• Title/Summary/Keyword: Integrated test

Search Result 2,112, Processing Time 0.03 seconds

Design and Verification of Mission Equipment Package System for Korean Utility Helicopter (한국형 기동헬기 임무탑재장비체계 설계 및 입증)

  • Kim, Sung-Woo;Lee, Byoung-Hwa;Yu, Yeon-Woon;Lee, Jong-Hoon;Yim, Jong-Bong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.388-396
    • /
    • 2011
  • Mission Equipment Package(MEP) system is a collection of avionic components that are integrated to perform the mission of the Korean Utility Helicopter(KUH). MEP system development is classified mission-critical embedded system but KUH MEP system developed including flight-critical data implementation. It is important to establish the good development and verification process for the successful system development. This paper describe the development and verification process in each phase for the KUH MEP system. MEP system design is verified through the qualification test, system failure test and compatibility test in System Integration Laboratory(SIL).

Propulsion System(Motor-Block) for High-Speed Train using IGCT Device (IGCT 소자를 사용한 고속전철용 추진제어장치(MOTOR-BLOCK))

  • Cho Hyun-Wook;Kim Tae-Yun;Kno Ae-Sook;Jang Kyung-Hyun;Lee Sang-Jun;Choi Jong-Mook
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.665-670
    • /
    • 2005
  • This paper introduces the propulsion system(Motor Block) stabilization test result for Korean High Speed Railway(HSR). The developed propulsion system using high power semiconductor, IGCT(Integrated Gate Commutated Thyristor) consists of two PWM converter and VVVF inverter. In this paper, overall configuration of propulsion system is briefly described and stabilization tests are made to verify the developed propulsion system. The presented test results shows beatless control method of inverter output current at the 200km/h and performance test of BCH.

  • PDF

A Study on Improvement Scheme for Korea's Motor Vehicle Safety Standards Implementation Rules System (자동차 안전기준 시행세칙 체계 정비방안 연구)

  • Kim, Gyuhyun
    • Journal of Auto-vehicle Safety Association
    • /
    • v.14 no.3
    • /
    • pp.77-82
    • /
    • 2022
  • The Korea's automobile safety standards consist of standards for automobiles, automated vehicles, two-wheeled vehicles and auto parts, and there are 157 articles. In connection with the safety standards, the implementation rules stipulated for detailed test methods and procedures are composed of the main body, asterisks and annexes, and have a rather complicated structure. In addition, the test items in the asterisk are specified with the same or similar name as the test items in other asterisks. In this study, the structure of these implementation rules is simplified and the same test items are integrated. This is expected to increase the user's understanding of laws and regulations and efficiency.

Development of a Transmission/Distribution Integrated Analysis Hybrid Algorithm for System Operation Platform Including Distributed Generation (분산전원을 포함하는 시스템 운용 플랫폼을 위한 송배전 통합 해석 하이브리드 알고리즘 개발)

  • Song, Chong-Suk;Suh, Jae-Wan;Jang, Moon-Jong;Jang, Gil-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.27 no.1
    • /
    • pp.35-45
    • /
    • 2013
  • Owing to the increase in the penetration of distributed generation the DGs connected to the distribution system have an effect on the system conditions of the transmission system and neighboring distribution systems. This makes the separate analysis of the transmission and distribution system no longer valid and requires the consideration of both the system in the analysis process. This paper proposes a transmission/distribution integrated analysis hybrid algorithm that would ensure the accurate analysis of the system by reflecting the results of the transmission and distribution system analysis on each other. Different scenarios are being analysed in order to verify the effectiveness of the hybrid algorithm by observing the effects of the DG connected distribution system on the transmission system and neighboring distribution systems. The algorithm and simulations performed are being conducted by MATLAB and the IEEE 30 bus system and a test distribution system has been utilized for the transmission and distribution systems respectively.

A Study on the Application of MOEs, MOPs, TPMs for the Integrated Logistics Support (종합군수지원에서의 MOEs, MOPs, TPMs 적용방안에 대한 연구)

  • Seo, Yang Woo;Oh, Young Il;Park, Eun Shim;Lim, Seong Jun;Lee, Seung Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.47-56
    • /
    • 2019
  • Although the weapon systems are becoming more diverse and complex, they are progressing in a short development period and a longer test and evaluation period. The more difficult the given environment is, the more efforts and performance of quantitative target values can be made by development agencies to carry out stable projects. However, these target values of the Integrated Logistics Support are not specified in the requirements and being set during the system development phase. In this paper, application of MOEs, MOPs and TPMs for ILS are presented and provided the basis for carrying out systematic Verification & Validation activities. As a result that MOEs of the ILS were chosen as Availability and MOPs as Mission Reliability, Logistics Reliability, Maintainability and Supportability and TPMs as MTBF, MTBCF, MTTR and so on. In particular, it is appropriate tailoring and apply the TPMs considering the cost, schedule, scope of work and characteristics of the project.

Effects of the Team Trust Element of Rugby Players on Self-Determination Motive and Team Performance

  • Lee, Jin-Wook;Park, Sung-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.8
    • /
    • pp.107-114
    • /
    • 2018
  • This study was conducted for the purpose of examining the effects of team trust element of rugby players on self-determination motive and team performance. As for the study subjects, rugby players participated in the 97th national athletic meet in 2016 were selected. As for data collection, in the total of 221 copies of samples were collected through convenience sampling method and 182 copies were used for the final analysis. Using SPSS 18.0, the collected data were analyzed through frequency analysis, exploratory factor analysis, Cronbach's ${\alpha}$ test, correlation analysis and multiple regression analysis and the following conclusions have been obtained. First, as for the effects of rugby players' team trust element on self-determination motive, it was found that team trust influenced external moderation, internal moderation, integrated moderation and identification moderation, and teammate trust influenced internal moderation, integrated moderation and identification moderation. Second, as for the effects of rugby players' team trust element on team performance, it was found that team trust and teammate trust influenced team performance. Third, as for the effects of rugby players' self-determination motive on team performance, it was found that integrated moderation and internal moderation influenced team performance.

A Design and Implementation of Service Modules in Middleware Server for Integrated Information Services on Shipboard (선박 내 통합 정보 서비스를 위한 미들웨어 서버의 서비스 모듈 설계 및 구현)

  • Hwang, Hun-Gyu;Kim, Tae-Jong;Yoon, Jin-Sik;Seo, Jung-Min;Park, Hyu-Chan;Jang, Kil-Woong;Lee, Jang-Se
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.34 no.1
    • /
    • pp.141-146
    • /
    • 2010
  • In this paper, we design and implement middleware service modules of MiTS system architecture which is proposed for integrated shipboard information management. The MiTS system is divided to three layers that are gateway, middleware server and application. The gateway collects and parses information and data, the middleware server integrates the data and stores to a database, and the application displays visual data to users. The service modules provide MiTS middleware services to gateways and applications. We implement the service modules based on international standard IEC61162-4 series and test those.

ENERGY SPECTRUM OF NONTHERMAL ELECTRONS ACCELERATED AT A PLANE SHOCK

  • Kang, Hye-Sung
    • Journal of The Korean Astronomical Society
    • /
    • v.44 no.2
    • /
    • pp.49-58
    • /
    • 2011
  • We calculate the energy spectra of cosmic ray (CR) protons and electrons at a plane shock with quasi-parallel magnetic fields, using time-dependent, diffusive shock acceleration (DSA) simulations, including energy losses via synchrotron emission and Inverse Compton (IC) scattering. A thermal leakage injection model and a Bohm type diffusion coefficient are adopted. The electron spectrum at the shock becomes steady after the DSA energy gains balance the synchrotron/IC losses, and it cuts off at the equilibrium momentum $p_{eq}$. In the postshock region the cutoff momentum of the electron spectrum decreases with the distance from the shock due to the energy losses and the thickness of the spatial distribution of electrons scales as $p^{-1}$. Thus the slope of the downstream integrated spectrum steepens by one power of p for $p_{br}$ < p < $p_{eq}$, where the break momentum decreases with the shock age as $p_{br}\;{\infty}\;t^{-1}$. In a CR modified shock, both the proton and electron spectrum exhibit a concave curvature and deviate from the canonical test-particle power-law, and the upstream integrated electron spectrum could dominate over the downstream integrated spectrum near the cutoff momentum. Thus the spectral shape near the cutoff of X-ray synchrotron emission could reveal a signature of nonlinear DSA.

Case Study on Integrated In-line Oil Monitoring Sensor for Machine Condition Monitoring of Steel Making Industry (통합형 인-라인 오일 모니터링 센서의 제철설비 현장 적용사례)

  • Kong, H.;Han, H.G.;Kwak, J.S.;Chang, W.S.;Im, G.G.
    • Tribology and Lubricants
    • /
    • v.26 no.1
    • /
    • pp.73-77
    • /
    • 2010
  • One of the important trends for condition monitoring in the 21st century is the development of smart sensors that will permit the cost-effective continuous monitoring of key machine equipments. In this study, an integrated in-line oil monitoring sensor assigned for continuous in situ monitoring multiple parameters of oil performance is presented. The sensor estimates oil deterioration based on the information about chemical degradation, total contamination, water content of oil and oil temperature. The oil oxidation is estimated by "chromatic ratio", total contamination is measured by the changes in optical density of oil in three optical wave-bands ('Red', 'Green' and 'Blue') and water content is evaluated as relative saturation of oil by water. In order to evaluate the sensor's effectiveness, the sensor was applied to several used oil samples in steel making industry and the results were compared with those measured by standard test methods.

Development of Integrated Start-up and Excitation System for Gas Turbine Synchronous Generator (가스터빈 동기기 통합형 기동 및 여자시스템 개발)

  • Ryu, Hoseon;Cha, Hanju
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.3
    • /
    • pp.183-188
    • /
    • 2014
  • Power conversion systems used in large gas turbine power plant can be divided into two main part. Because of the initial start-up characteristic of the gas turbine combustor, the gas turbine must be accelerated by starting device(LCI : Load Commutated Inverter) up to 10%~20% of rated speed to ignite it. In addition, the ECS(Excitation Control system) is used to control the rotor field current and reactive power in grid-connected synchronous generator. These two large power conversion systems are located in the same space(container) because of coordination control. Recently, many manufactures develop high speed controller based on function block available in the LCI and ECS with the newest power semiconductor. We also developed high speed controller based on function block to be using these two system and it meets the international standard IEC61131 as using real-time OS(VxWorks) and ISaGRAF. In order to install easily these systems at power plant, main controller, special module and IO module are used with high speed communication line other than electric wire line. Before initial product is installed on the site, prototype is produced and tests are conducted for it. The performance results of Integrated controller and application program(SFC, ECS) were described in this paper. The test results will be considered as the important resources for the application in future.