through housing performance grading indication system. However, there are some parts that are difficult to apply as assessment criteria of new construction in remodeling. The purpose of this study is to establish the assessment criteria direction for each item in remodeling performance evaluation. In conclusion, we set up institutionalized items for remodeling performance evaluation, and propose to assessment criteria direction based on the characteristics of remodeling on extracted items.

  • PDF