설계도면 작성기준 최적화 방안에 관한 연구 (A Study on the Optimization plan for Standardization of Engineering Drawing)

  • 김석수;송재호
    • 한국산업융합학회 논문집
    • /
    • 제23권1호
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Multi-factors Bidding method for Job Dispatching in Hybrid Shop Floor Control System

  • Lee, Seok--Hee;Park, Kyung-Hyun;Bae, Chang-Hyun
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제1권2호
    • /
    • pp.124-131
    • /
    • 2000
  • A shop floor can be considered as and importand level to develop a Computer Integrated Manufacturing system (CIMs). The shop foor is a dynamic environment where unexpected events contrinuously occur, and impose changes to planned activities. The shop floor should adopt an appropriate control system that is responsible for scheduling coordination and moving the manufacturing material and information flow. In this paper, the architecture of the hybrid control model identifies three levels; i.e., the shop floor controller (SFC), the cell controller(CC) and the equipment controller (EC). The methodology for developing these controller is employ an object-oriented approach for static models and IDEF0 for function models for dispatching a job. SFC and CC are coordinated by employing a multi-factors bidding and an adapted Analytic Hierarchy Process(AHP) prove applicability of the suggested method. Test experiment has been conducted by with the shopfloor, consisting of six manufacturing cells.

  • PDF

A New Method to Handle Transmission Losses using LDFs in Electricity Market Operation

  • Ro Kyoung-Soo;Han Se-Young
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권2호
    • /
    • pp.193-198
    • /
    • 2005
  • This paper proposes a new method to handle transmission line losses using loss distribution factors (LDF) rather than marginal loss factors (MLF) in electricity market operation. Under a competitive electricity market, the bidding data are adjusted to reflect transmission line losses. To date the most proposed approach is using MLFs. The MLFs are reflected to bidding prices and market clearing price during the trading and settlement of the electricity market. In the proposed algorithm, the LDFs are reflected to bidding quantities and actual generations/ loads. Computer simulations on a 9-bus sample system will verify the effectiveness of the algorithm proposed. Moreover, the proposed approach using LDFs does not make any payments residual while the approach using MLFs induces payments residual.

Analysis of Price-Clearing in the Generation Bidding Competition

  • Chung, Koohyung;Kang, Dongjoo;Kim, Balho H.;Chun, Yeonghan
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권4호
    • /
    • pp.243-253
    • /
    • 2004
  • As deregulation evolves, pricing electricity becomes a major issue in the electric power industry. Participants in the competitive marketplace are able to improve their profits substantially by effectively pricing the electricity. In this paper, game theory is applied to analyze price-clearing in the generation bidding competition with the competition modeled as the non-cooperative and complete information game. The result of this analysis can be useful in understanding spot price-clearing of electricity as well as GENCOs' strategic behavior in the competitive electricity market.

THE PRICE OF RISK IN CONSTRUCTION PROJECTS: CONTINGENCY APPROXIMATION MODEL (CAM)

  • S. Laryea;E. Badu;I. K. Dontwi
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.106-118
    • /
    • 2007
  • Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

  • PDF

국내 설계시공일괄입찰방식 개선방안 (Improvement of the Design-Build Bidding in the Domestic Construction Industry)

  • 김수현;전민정;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.410-413
    • /
    • 2003
  • 건설시장에서 경쟁력을 강화하고 국제정책에 대응하기 위하여 설계업체와 시공업체의 협력을 장려하는 설계시공 일관입찰방식이 대두되었다. 설계시공일괄입찰방식은 공기단축, 사업비 절약, 품질 향상을 위한 전도 유망한 입찰방식이지만 국내 건설산업에서는 제도의 미비, 관계자들의 경험 및 인식부족 등으로 이러한 장점을 살리지 못하고 있다. 이에 따라 본 연구에서는 국내 공공공사 설계시공일괄입찰방식에서의 문제점을 사업비, 품질, 사업기간의 측면에서 분석하여 개선방안을 제안하고자 한다.

  • PDF

CRITICAL DRIVING FORCE FOR CONTRACTOR'S OPPORTUNISTIC BIDDING BEHAVIOR IN PUBLIC WORKS

  • Min-Ren Yan ;Wei Lo ;Chien-Liang Lin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.417-423
    • /
    • 2005
  • Contractor's opportunistic bidding behavior refers to contractor's deliberate low-bid, which cannot accord with the cost, and expectation for beyond-contractual reward (BCR), the compensation earned through cutting corners or claims after undertaking the construction project. This research applies System Dynamics to develop a model of contractor's pricing with consideration for dimensions of "cost", "market competition", and "BCR". Iterative computer simulations were performed to analyze the effects of contractor's pricing on the market price. The results were then examined by statistical analysis on data collected from 44 highway projects in Taiwan. It is found that the critical force driving the contractors to bid opportunistically is their excessive expectations in BCR under the current environment. Within the price competition mechanism, if the problem of BCR exists, even if the bidding system is further improved, contractors would still prefer opportunistic bidding behavior, and eventually make the whole construction industry operate ineffectively. Therefore, it is crucial to remedy the aforementioned BCR problem by more effective management policy.

  • PDF

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

UN조달시장 진출 활성화를 위한 종합정보시스템 및 지원체계 구축방안 (A Study on Building up Integrated Information System & Assistance System to Increase UN Procurement Market Access)

  • 배정한;김귀옥
    • 통상정보연구
    • /
    • 제6권3호
    • /
    • pp.269-296
    • /
    • 2004
  • International Procurement refers to the actions governments and public institutions worldwide buy goods and services. With the WTO agreement on government procurement, most procurements are realized by bidding, which accelerates the opening-up of International procurement. Today International procurement has drawn the world's attention. The scale of international procurement market has been developing fast, reaching about US$ 5.55 trillion this year, In our country, however, due to the difficulty in initial market access to local procurement, the participation in taking international procurement is quite inactive, especially when compared with our exporting scale. The UN procurement market has procurement rules that countries which make contributions to UN and developing countries are favorably treated, and non-discriminatory and public competition in bidding and the optimum purchase are kept, and so on. It has its own head office and many subsidiary agencies. Actually the international procurement market offers an international marketplace for suppliers of all tangible goods and services. Therefore, UN and international procurement markets are great significant foreign markets to our country. But our country lagges behind in international procurement as it has not reached to our monetary contribution to UN. Therefore, it's essential to stimulate our company's participations in the UN procurement market. To fulfil this purpose, first of all, this study analyzes the current status of UN procurement market and Korea's current participation status. Then it investigates the procurement information system of UN and Korea's international procurement market information system as well as assistance system. Based on the above, by studying on the actual spots of the interview investigations on the registered firms in UNPD, this thesis discloses the problems with the Korea's national information system and assistance system on UN procurement market. Finally, this study raises the efficient plan for the integrated international procurement information system & assistance system.