Up to the present, the evaluation measures in the production and inventory management have been studied under the pre-condition that the costs for major factors(e.g,. cost of carrying inventory, cost of demand shortage) are given easily, although in practice, it is difficult. The case in which multiple participants have a different viewpoints in production and inventory management has not been studied, in spite of its frequent occurrence. This study suggests a production and inventory model with multiple objectives corresponding to major factors and the related interactive algorithm based on the preference structures of participants. The problem can be solved through a weighting vector generated by an interaction with participants. The concept of equity is also used in order to guarantee the reasonable distribution of group utility in determining the individual relative weights of participants. This study includes the reality of the model and the decision process in the production and inventory management.
This paper considers the robust inventory control problem introduced by Bertsimas and Thiele [4]. In their paper, they have shown that the robust version of the inventory control problem can be solved by solving a nominal inventory problem which is formulated as a mixed integer program. As a proper generalization of the model, we consider the problem with non-stationary cost. In this paper, we show that the generalized version can also be solved by solving a nominal inventory problem. Furthermore, we show that the problem can be solved efficiently.
본 연구는 다양한 공급망 내 재고관리 방법 중 최적의 방법을 찾아내는 것을 목적으로 하고 있다. 비교대상 재고관리 방법은 Min-Max, 정기, 정량, 목표재고관리 방법으로 각 제품별 리드타임과 수요를 달리하여 구성하였다. 또한 공급사슬 망의 단계가 2단계인 경우와 3단계인 경우를 구분하여 공금망 단계를 줄였을 경우의 결과를 분석한다. 시뮬레이션 모형은 8개의 시나리오로 나뉘며, 각 시나리오는 주문방식과 단계로 구분할 수 있다. 시뮬레이션을 위한 입력 자료는 기존의 선행연구 결과와 실제데이터를 토대로 하였다. 시뮬레이션의 평가는 매출액, 총판매건수, 총배송비, 총결품량, 결품횟수, 결품손실금, 평균 재고량, 재고관리비, 순이익으로 실시한다. 시뮬레이션 결과 목표재고관리 방법이 가장 우수하게 나타났으며, 목표재고관리 시스템은 기존의 재고관리 방법을 사용한 시나리오보다 순이익 및 재고 등의 측면에서 우수한 결과를 나타냈다. 또한 기존의 공급사슬에서 한 단계 공급망을 줄였을 경우 수익이 증가하는 것을 확인할 수 있었다. 본 연구 결과는 목표재고관리 시스템을 추가적으로 고려하고 있다는 것과 공급사슬의 단계를 줄일 수 있는 개선 방안을 논의했다는 것에 의의를 둘 수 있다.
Since high-rise building construction sites are usually located in crowded city areas, sufficient spaces for the inventories of key materials are rarely available. This spatial constraints have been one of the critical challenge that may cause productivity loss and increasing costs of the high-rise building construction projects. The proper material inventory management is certaing a key to the success of high-rise building construction projects as it handles difficulty of securing material stock yards, changes in demands, uncertain delivery time through integrating the construction schedules and actively responding to the key materials attributes. In this light, this research analyzes the latest inventory model, (Q,r) model, in accordance with the high rise building characteristics. This research suggests an optimal inventory management of re-bar considering various demands and lead times. The case study is also presented with regard to the re-bar inventory management.
The ultimate goal of inventory management is to decide the timing and the quantity of ordering in response to uncertain demands. Recently, some researchers have focused upon an impact of distortions in the information, e.g., customer order cancellation, on an economical inventory policy. The customer order cancellation is considered a kind of distortions in demands, because a demand that is eventually cancelled is equivalent to a phony demand. Also, there are some additional distortions in the inventory information. For instance, the procurement of suppliers may include some nonconforming items as a result of imperfect production and inspection by the suppliers, and/or damage in transit. The nonconforming item should be considered a kind of distortions in the inventory information, because the nonconforming item is equivalent to a phony stock. In this article, we consider an inventory model under the situation that customers can cancel their orders and the procurement of suppliers may include some nonconforming items. Then, we introduce the customer order reservation into the inventory model for the purpose of avoiding the costly backlogs, because the customer order reservation gives retailers a period to fulfill customer's requests. We formulate a periodic review (s, S) inventory model and investigate the economical operation under the situation mentioned above. Further, through the sensitivity analysis, we show the impact of these distortions and the effect of the customer order reservation on the inventory policy.
The conventional inventory models are concerned with the items of which utilities and amount of numbers are constant over time. But in practice the items in inventory systems are increasing or decreasing. This study is concerned with the development of ameliorating inventory models. The ameliorating inventory is the inventory of goods whose utility increases over the time by ameliorating activation. The term ameliorating inventory is used in this paper at least, since the terminology is not standard well known. This study is performed according to areas; one is an economic order quantity(EOQ) model for the items whose utility is ameliorating in accordance with Weibull distribution, and the other is a partial selling quantity(PSQ) model developed for selling surplus inventory accumulated by ameliorating activation. Computer programs are developed to obtain the optimal ordering and selling quantity. Numerical examples to illustrate the effect of ameliorating rate on inventory polices are shown at the end of this paper.
건설자재의 경우 물량 확보 차원과 소량 반입의 어려움, 공정 지연 등의 이유로 인하여 현장에 상당량의 재고를 보유하여 왔다. 특히 철근의 경우 변동요인이 많아 일반적으로 1개월 이상의 여유 재고를 보유하여 왔다. 하지만 이렇게 재고의 규모가 필요이상으로 과도할 경우 재고유지비용이 증가하게 되고 자재적치에 많은 공간이 소요되어 현장 내 이동에 불편을 겪을 수도 있으며 생산성이 저하 되어 낭비요인으로 작용하게 된다. 반면에 재고량이 부족할 경우에는 예상치 못했던 수요가 발생하거나 자재수급에 어려움이 생기는 경우 대응하기가 어려우며 자재부족에 따라 작업수행에 지연을 가져오게 되어 추가비용을 발생시킨다. 본 연구는 건설현장의 여러 가지 자재 중에서 구성 비율이 가장 높고 지속적인 수요에 의해 작업이 이루어지는 철근자재를 대상으로 재고관리 현황을 살펴보고 적정 재고관리 방안을 제시하였다. 먼저 일반적인 재고의 개념 및 재고관리 시스템에 대하여 살펴보고 철근 가공 ${\cdot}$ 조립과정의 적용성 여부를 판단하였다. 이후 자재의 리드타임 변이와 리드타임 동안의 자재의 수요율 변이를 고려하여 자재의 재주문 시점을 언제로 할 것인지를 결정하고 주문비용 및 재고유지비용, 자재 수요량을 고려하여 주문량을 얼마로 할 것인지를 결정하는 방법을 제시하였다.
SCM activities in a company are considered as total innovation through synchronizing supply and demand while maintaining appropriate inventory level and reducing the business operating costs. Until now, even several researches are carried out on the SCM performance of the companies which have introduced and been operating SCM, the research on the cost analysis for the inventory which occurs frequently on supply chain is still insufficient. Especially, for the electronics industry in which the product depreciation is sharp caused by the short product life cycle and the complexity of distribution channels, even the inventory related costs are a major factor in business management, since the current estimated criteria of inventory costs are limited to the interest and maintenance management costs, the criteria do not reflect the total influence of the product depreciation and lost opportunity cost which are related to the business management. Furthermore, even though the rapid price drops of the distributor inventory caused by the frequent new model launch can be covered by the product manufacturers, the scale of total costs related to the inventory has not been conceived because the price compensation is traditionally considered as a market costs. In this research, we analyzed the inventory characteristics of electronics industry in which the price depreciation happens frequently, newly defining the estimated criteria of the product total inventory cost which includes price depreciation from the product manufacturers' view. Finally we focus on the case study of a representative electronics company and verify the scale of the influence on management performance.
A inventory management system of the manufacturing industry has a model of different kinds according to the objective and the situation. A inventory management system needs superior system technique in demand forecast, economical efficiency, reliability and application for stable supply of the finished goods, the raw materials and the parts. This paper proposes a demand forecast method based on fuzzy structured neural network, which uses min-operation and trapezoid membership function of fuzzy rules. So we can have an intelligent inventory management system for optimized decision-making of forecasting data with expert's opinion in fuzzy environment. This inventory management system used an intelligence agent and it could be adapted to asystemenvironmentchangeinorder.
Journal of the Korean Data and Information Science Society
/
제10권1호
/
pp.271-277
/
1999
본 연구에서는 섬유산업의 재고관리를 위한 정보시스템 구축사례를 소개한다. D 섬유회사를 대상으로 수주, 생산, 납품 및 재고등과 관련된 전 정보를 체계적으로 관리하여, 수주 및 생산 계획을 위한 가공능력분석 또는 납기를 지킬 수 있도록 하는 생산일정 계획 등의 의사결정이 합리적으로 될 수 있도록 하는 통합 재고정보 관리시스템을 구축한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.