• Title/Summary/Keyword: Integrated Delivery Method

Search Result 68, Processing Time 0.026 seconds

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD (IPD 도입을 위한 국내 건설기술자의 인식 분석)

  • Song, Sul-Min;Kim, Yea-Sang;Chin, Sang-Yoon;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.72-80
    • /
    • 2011
  • Recently, significance of efficiency in construction projects have been increased. So effective new delivery systems are required to improve project quality and value. Those systems could also reduce period, cost, risk and waste of the construction. Also, as current government aims 'Low carbon and Green growth', it is important to manage integrated supervision from the pre-design stage to the operation stage. In USA, AIA suggested IPD which encourages mutual cooperation among stakehklder to improve the productivity. Therefore, this study analyzes the characteristics of the IPD and deduct Present condition and Perception of Domestic Construction Environment to Introduce IPD.

A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing (주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구)

  • 김인준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

BIM based Construction Progress Monitoring System Integrated with IOT (사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템)

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

Study on location selection of integrated depot of warehouse stores utilizing AHP method (AHP법을 활용한 창고형 매장의 통합 Depot 위치선정에 관한 연구)

  • Park, Byoung-Jun;Nam, Tae-Hyun;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.17 no.2
    • /
    • pp.135-144
    • /
    • 2019
  • The importance of logistics of warehouse stores has increased as their prices are cheaper and more convenient than those of large supermarkets. However, few studies on integrated depot location selection of warehouse stores have been conducted. In this regard, this study aims to derive factors for integrated depot location selection and calculate weights and select the location priority of target candidates by introducing an analytic hierarchy process (AHP). The analysis results exhibited that the most important selection factor was the cost reduction in transportation and delivery (0.198) followed by distance reduction in transportation and delivery (0.168), and time reduction in transportation. This study quantified the reduction in cost and increase in efficiency if depots were integrated and operated thereby presenting more realistic foundational data to hands-on workers. For the future study, the analysis model will be needed to be advanced through additional investigation on the factors in the analysis.

Estimation of Transferred Power from a Noise Source to an IC with Forwarded Power Characteristics

  • Pu, Bo;Kim, Taeho;Kim, SungJun;Kim, Jong-Hyeon;Kim, SoYoung;Nah, Wansoo
    • Journal of electromagnetic engineering and science
    • /
    • v.13 no.4
    • /
    • pp.233-239
    • /
    • 2013
  • This paper proposes an accurate approach for predicting transferred power from a noise source to integrated circuits based on the characteristics of the power transfer network. A power delivery trace on a package and a printed circuit board are designed to transmit power from an external source to integrated circuits. The power is demonstrated between an injection terminal on the edge of the printed circuit board and integrated circuits, and the power transfer function of the power distribution network is derived. A two-tier calibration is applied to the test, and scattering parameters of the network are measured for the calculation of the power transfer function. After testing to obtain the indispensable parameters, the real received and tolerable power of the integrated circuits can be easily achieved. Our proposed estimation method is an enhancement of the existing the International Electrotechnical Commission standard for precise prediction of the electromagnetic immunity of integrated circuits.

A Fuzzy Vehicle Scheduling Problem

  • Han, Sang-Su;Lee, Kyo-Won;Hiroaki Ishii
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 1998.06a
    • /
    • pp.666-668
    • /
    • 1998
  • In this paper, we consider a bi-objective vehicle routing problem to minimize total distance traveled and maximize minimum integrated satisfaction level of selecting desirable routes in an fuzzy graph. The fuzzy graph reflects a real delivery situation in which there are a depot, some demand points, paths linking them, and distance and integrated satisfaction level are associated with each route. For solving the vi-objective problem we introduce a concept of routing vector and define non-dominated solution for comparing vectors. An efficient algorithm involving a selection method of non-dominated solutions based on DEA is proposed for the vehicle routing problem with rigid distance and integrated satisfaction level.

  • PDF

A Study on the Characteristics of the Delivery System in Welfare to Work : the Case of the Employment Partnerships in United Kingdom (근로연계복지정책의 전달체계 성격에 관한 연구 - 영국 뉴딜정책(New Deal)의 파트너십전략을 중심으로 -)

  • Lim, Su Kyoung;Kwon, Hyeok Chang
    • Korean Journal of Social Welfare Studies
    • /
    • v.42 no.2
    • /
    • pp.71-96
    • /
    • 2011
  • This study explores the characteristics of the delivery system of the New Deal, with a particular attention to the partnerships and welfare governance. The study analyzes the partnerships of the New Deal policy in Britain, which consist of two dimensions of partnerships. The results are: First, the method of the transformation of delivery in central government dimension is the unity of the governmental organizations, Another outcome of reform in the central government dimension is the establishment of the Jobcentre Plus. Second, the characteristic of delivery system in public-private dimension is the contract through competition, which means the introduction of market paradigm. Especially, the reform of the delivery system in the local dimension is to deliver integrated services through the introduction of labour market paradigm in demand-side. The central government also supports the reform in the local level. This study also explores the forms of welfare governance in these dimensions, This study suggests the importance of united services in the Korean welfare to work.

Performance Evaluation of the Internet Phone based on Resource Reservation Protocol (자원 예약 프로토콜에 기반한 인터넷 폰의 성능분석)

  • 조재만
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.03a
    • /
    • pp.27-31
    • /
    • 1998
  • The growing usage of multimedia communication applications with specific bandwidth and real-time delivery requirements has created the needs for quality of service(QoS). In response to the growing demand for an integrated services, the Reservation Protocol(RSVP) has been designed to exchange resource reservation among routers in the internet. RSVP protocol provides the quality of service for real-time applications but the network efficiency is reduced because of the limited bandwidth. In order to use network resources efficiently. We compare the resource efficiency of traditional reservation methods with that of the proposed method and evaluate the performance of the internet phone.

  • PDF