Park, Jungsu;Choi, June-Seok;Kim, Keugtae;Yoon, Younghan;Park, Jae-Hyeoung
Journal of Korean Society of Water and Wastewater
/
v.34
no.1
/
pp.9-21
/
2020
The proper operation and safety management of water and wastewater treatment systems are essential for providing stable water service to the public. However, various natural disasters including floods, large storms, volcano eruptions and earthquakes threaten public water services by causing serious damage to water and wastewater treatment plants and pipeline systems. Korea is known as a country that is relatively safe from earthquakes, but the recent increase in the frequency of earthquakes has increased the need for a proper earthquake management system. Interest in research and the establishment of legal regulations has increased, especially since the large earthquake in Gyeongju in 2016. Currently, earthquakes in Korea are managed by legal regulations and guidelines integrated with other disasters such as floods and large storms. The legal system has long been controlled and relatively well managed, but technical research has made limited progress since it was considered in the past that Korea is safe from earthquake damage. Various technologies, including seismic design and earthquake forecasting, are required to minimize possible damages from earthquakes, so proper research is essential. This paper reviews the current state of technology development and legal management systems to prevent damages and restore water and wastewater treatment systems after earthquakes in Korea and other countries. High technologies such as unmanned aerial vehicles, wireless networks and real-time monitoring systems are already being applied to water and wastewater treatment processes, and to further establish the optimal system for earthquake response in water and wastewater treatment facilities, continuous research in connection with the Fourth Industrial Revolution, including information and communications technologies, is essential.
Most urban water management systems are becoming vulnerable to flooding and drought due to the climate change (CC), urbanization and energy shortage. Despite of poor water management circumstances caused by extremely uneven annual rainfall and hilly terrain, traditionally we have made a sound and sustainable life based on our own philosophy and technologies which copes with our rigid environment. In this study a new paradigm of rainwater management is suggested and multipurpose and creative rainwater harvesting and management (RWHM) systems are introduced providing several case studies such as rainfall storage drainage (RSD) system, rainwater infiltration facilities and star city RWHM system. This new RWHM paradigm leads Seoul Metropolitan Government (SMG) in the Republic of Korea to change regulations and politics for the integrated RWHM. Finally, RWHM is expected to improve the safety, efficiency, energy consumption of urban water infrastructure, to reduce urban heat island phenomenon and, furthermore, to contribute in finding solutions for worldwide water issues and to adapt CC.
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.535-539
/
2006
GIS-based integrated management system was developed for the treated wastewater to be reused as agricultural water. The major scopes of this research includes developing different types of system such as connecting data of wastewater treatment plants to data of hydraulic structures and paddy field ; separating spatial data into the watershed boundary and the agricultural water boundary ; and estimating applicable site for reuse. This system can enable to provide more scientific support to manage information of effluent and agricultural data utilizing GIS techniques.
Oship stream is located nearby south eastern coasts. This study was performed to find out waters quality modeling and then to predict water quality of Oship stream. Based on survey data, BOD, T-N, T-P calibration and verification result were in good agreement with measured value within mean coefficient variance(MSE) value, which were 13.9%, 9.0%, 26.5% and 19.5%, 12.0%, 16.5%, respectively. Sectional water quality predictions of the main stream of Oship stream are executed on the basis of the following cases 1) with sewage treatment of Dogye-eup 2) reduction of mine wastewater treatment of 80% in th basin. As a result, BOD, T-P improvement rates at down stream of Oship stream, case 1) were appeared 12.2%, 22.2%, case 2) maximum sulfate ion and conductivity reduction removal rate of Oship stream were 58%, 68%. The main pollution sources of Oship-stream were almost domestic wastewater and mine wastewater discharged from Dogye-eup which located in uppers stream. The large effects will appear after the construction of Dogye sewage water treatment plant which remove the organic matter and nutrients in these sewage water. The waste water from mine can not easily to treat for characteristics of effluence and economic problems. However, to achieve the goal of water quality in Oship-stream water system, treatments of those are necessary.
Koottatep, Thammarat;Polprasert, Chongrak;Laugesen, Carsten H.
Journal of Wetlands Research
/
v.9
no.1
/
pp.69-78
/
2007
Constructed wetlands and other aquatic systems have been successfully used for waste and wastewater treatment in either temperate or tropical regions. To treat waste or wastewater in a sustainable manner, the integrated eco-engineering designs are explained in this paper with 2 case studies: (i) a combination of vertical-flow constructed wetland (CW) with plant irrigation systemfor fecal sludge management and (ii) integrated CW units with landscaping at full-scale application for domestic wastewater treatment. The pilot-scale study of fecal sludge management employed 3 vertical-flow CW units, each with a dimension of $5{\times}5{\times}0.65m$ (width ${\times}$ length ${\times}$ media depth) and planted with cattails (Typha augustifolia). At the solid loading rate of 250 kg total solids (TS)/$m^2.yr$ and a 6-day percolate impoundment, the CW system could achieve chemical oxygen demand (COD), TS and total Kjeldahl nitrogen (TKN) removal efficiencies in the range of 80 - 96%. The accumulated sludge layers of about 80 - 90 cm was found at the CW bed surface after operating the CW units for 7 years, but no clogging problem has been observed. The CW percolate was applied to 16 irrigation Sunflower plant (Helianthus annuus) plots, each with a dimension of $4.5{\times}4.5m$ ($width{\times}length$). In the study, the CW percolate were fed to the treatment plots at the application rate of 7.5 mm/day but the percolate was mixed with tap water at different ratio of 20%, 80% and 100%. Based on a 1-year data of 3-crop plantation were experimented, the contents of Zn, Mn and Cu in soil of the experimental plots were found to increase with increasing in CW percolate ratios. The highest plant biomass yield and oil content of 1,000 kg/ha and 35%, respectively, were obtained from the plots fed with 20% or 50% of the CW percolate, whereas no accumulation of heavy metals in the plant tissues (i.e. leaves, stems and flowers) of the sunflower is found. In addition to the pilot-scale and field experiments, a case study of the integrated CW systems for wastewater treatment at Phi Phi Island (a Tsunami-hit area), Krabi province, Thailand is illustrated. The $5,200-m^2$ CW systems on Phi Phi Island are not only for treatment of $400m^3/day$ wastewater from hotels, households or other domestic activities, but also incorporating public consultation in the design processes, resulting in introducing the aesthetic landscaping as well as reusing of the treated effluent for irrigating green areas on the Island.
This study aimed to inventory the water pollutant discharge of wastewater from two facilities, one primary steel manufacturing facility and one petroleum refinery, both of which are located in Korea, and to identify ways to improve the wastewater treatment process through field investigation. Probability evaluation was used to inventory the substances in polluted water. The samples collected in this study included original wastewater, on processing wastewater, and treated water. The general description of wastewater occurrence, major sources, and treatment facilities were also investigated to obtain an integrated database of the pollutants created by different industrial categories. Based on our analysis of raw wastewater and final effluent, the detected pollutants were confirmed by analyzing their presence in the raw or supplemental materials, the potential of formation as byproducts, and the possibility of inclusion as impurities. The compounds detected for each category were screened via investigation of their possible sources and confirmed as the final water pollutant inventories. Thirty kinds of water pollutants were emitted by the primary steel manufacturing facility (reference in case A), including 14 specified hazardous water pollutants. The petroleum refinery (reference in case B) emitted 36 water pollutants, including 16 specified hazardous water pollutants.
Journal of The Korean Society of Agricultural Engineers
/
v.49
no.4
/
pp.13-22
/
2007
The uncertainty in water quality model predictions is inevitably high due to natural stochasticity, model uncertainty, and parameter uncertainty. An integrated modeling system under uncertainty was described and demonstrated for use in watershed management and receiving-water quality prediction. A watershed model (HSPF), a receiving water quality model (WASP), and a wetland model (NPS-WET) were incorporated into an integrated modeling system (modified-BASINS) and applied to the Hwaseong Reservoir watershed. Reservoir water quality was predicted using the calibrated integrated modeling system, and the deterministic integrated modeling output was useful for estimating mean water quality given future watershed conditions and assessing the spatial distribution of pollutant loads. A Monte Carlo simulation was used to investigate the effect of various uncertainties on output prediction. Without pollution control measures in the watershed, the concentrations of total nitrogen (T-N) and total phosphorous (T-P) in the Hwaseong Reservoir, considering uncertainty, would be less than about 4.8 and 0.26 mg 4.8 and 0.26 mg $L^{-1}$, respectively, with 95% confidence. The effects of two watershed management practices, a wastewater treatment plant (WWTP) and a constructed wetland (WETLAND), were evaluated. The combined scenario (WWTP + WETLAND) was the most effective at improving reservoir water quality, bringing concentrations of T-N and T-P in the Hwaseong Reservoir to less than 3.54 and 0.15 mg ${L^{-1}$, 26.7 and 42.9% improvements, respectively, with 95% confidence. Overall, the Monte Carlo simulation in the integrated modeling system was practical for estimating uncertainty and reliable in water quality prediction. The approach described here may allow decisions to be made based on probability and level of risk, and its application is recommended.
The 37 indicators for performance evaluation of public sewage management agencies are divided into four major categories (agency manpower management ability, wastewater treatment plant operation and management, sludge and water reuse, service quality) in the first stage, and the necessity and score acquisition for the detailed indicators by each major category in the second stages. Priority was investigated through the Analytic Hierarchy Process (AHP) analysis technique for ease and relevance of company efforts. Also, based on the results of this analysis, integrated type weighting and relative importance were analyzed. As a result of the analysis, the weight and relative importance of the first stage classification were in the order of wastewater treatment plant operation and maintenance, operation agency manpower management ability, sludge and water reuse, and service quality. As a result of analyzing the weights and priorities of the detailed performance indicators in the second stage, it was found that operator's career years, the percentage of certification holding rate in operators, compliance with the effluent water quality standards, training times for operators, and efforts to manage hazardous chemicals were important. Some of the indicators of operation agency performance evaluation may include indicators in which the performance of the company's efforts is underestimated or overestimated. In order to improve this, it is necessary to give weights in consideration of the necessity of the indicator, the relevance of the company's efforts, and the ease of obtaining scores.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2002.10a
/
pp.137-140
/
2002
The monitoring system for integrated management of on-site wastewater treatment plants(biofilter) was designed and its operation program was developed. In design process, the research on monitoring parameters which will be able to represent condition and operation of the pilot plants was accomplished, and these parameters came to reveal with ORP(Oxidation-Reduction Potential), water level, pump and power on/off. Proposed monitoring system is composed with measurement, control, communication and display device, and PCB(Prototype Circuit Boards) and microcontroller (PIC16F877) technique are applied to its design of control device for performing specific function. also, The operation program of PC setup is developed in order to provide a convenience to the manager.
Integrated watershed sewage works program(IWSWP) is defined as implementing, by one of local governments or central government, sewage facilities planning, installation and management for a certain watershed in which criteria of water quality is established and two or more local governments are involved. It is shown that IWSWP is more efficient for the improvement of water quality of water body than conventional local sewage works program(CLSWP) and besides, economical benefits can be achieved by integration of facilities and M&O. In this research, case study for 8 watershed area were investigated to evaluate the difference of effect between IWSWP and CLSWP. The research shows that IWSWP has the money saving result of approximately 12 % by cost reduction for sewage works investment. B/C analysis result shows that B/C ratio of IWSWP was 1.749 and it is higher than B/C ratio of 1.439 for CLSWP. At the same time, the B/C sensitivity analysis is carried out for the rate of discount and the recreational use benefit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.