• Title/Summary/Keyword: Integrated test

Search Result 2,110, Processing Time 0.04 seconds

Performance Study of Wind Augmentation Device for Building-integrated Wind Power (건물 풍력발전을 위한 집풍장치 성능 연구)

  • Shin, Jae-Ryul;Park, Jae-Jeun;Kim, Han-Young;Kim, Dae-Young
    • The KSFM Journal of Fluid Machinery
    • /
    • v.15 no.4
    • /
    • pp.42-49
    • /
    • 2012
  • This study is performance estimation of wind augmentation device for BiWP(Building-integrated Wind Power) which recently attracts attention as a local power. various structures are installed on a rooftop of residential complex buildings. Changing a profile of these, we designed a configuration that is able to capture much air and increase exit velocity. To estimate wind augmented effect of this device, we compared numerical analysis results with wind tunnel test results. Results show that exit velocity is increased from 24% to 60% by wind augmented device on a rooftop of building.

Monitoring System Design for the GPS/INS Integrated Navigation System (GPS/INS 통합 항법 시스템용 모니터링 시스템 설계)

  • 한상재;오상헌;황동환;이상정
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.3
    • /
    • pp.242-250
    • /
    • 2003
  • We propose the monitoring system scheme for the CPS/INS integrated navigation system. The design requirements of the monitoring system are suggested and the software scheme based on GUI is proposed. The proposed monitoring system consists of an I/O interface part, a navigation data display part, and a post-processing part. The I/O interface part is responsible for data communication between the monitoring system and a navigation computer unit. The navigation data display part provides various display methods to show the navigation data to user in real-time. The post-processing part collects the navigation data to analyze the performance of navigation system. The proposed monitoring system software was developed using the Visual C++ programming language and a van test was carried out to demonstrate the real-time operation of the monitoring system. The test result shows that the proposed monitoring system can be effectively applied to the CPS/INS integrated navigation system.

Effect of Vibration Suppression Device for GNSS/INS Integrated Navigation System Mounted on Self-Driving Vehicle

  • Park, Dong-Hyuk;Ahn, Sang-Hoon;Won, Jong-Hoon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.11 no.2
    • /
    • pp.119-126
    • /
    • 2022
  • This paper presents a method to reduce the vibration-induced noise effect of an inertial measurement device mounted on a self-driving vehicle. The inertial sensor used in the GNSS/INS integrated navigation system of a self-driving vehicle is fixed directly on the chassis of vehicle body so that its navigation output is affected by the vibration of the vehicle's engine, resulting in the degradation of the navigational performance. Therefore, these effects must be considered when mounting the inertial sensor. In order to solve this problem, this paper proposes to use an in-house manufactured vibration suppression device and analyzes its impact on reducing the vibration effect. Experimental test results in a static scenario show that the vibration-induced noise effect is more clearly observed in the lateral direction of the vehicle, but can be effectively suppressed by using the proposed vibration suppression device compared to the case without it. In addition, the dynamic positioning test scenario shows the position, speed, and posture errors are reduced to 74%, 67%, and 14% levels, respectively.

Implementation of a Tightly Coupled Real-time GPS/INS Integrated System (강결합 방식의 실시간 GPS/INS 통합 시스템 구현)

  • 오상헌;문승욱;김세환;황동환;이상정
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.409-409
    • /
    • 2000
  • In this paper, the implementation of a tightly coupled real-time GPS/INS integrated system is discussed. The hardware is developed for any GPS receiver and any IMU. The navigation software is modularized by tasks, so that can be easily modified when the integrated system is restructured. A van test was performed to show the feasibility of the proposed system.

  • PDF

Noise Performance Test and Evaluation of a Wind Turbing Generator (풍력발전기 소음 성능 실증)

  • Kim, Seock-Hyun;Kim, Tae-Hyung;Park, Moo-Yeol;Chui, C.C.
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.241-245
    • /
    • 2005
  • This study introduces the wind turbine (W/T) noise evaluation procedure required in the international standard (IEC 61400-11) and monitoring system for the evaluation. Noise emission characteristics of a 750kW W/T generator is investigated. Test and evaluation are performed on J48 W/T model which is under operation in Daekwanryung Wind Test Site. With the noise signal, meteorological data and W/T operational data are monitored in real time by the integrated monitoring system using LabVIEW. From the measured noise data, acoustic power level and tonality of the W/T are estimated under the wind speeds required by the international standard.

  • PDF

A Study on the Improvement of ILS Test & Evaluation for Ground Weapon Systems (지상무기체계 ILS 시험평가 개선방안)

  • 최시영;최석철
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.1
    • /
    • pp.168-188
    • /
    • 2004
  • Integrated Logistic Support (ILS) is a management and technical process whereby all the diverse elements needed to fully operate, maintain, and totally support a materiel system in the field are identified, developed, and deployed simultaneously and on an equal priority with the item of materiel being supported. The test and evaluation (T&E)of ILS act the important role of reduction of life-cycle cost and keeping of good performance for weapon system. In this article, we suggest the alternatives for improvement in the test and evaluation of ILS during weapon system acquisition. It is hoped that this research is valuable and beneficial to persons related weapon system acquisition, in order to maximize the efficiency of defense acquisition management by reducing the life-cycle cost and enhancing the quality of weapon system.

A Study on the Development of the Automatic Performance­Test­machine for Power Steering Pump (파워스티어링 펌프의 자동 성능 시험기 개발에 관한 연구)

  • 정재연;정석훈
    • Tribology and Lubricants
    • /
    • v.19 no.6
    • /
    • pp.335-341
    • /
    • 2003
  • Recently, the automotive industry is being developed rapidly. On this, a demand of high quality performance­test­machine is increased too. But it is progressive technology that must be combined hydraulic, mechanic and electronic technologies. To construct this system, the design of oil hydraulic circuit, interface skill between sensor and personal computer, data acquisition & display system and integrated control are very important skill. Moreover, reliable data is obtained with vacuum system and complex heat exchange system. Therefore, in this study, we designed a performance­test­machine by using above key technologies and we also made a integrated PC control system using personal computer which is more progressive and flexible method than PLC control.

Noise Test and Evaluation of a 750 kW Wind Turbine Generator (750 kW 풍력발전기의 소음 실증)

  • Kim, Seock-Hyun;Kim, Tae-Hyung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.16 no.2 s.107
    • /
    • pp.124-131
    • /
    • 2006
  • This study introduces an environmental noise evaluation procedure for wind turbines(W/T) and the evaluation result of a 750 kW wind turbine(W/T) system. Test and evaluation are performed according to the international standard IEC 61400-11 on J48 W/T which is under operation in Daekwanryung W/T test site. With the meteorological data and W/T operational data, noise data are monitored and analysed. An integrated monitoring system is constructed in the test site and is utilized for the evaluation. From the measured noise data, acoustic power level, directivity and tonality of the W/T are estimated under the wind speeds required fly the International standard. The purpose of the study is to establish an W/T noise evaluating system satisfying the international standard and to obtain noise data for home made 750 kW W/T.

Integrated Injection Logic- Design Considerations and Experimental Results (Intergrated Injection Logic - 설계에 대한 고찰과 실험결과)

  • 서광석;김충기
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.16 no.2
    • /
    • pp.7-14
    • /
    • 1979
  • Design considerations of I2L are discussed with particular emphasis on the upward current gain of the npn transistor, 6J Several test structures have been fabricated to measure the DC and AC characteristics of the I2L basic cell and the base current components of the npn transistor. A T flip-flop has also been designed and fabricated using the I2L technology. The upward current gain of 10 the speed -power product of the 2.6pJ/gate and the minimum propagation delay time of 36 nsec have been obtained from the test structure. The maxmum toggle frequency of the T flip -flop has been measured to be 3.5 MHz.

  • PDF

Analysis about Threshold Measurement Test Result of LEO Satellite Receiver (저궤도 위성 Receiver의 Threshold측정 시험 결과에 대한 분석)

  • Jo, Seung-Won;Gwon, Jae-Uk;Choe, Jong-Yeon;Choe, Seok-Won
    • Aerospace Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.77-84
    • /
    • 2006
  • We should measure receiver tracking threshold and command threshold of the satellite in Integrate System Test (IST) in order to check the normal received power range of LEO(Low Earth Orbit) satellite S-band receiver. In this paper, the algorithm of threshold measurement is examined and the result measured in Integrated System Test is displayed. And than, the factor could have an effect on the result of threshold measurement except the capability of receiver itself was analyzed and compensated as many as distorted value according to that analysis.

  • PDF