• 제목/요약/키워드: Integrated management of water and wastewater

검색결과 41건 처리시간 0.026초

물관리일원화 시대를 맞이한 정부의 물관리 조직에 관한 논의 (A discussion on the water management organization of the Korean government in the era of one water management)

  • 구자용
    • 상하수도학회지
    • /
    • 제33권1호
    • /
    • pp.1-8
    • /
    • 2019
  • In this paper, the current water management organization of the Korean government and those of foreign countries were analyzed to draw out a plan to build a more rational water management organization. And then, the two organization reform alternatives were discussed on which alternatives can effectively manage the water. Through the analysis, deployment of three divisions including the water policy, the wastewater policy and the division of water industries and business are the best alternative in terms of water equality, sustainability and efficiency, which are the three main goals of the new Water Management Act, Water Management Basic Act. With much efforts, the Korea has come to the era of One Water Management. The water management paradigm proposed in this opinion is expected to become a new engine of economical growth of the nation.

통합 환경 관리를 위한 수질 환경의 질 목표 수준 설정 방법에 관한 연구 (A study on the method of setting the water quality target level for integrated environmental management)

  • 황현정;간종범;서지혜;이선경;김영란
    • 상하수도학회지
    • /
    • 제35권3호
    • /
    • pp.187-196
    • /
    • 2021
  • When evaluating the extent of the impact of water pollutants on the surrounding area, we would like to present the target level (proposal) of the quality of the environment, which is the standard for evaluation. We propose the environmental quality target level for substances that need to be applied domestically by investigating overseas cases operating the integrated environmental management system and the implications of domestic environmental pollutant management. The appropriateness of the environmental quality target level reviewed in this study was determined using data from the water quality measuring network, and future improvement measures were proposed. We review the available methodologies for setting quality objectives for the environment. It proposed the environmental quality target level for 21 substances that have domestic water pollutant emission standards and do not have environmental standards, and proposed future improvement measures. If it is necessary to add quality target-level items of the environment in the future, it is believed that expansion will be possible based on the methodology presented in this study.

댐상류하수도시설의 통합운영관리방안에 관한 연구(II) - 통합운영관리 조직구성, 인력절감효과 및 경제성 검토를 중심으로 - (Integrated Management of Sewage Facilities in Upstream Watershed of Dam(II) - Focusing on Organization, Human Resources Saving Effect and Economic Feasibility -)

  • 안충희;이관용
    • 상하수도학회지
    • /
    • 제25권1호
    • /
    • pp.51-61
    • /
    • 2011
  • A project constructing sewerage facilities in 9 upstream areas of 7 multi-purpose dams will have been completed by 2011. After all constructing and retrofitting of the new and the existing sewerage facilities, integrated management system with operation and control functions for the each levels of facilities will also be utilized. In this study, we studied how to compose the organization taking responsibility of the integrated management system and analysed human resources saving effect against conventional method of individual management of each sewerage facility. As a result, a method estimating the human resources in employing the integrated management among several sewerage facilities at upstream areas of dams were presented and some 23% of human resources could be saved by integrated management. Commissioning to a specialized public institute showed the highest B/C ratio of 4.5 among commissioning to local public corporations, commissioning to private corporations, and role-sharing partnership, etc.

댐상류 하수도시설의 통합운영관리방안에 관한 연구(I) - 통합관리전문기술지원단의 운영방안에 대하여 - (Integrated Management of Sewerage Facilities in Upstream Watersheds of Multi-purpose Dams - Focusing on Management of a Technical Support Team)

  • 박규홍;김형준;안충희;최주행
    • 상하수도학회지
    • /
    • 제25권1호
    • /
    • pp.23-29
    • /
    • 2011
  • Integrated management system (IMS) for sewerage facilities has been installed at 7 dams and 9 watersheds since 2006. However, there has been no decisive plan on how and who to manage efficiently IMS after finishing the construction. Therefore, in this study, it was suggested that a new organization, so to speak, a technical support team for integrated management that may operate and manage IMS efficiently, could need to be set up. Three scenarios were evaluated depending on the type of allocating human resources to new organization considering each levels of sewerage facilities. Economic analyses on each scenarios of human resources allocation were also carried out. As a result, establishing the technical support team for integrated management was estimated to give the net benefit from 1.3 billion to 20.6 billion won for 15 years.

골판지원지 제조업 최적가용기법 기준서의 이해와 개선사항 (Understanding and Improvement of the K-BREF (Korea BAT reference documents) for the Corrugated Cardboard Manufacturing Industry)

  • 서경애;김은석;김가희;간종범;홍석영;강필구
    • 한국환경과학회지
    • /
    • 제29권5호
    • /
    • pp.559-573
    • /
    • 2020
  • The purpose of this study analyzed the overview of corrugated cardboasrd manufacturing industry and then provide direction for improvement. The BREF (BAT reference document) is an important reference for licensees and officer, including the best available techniques for the industry and achievable environmental performance, technical characteristics, and economic information. In the corrugated cardboard manufacturing process, wastewater pollutants are generated throughout the production process, and water is used in the dissociation and aging process. Atmospheric emissions are mostly generated by steam production from boilers and incinerators for the dry process. SO2, NOx, CO2, CO, HCl, dust, VOC, and odor were common. In the EU-BREF (European union BAT reference documents) BAT for wastewater have taken up a relatively large proportion. Items of water pollutants in wastewater were common in COD, BOD, N, P, SS, and however EU-BREF had different pollutants such as AOX and salt compared to K-BREF. In order to improve the quality of the K-BREF, it is necessary to devise basic data research method and data acqusitiom method. Consideration should be given to additional environmental management techniques that reflect the emissions characteristics of the corrugated cardboard manufacturing process. In addition, further research is needed to develop methodologies for selecting BATs considering environmental and economic feasibility.

상하수도시설에 대한 전과정관리(LCM)시스템 구축방안 연구 (Establishment of Life Cycle Management(LCM) System for Water Supply and Sewerage Systems)

  • 박지형;황용우;김영운;박광호
    • 상하수도학회지
    • /
    • 제26권2호
    • /
    • pp.303-312
    • /
    • 2012
  • Water supply and sewerage systems are the large-scale urban infrastructure ejecting large amount of environmental load over the life-cycle. Therefore, it is important not only to optimize in the aspect of economical superiority and process efficiency but also to consider earth scale environmental impact. This study aimed to suggest the establishment of life cycle management(LCM) system as an integrated management solution in urban water supply and sewerage systems. As a result, the methodology for LCM system consisting of life cycle assessment(LCA), life cycle cost(LCC), life cycle $CO_{2}(LCCO_{2})$ and life cycle energy(LCE) was developed. Also, several case studies using the latest statistics data of water supply and sewerage systems were carried out to investigate the field applicability of LCM.

하수도시설 통합운영 성과분석을 통한 통합운영관리의 경제성 평가 (Economic Evaluation of Integrated Operation & Management through Operation Performance Analysis of Sewage Facilities)

  • 신정섭;정석현;조병옥;이관형;강선홍;김용대;윤준재
    • 상하수도학회지
    • /
    • 제31권1호
    • /
    • pp.63-72
    • /
    • 2017
  • For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result

매립지내 환경에너지단지의 무방류 시스템 구축방안 (Construction Method of Zero Discharge System for Environmental Energy Complex in Landfill)

  • 천승규
    • 상하수도학회지
    • /
    • 제27권5호
    • /
    • pp.581-590
    • /
    • 2013
  • A research was performed for zero discharge system of waste water which is produced from energy recovery process of waste and biomass. Leachate and all kinds of waste water should be separated and integrated into three categories in addition to converting existing leachate treatment facility into waste water treatment facility as well as introducing a management system of reverse osmosis membrane facility and bioreactor landfill. Following these conditions to better water treatment process, it was likely to produce over 3,000 tons of low-grade recycling water and 2,000 tons of high-grade recycling water per day when zero discharge system of waste water is applied starting from 2016. Economical efficiency was also surveyed in total treatment fee. Present system costs 18,129 million won per year, and suggested zero discharge system would cost 15,789 million won per year.

의사결정 알고리즘을 이용한 DAF 공정 제어에 관한 연구 (A study on dissolved air flotation (DAF) process control using decision algorithm)

  • 정우식;안주석;박지영;오현제
    • 상하수도학회지
    • /
    • 제31권5호
    • /
    • pp.409-414
    • /
    • 2017
  • In this study, we divided the process operation scenarios into three categories based on raw water temperature and turbidity. We will select and operate the process operation scenario according to the characteristics of the raw water. The number of algae in the DAF treated water has been analyzed to be less than 100 cells/mL. These results indicated that the DAF process is effective in removing the algae. In addition, the scenario of the integrated management decision algorithm of the DAF process was developed. DAF pilot plants ($500m^3/day$) process has shown a constantly sound performance for the treatment of raw water, yielding a significantly low level of turbidity (DAF treated water, 0.21~1.56 NTU).