• Title/Summary/Keyword: Investment projects

Search Result 631, Processing Time 0.023 seconds

Study on the Trend Analysis and Direction of Remodeling of Middle Schools - Case Study of Middle Schools in Gyeonggi Province - (중학교(中學校) 리모델링의 경향분석 및 방향설정에 관한 연구 - 경기도 중학교 사례를 중심으로 -)

  • Yoon, Jun-Seon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.13 no.1
    • /
    • pp.5-16
    • /
    • 2006
  • The study is intended to analyze the tendency of the remodeling for the middle schools in Gyeonggi Province, with the potential challenges thereof, thereby determining the principle for the remodeling projects in the days to come. To that end, the analysis to identify the school facilities in a bid to accommodate the current curriculum was conducted, along with the case study on remodeling projects. The $7^{th}$ curriculum demands for a significant change in school facilities. The number of student in a class that has been on the decline, despite of steady increase in number of schools, and the population getting concentrated in Seoul and its suburbs have resulted in an increase in number of class. Consequently, more investment in the facility, rather than improving a substantial education environment, has been made. The study, thus, is aimed at identifying the facility of the middle school required by the $7^{th}$ curriculum, as well as implementing a fact-finding investigation into the remodeling works for middle schools in Gyeonggi Province so as to come up with the guideline for remodeling projects.

Economic Effects of the Management Model far Environment Pollution in Gwangyang Bay (광양만 환경오염 관리모델 연구의 경제적 파급효과 분석)

  • Nam Kwanghyun;Kwon Sukjae;Oh Weeyeong
    • Journal of Korea Technology Innovation Society
    • /
    • v.7 no.3
    • /
    • pp.657-679
    • /
    • 2004
  • The purpose of this paper is to measure economic impact of marine environment conservation research development project. Benefit-Cost(B/C) analysis and Contingent Valuation Methods(CVM) are used to valuate the benefits from the research development projects. A period of three years for research development fund is considered as a part of the costs and adjusted to the net present value (NPV) of the 2002 ending period. The environmental charges for marine environment improvement are considered for the benefit measurement. The benefits are estimated by using monthly average willingness to pay, which is 2,289 Korean won. The contribution of the developing a management model for environmental pollution in the Gwangyang Bay is evaluated utilizing survey data and information. Based on the assessment by expert groups, the contribution of the model was 37.5%. The research results showed that B/C ratio is 20.61, NPV is 89,200 million Korean won, and social rate of return is 185.7%. When the level of contribution is over 1.83% at the assessment of potential influence, it is recognized to be economically feasible. This research presents a quantitative framework for Research and Development projects for marine environment conservation, and it can be applied to decision making for the investment size of R&D projects.

  • PDF

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

Evaluating the Economic Feasibility of Green Construction Projects using FiT and CDM Support Mechanisms (녹색 건설 사업의 FiT 및 CDM 보조방안에 의한 수익성 향상 분석에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.123-133
    • /
    • 2013
  • Green infrastructure projects have the potential to reduce global warming and deliver sustainable energy solutions. Recently, the construction industry has been expanding their portfolios in New and Renewable (NRE) projects. However, the economic feasibility of NRE projects have not been validated and construction companies are not acquainted with their associated risks. This research performed a two-tiered feasibility study of the domestic projects registered for CDM in the UNFCCC. The first phase involved calculating the average IRR and NPV of the domestic CDM projects, which showed that their profitability to be very low. In the second phase, four NRE projects (Solar, Wind, Hydro, Landfill Gas) were selected and additional income generated from Feed-in-Tariff and CER sales were added to determine the improvements in the projects' IRR and NPV. Results indicate that Solar and Landfill Gas projects benefited the most from the two support mechanisms, while benefits to Wind and Hydro projects were minimal. While the Landfill Gas project had the highest IRR, the Wind project was the most investment attractive due to its NPV and minimal dependency on FiT and CER sales. Construction companies should enter into NRE projects with a long term view as related technologies mature.

정보통신기술의 효과적인 기술이전 전략

  • 김영웅;문태희;손소영
    • Journal of Technology Innovation
    • /
    • v.11 no.1
    • /
    • pp.51-77
    • /
    • 2003
  • Although Korean government has made a great deal of investment on R&D projects, corresponding amount of efforts has not been effectively made for their commercialization. Effective technology transfer can help to spread the results of IT R&D programs. The main objective of this study is to provide some strategies for successful commercialization in lieu of technology transfer program at home and abroad. We summarize the present situation of IT R&D programs and analyze the obstacles to improve the process of materializing technology transfer.

  • PDF

The Improvement on Proposal Evaluation System of National Defense Core Technology R&D Projects (국방핵심기술 연구개발과제의 선정평가 개선 연구)

  • Kim, Chan-Soo;Cho, Kyu-Kab
    • Journal of Technology Innovation
    • /
    • v.15 no.2
    • /
    • pp.123-152
    • /
    • 2007
  • The striking characteristic of the contemporary global security environment is that the nature of threats has become diverse and complex. For example, transnational and non-military threats including terrorism and proliferation of weapon of mass destruction has increased. In this security environment, Advanced countries funnel their investments for defense budgets into the assurance of key force capability and R&D of cutting-edge core technologies, in consideration of future battlefield environments so as to get an edge on not only defense science and technology but also intelligence capabilities. As shown by past practices of the korea's defense acquisition, the ministry of national defense has tried to enhance its force capabilities in the short-term by purchasing foreign weapon systems rather than by investing in domestic R&D. Accordingly, the technological gaps between the korea and advanced countries were widened due to both insufficient investment in development of domestic technologies and avoidance of technological transfer by advanced countries. Thus, for the effective execution of the R&D budget and the successful performance of the projects, the importance of selection, management and evaluation of the R&D projects is emphasized. So, The objective of this study is that the analysis of the proposal-selection evaluation system for the realization of the successful defense core technology R&D projects. This study focused on the improvement of the proposal-selection evaluation model which can be applicable to the national defense core R&D projects. Using the improved proposal-selection evaluation system, we propose a model to enhance the reliability of the national defense core technology R&D project evaluation system.

  • PDF

Benefit Analysis and Profit Business of Fishery Sector about Tidal Power Plant in Garolim Bay (가로림만 조력발전 사업관련 수산부문 수익사업 도출과 편익 분석)

  • Lee, Kwang-Nam;Jung, Jin-Ho
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.1
    • /
    • pp.218-229
    • /
    • 2015
  • While promoting a variety of projects by using sea space, there has been a lot of social controversy among the stakeholders based on the results of the analysis. In particular, the benefits of fisheries sector were over-estimated and occurred a lot of opposition from fishermen and environment groups. In order to this solve, we have been studied focussed such as excavation of new projects, the method and result of the estimated benefits for fisheries sector. With regard to the tidal power plant of Garolim, we came up with five kinds of problems such as doing not reflect of the cost of the initial investment, over unit production, over unit price, excessive selection of breed, issues of cost of production in benefits study of fisheries sector derived previously. In order to these problems, we have derived new profitable projects based on the initial materials such as improvement of raising breed, discharge project of fingerlings and a small sea ranch project. As a result, previous study was analyzed in 30.2 billion won(1993), 54.8billion won(2009), but this study was estimated to 26.4 billion won and differences of benefits amount were occurred. In a previous study was calculated benefits by simple method, but this study came up with new projects for fisheries sector and because we estimated benefits considering new project. The method for benefits calculations for fisheries sector was not attempted in previous studies and in this study, we approached for the first time Also, in this study suggested new method to increase incomes fishermen such as development of suitable ranch breeding for the marine environment, ranch license(limited license), development of fisheries resources and the operation of fisheries facility. In the future, we hope to be helpful for the same field of study.

A Survey of the Cost Benefit Analysis to R&D Projects of Selected Laboratories. (연구개발프로젝트의 비용효과분석 활용 실태 - 주요 기업연구소의 조사결과를 중심으로 -)

  • 서현진
    • Proceedings of the Technology Innovation Conference
    • /
    • 1998.06a
    • /
    • pp.38-56
    • /
    • 1998
  • We are faced with the crisis of the R&D investment because of the effects of the IMF conditions. Most of the laboratories are going to restructure by the cutting off of money, man power and the reduction of R&D thema. Therefore it is necessary to allocate the R&D resources effectively to the R&D projects. The evaluation and the selection of the R&D projects have been recognized as the most important process for the allocation of the R&D resources. The result of the KITA(1997) shows that the commercial success rate of the R&D from new-product brain storming is only 5.8%. This study aims to analyze the actual conditions of the cost benefit analysis(CBA) of R&D projects of selected laboratories and to study measure methods of the R&D benefits. The research method of this study reviews the CBA of R&D firstly, and surveys 200 selected high ranking labs of the R&D expenditures. For the comparison of the results between '87 and '97, this survey used the same questionaries for each year. As the result of the survey only 27 labs(response rate 13.5%) responded. The result of the '97 survey is as follows : The CBA is used by 44% of responding labs. The economic evaluation method for the R&D project selection is used by 48% of labs and this numbers increased by over 10 percents points compared with the result of '87. The CBA is used for about 40% about each of the budget preparing and the budget analysis, and by 30% of labs to analyze sales and expenditures of the overall period of the project. As the measurement of benefits of R&D projects, 30% of labs responded that it is impossible to measure the benefits, and 20% of labs measured the benefits between sales and expenditures of the R&D project.

  • PDF

Performance Evaluation System Framework for Natural Disaster Research and Development Projects (자연재난분야 연구개발 사업의 특성을 고려한 성과지표 및 성과평가체계 개발)

  • Kim, Du-Yon;Kim, Sang-Bum;Kwak, Hyun-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.118-129
    • /
    • 2013
  • Due to the recent surge in natural disasters, with rising social concerns, investment on research & development (R&D) project in natural disaster mitigation area is continuously increasing. However, current R&D performance management system of natural disaster mitigation area does not properly reflect characteristics and social ripple effects of R&D projects. It is indicated that mainly due to the current performance index consists of easy-quantification factors and the performance evaluation system adopts simple aggregation method. Therefore, the purpose of this study is to develop new performance evaluation system considering characteristics and social ripple effects of natural disaster mitigation R&D projects. To this ends, this study derived 3-dimensional performance measurement index through literature review and natural disaster mitigation R&D projects analysis. Finally, based on the derived performance measurement index, this study suggested new and effective performance evaluation system for natural disaster mitigation R&D projects.