• 제목/요약/키워드: Integrated Management Program

Search Result 493, Processing Time 0.027 seconds

Development and Evaluation of an Educational Program for the Clothing life Domain in Home Economics through a Theme-Based Integrated Approach (주제 중심 통합적 접근에 의한 가정 교과 의생활 영역 교육 프로그램 개발과 평가 - "의복관리"와 "섬유(재료)" 주제를 중심으로 -)

  • Kim, Nam-Eun;Lee, Hye-Ja
    • Journal of Korean Home Economics Education Association
    • /
    • v.22 no.3
    • /
    • pp.163-188
    • /
    • 2010
  • This study set out to develop and evaluate an educational program for the Clothing Life of Home Economics through the theme-based integrated approach develop integrated thinking abilities for solving everyday problems. For those purposes, it selected a couple of themes in the area of Clothing Life toward which the theme-based integrated approach could be develop and evaluate an educational program. The developed program was applied and assessed in total 28 hours of field lessons given to eighth graders attending B Middle School in Busan Metropolitan City. The analysis stage involved an exploration into programs related to an integrated approach to other subjects; the design stage identification of program types; and the development stage theme selection according to the selection criteria. The previous studies were analyzed along with the Technology and Home Economics textbooks to select a theme. two themes "Clothing Management" and "Fabrics(Materials)" were selected after discussing with the students on the Messenger and with a group of experts. Then content was organized and composed around the themes by discussing connections with other subjects. There were three evaluation; one by experts, another through preliminary lessons, and the other through field lessons. Following the research procedure, a theme-based integrated program was developed for the two selected themes. It contained total 49 and 32 learning materials for "Clothing Management" and "Fabrics(Materials)," respectively. Those learning materials were comprised of experiments and practices according to the nature of the themes. Each program consisted of the goals, learning content, content organization chart, learning activities, and evaluation; learning activities experiences, practice and experiment activities, self-directed activities and problem-solving processes; and evaluations self-evaluation, teacher evaluation, peer evaluation, portfolio, and experiment reports. The program was assessed three times. The first and second evaluation results found that the program was well compatible with the current needs, was properly organized to give lessons through integration with other subjects, and continuously maintained the students' interest. They, however, requested that there should be detailed explanations about each part of the program content. In the third evaluation done by the students during field lessons, 60% of them said that the program was fun and its content was easy to understand, that they realized a theme could be connected to several other subjects, and that the program could be applied to actual life. The educational program through the theme-based integrated approach is significant in that it is an educational program for the area of Clothing Life and tries an integrated approach. It helped the students not only gather knowledge in an integrated manner, but put it to practical uses to solve various problems they faced in actual life by creatively changing integrated knowledge. The study will be hopefully used by many teachers so that the students solve problems based on the ability of integrating various knowledges organically.

  • PDF

Development and Operation of Integrated Technical Information System(ITIS) for an Aircraft Development (항공기 통합기술정보시스템(ITIS) 개발 및 운용)

  • Chung, Joon-Young;Lee, Joon-Woo;Kim, Cheon-Young
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.2
    • /
    • pp.75-83
    • /
    • 2006
  • The Aircraft Development Department operated a Technical Document Management System that was effectively managed using a database management system for the management of the technical information created by a research and development phase of an aircraft and managed a technical information of a research and development varied by the project on a lot of the aircraft development program. While managing the user management and technical information project, it caused some problems on the workflow of the Work Memo and a search of some technical information, etc. As result, we developed the web-based Integrated Technical Information System(ITIS) which be able to totally manage the Technical Document Management System varied by program. According to the construction and operation of this system, we can access by program using user account and privilege and dramatically increased the productivity of a research and development because of performing the workflow of the Work Memo and some search of technical information by the integrated screen of the ITIS.

  • PDF

국가 지하수 정보 종합관리 체계의 구축과 활용(II) - 두레박 프로그램과 지하수세상 홈페이지 -

  • 손영철;김규범;최영진
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.270-274
    • /
    • 2000
  • We have developed the computer system with MOCT which is called "The Integrated National Groundwater Information system" since 1995 and now begin to supply the database and related informations for ground water by internet homepage. The integrated system is composed of four sub systems which are "Groundwater Information System", "DUREBAK", "Hydrogeologic Map Management System" and "Groundwater World Homepage". The local government offices use the "DUREBAK" program to manage the well development and maintenance. About 1,000,000 wells are managed in "DUREBAK" program and they submit the well database to MOCT every year. And now everyone can obtain the well data and other informations through internet homepage. We have set the standard process of data acquisition and management for ground water last four years.s of data acquisition and management for ground water last four years.

  • PDF

Introduction of Program Life-Cycle Management System for Space Launch System Development (우주 발사 시스템 개발을 위한 통합 기술관리 시스템 소개)

  • Joh, Miok;Shin, Myoung Ho
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.48-53
    • /
    • 2006
  • A web-based program life-cycle management(PLM) system is introduced to implement the system engineering processes and to provide the development traceability online. This information system aims for the realization of essential system engineering management techniques currently applied to the space launch system development program including management of configuration and data based on the work breakdown structure(WBS), WBS, bill of materials and mass properties. The system enhances communication and gives access to the development data with relevant information such as data-to-data relation and approval status/history through the web, and preserve all of the development data throughout the program life-cycle. Further improvement of the system is planned to implement the program management processes and co provide integrated information useful for the programmatic decision making.

  • PDF

Application case study of change Management program IFI (Integrated Field Innovation) methodology of field workers (현장 작업자 변화관리 프로그램 IFI 방법론의 적용 사례 연구)

  • Park, Young-Cheol;Ree, Sang-Bok
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2009.10a
    • /
    • pp.370-376
    • /
    • 2009
  • Study of IFI(Integrated Field Innovation) means change of management. This study sill introduces IFI which is a new methodology of change and innovation of workers, and will describe how workers participated in the activities voluntarily. The principle of IFI is that letting employees to find the problems of the sites -anything that makes employees considering as the problem while they are working-and solve those problems through any tools own their own. Workers do not have to waste their time on bounding by unnecessary tools and processes. There are some cases that company "D" has been actually applied the IFI methodology in 2008. By application of IFI methodology to "D" company, which is proved that methodology is good change management program for workers who work in the manufacturing field.

  • PDF

Premarital Preparation Education Program based on the Integrated Approach Family Relation and Family Resource Management:for Happy Marital Life (가족 및 관리의 통합적 접근에 기반한 결혼준비교육 프로그램: 행복한 부부생활을 위한 결혼준비교육 프로그램)

  • 고선주;이현아;이기영;최진아;유우영
    • Journal of the Korean Home Economics Association
    • /
    • v.41 no.6
    • /
    • pp.47-61
    • /
    • 2003
  • The purpose of this study is to develop and to evaluate the premarital preparation education program based on the integrated approach of family relation and resource management to attempt to reduce marital distress. Using a combination of previous premarital education program and survey result of educational need, it is consisted of 4 sessions (session 1: Meaning and expectation of the marriage, session 2: Couple Communication, session 3: Love and Sexuality, session 4: Family Life Planning) The result of the evaluation, the efficiency of this premarital preparation program was proved. In the 11 couples evaluation data, those who had taken premarital education program were more likely to satisfied program and more likely to invite the others to join this program. When asked what content areas were most helpful, the two top ranking went to the Couple Communication (41.9% rated as helpful), and Family Life Planning (35.5% rated as helpful).

Introduction of Program Life-Cycle Management System for Space Launch System Development (우주발사 시스템 개발을 위한 통합 기술관리 시스템 소개)

  • Jo, Mi-Ok;Jo, Cheol-Hun;Lee, Jun-Ho;O, Beom-Seok;Park, Jeong-Ju;Jo, Gwang-Rae
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.86-89
    • /
    • 2004
  • A web-based program life-cycle management(PLM) system is introduced to implement the system engineering processes and to provide the development teaceability online. This information system aims for the realization of essential system engineering management techniques currently applied to the space launch system development program including management of configuration and data based on the work breakdown structure(WBS), WBS, bill of materials and properties. The system enhances communication and gives access to the development data with relevant information such as data-to-data relation and approval status/history through the web, and preserve all of the development data throughout the program life-cycle. Further improvement of the system is planned to implement the program managrment pricesses and to provide integrated information useful for the programmatic decision making.

  • PDF

A Study on the Integrated System of the Hotel Employment Management and the Determinants of the Employment (호텔종사원의 통합적 채용관리 시스템과 채용결정요인에 대한 연구 - 채용 전문가와 지원자 간의 차이분석 -)

  • Kim, U-Jin
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.17 no.2
    • /
    • pp.61-94
    • /
    • 2006
  • This study analyzes the integrated system of the hotel employment management and the differences between the persons of employment concerning and the applicants about the importance of the determinants of the employment around the five-star hotels in Seoul. Firstly, the integrated strategies are presented by 3 stages such as recruiting, selection and placement. And then the 15 determinants of the employment are derived to analyze the perceptional differences between the persons of employment concerning and the applicants about the important determinants and to present the reasons and strategical implications. The results of this study indicates that the strategy to make him/her aware of sufficient information about the hotel and job through the proper balancing demand and supply and the industry-university cooperation program order to maintain and utilize the human resource to be aligned with the business performance of the hotel.

  • PDF

Implementation of The Integrated Management System using iA-Canvas (iA-Canvas를 이용한 통합 관리 시스템 구현)

  • Kim, Seog Chan;Kim, Ki Tae;Kim, Je Min;Yoo, Weon Hee
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.1
    • /
    • pp.169-179
    • /
    • 2010
  • iA-Canvas is HMI program which is the industrial automation application developed based on the Java language, and can run on any OS such as Windows, UNIX, Linux. The iA-Canvas is built on object-oriented open structure and consider network functionality and user experience as a system of centralized management and distributed management. iA-Canvas is composed of several components such as Builder, IO Server, Viewer, and Web Service Module and provides a GUI control environment. This paper explains design and implementation of iA-Canvas that is a tool for development of integrated management system, and shows practical examples of integrated management system that use iA-Canvas.

Spatial Data Update Method for Efficient Operation of the Integrated Underground Geospatial Map Management System (지하공간통합지도 관리 시스템의 효율적인 운영을 위한 공간 데이터 갱신 방법)

  • Lee, Bong-Jun;Kouh, Hoon-Joon
    • Journal of Industrial Convergence
    • /
    • v.20 no.7
    • /
    • pp.57-64
    • /
    • 2022
  • There are various structures in the underground space, and the structures is managed as 3D data in Integrated Underground Geospatial Map Management System(IUGMMS). The worker transmits and updates the integrated map including the changed underground geospatial data to IUGMMS with the completed book submission program. However, there is a problem in that the transmission time and the update time is delayed because the size of the integrated map file is large. In this paper, we try to extract and transmit only the changed integrated map by obtaining and comparing each spatial characteristic information of the integrated map. As a result of the experiment, the transmission time of the suggestion method is short and the update time is also short than the transitional method because the suggestion method transmits only the integrated map including the changed underground geospatial data. As a result, it was possible to reduce the delay time in transmitting and updating the changed integrated map.