• Title/Summary/Keyword: Integrated Construction

검색결과 1,683건 처리시간 0.035초

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가 (Development and Evaluation of Business Productivity of Construction Integrated Management System based on ERP System)

  • 백명종
    • 한국전자거래학회지
    • /
    • 제6권3호
    • /
    • pp.163-180
    • /
    • 2001
  • New information technology contributes to raising of business productivity in many construction companies. The application of construction integrated management system is expected to save the time of decision-making in business management and shorten the closing account schedule. Construction Integrated Management System based on ERP(Enterprise Resource Planning) system allows to control core business procedure by monitoring technique on real-time. In this paper, we achieves 10% raise up business productivity in site business area, and 30% raise up business productivity in head of nce business area by means of DW-CIMS (Daewoo Construction Integrated Management System)

  • PDF

ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가 (Development and Business Productivity of Construction Integrated Management System based on ERP System)

  • 한희석;백명종;배은화
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2001년도 International Conference CALS/EC KOREA
    • /
    • pp.127-140
    • /
    • 2001
  • New Information Technology Contributes to raising of Business Productivity in many Construction Companies. The Application of Construction Integrated Management System is Expected to Save the time of decision-making in Business Management and shorten the Closing Account Schedule. Construction Integrated Management System Based on ERP(Enterprise Resource Planning) System allows to Control core Business Procedure by Monitoring Technique on Real-time. In This Paper, We achieves 10% Raise up Business Productivity in Site Business Area, and 30% Raise up Business Productivity in Head Office Business Area by means of DW-CIMS (DAEWOO Construction Integrated Management System)

  • PDF

건설 통합DB 구축을 위한 시공현장등록번호 체계 개발 (Development of Unique Registration Number System for Construction Site Integrated DB)

  • 허윤경;이승우;유위성;김성환;성유경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.367-368
    • /
    • 2023
  • Kiscon, Seumteo, KONEPS and CSI are representative construction-related DBs. All four DBs are operated by the public. However, the characteristics of data are different depending on the purpose. Therefore, it is difficult to utilize integrated data and it is only used sparingly. Creating and sharing a unique key that can identify a construction site will enable integrated accumulation and management of construction-related data for various purposes. At this point, it is most efficient to assign a unique key based on KISCON. KISCOn data conforms to the construction site definition and covers most of the public, private, architectural and civil works. In addition, there is an advantage in that DB construction is performed in the construction situation, which is a relatively preceding process. In the future, it is necessary to create a practical construction site integrated DB through the production of an integrated key table containing linkage information of unique keys for site management, performance indicators, and statistics production.

  • PDF

DEVELOPMENT OF COLLECTIVE MANAGEMENT SYSTEM FOR INTEGRATED OPERATION OF U-SPACE

  • Sang-Hun Paek;Jeong-Nam Lee;Jae-Hee Cho;In-Shick Song;Sang-Chae Lim;Kyoon-Tai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1377-1382
    • /
    • 2009
  • U-City related researches and development have been actively conducted in Korea since 2002. According to the Act on Ubiquitous City Construction, "U-City" is defined as "the city to provide ubiquitous service anytime anywhere through the existing ubiquitous backbone systems and ubiquitous technologies, ultimately for the purpose of improving urban competitiveness and quality of life. This research explains the plan to develop collective management technology for integrated operation of U-Space which makes up U-City. Specifically, this report is intended to suggest basic approach of identifying collective management elements of each U-Space type, developing integrated management system and creating interface module to link the system with urban integrated operation center.

  • PDF

QUANTITATIVE ANALYSES USING 4D MODELS - AN EXPLORATIVE STUDY

  • Rogier Jongeling;Jonghoon Kim;Claudio Mourgues;Martin Fischer;Thomas Olofsson
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.830-835
    • /
    • 2005
  • 4D models help construction planners to develop and evaluate construction plans. However, current analyses using 4D models are mainly visual and limit the quantitative comparison of construction alternatives. This paper explores the usefulness of extracting quantitative information from 4D models to support time-space analyses. We use two 4D models of an industry test case to illustrate how to analyze 4D content quantitatively (i.e., work space areas and distances between concurrent activities). This paper shows how these two types of 4D content can be extracted from 4D models to support 4D-based-analysis and novel presentation of construction planning information. We suggest further research to formalize the content of 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content will enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the information content for informative presentations of construction planning information.

  • PDF

통합건설정보분류체계의 구축방안에 관한 연구 (A Study on the Establishment Plan of Integrated Construction Information Classification)

  • 이교선;박환표;오은호;박상훈
    • 한국건설관리학회논문집
    • /
    • 제3권2호
    • /
    • pp.99-106
    • /
    • 2002
  • 국내의 통일된 정보분류체계 부재는 건설분야 정보화사업의 중복투자 및 건설정보의 사장 등 인적, 물적 손실과 한께 국가 경쟁력 향상에 장애요인을 초래하고 있다. 따라서 정부 또는 민간은 정보유통의 기반조성과 정보화사업의 중복투자 방지 및 정보의 공동이용을 위한 통일된 건설정보 분류체계의 표준화사업을 조속히 추진하여, 건설CALS, 건설사업관리, 설계 $\cdot$시공 통합정보시스템, EVMS(Earned Value Management System) 등 업무의 기반을 구축할 필요가 있다. 따라서, 본 고에서는 국내 실정에 맞는 건설정보 분류체계의 발전방향을 제시하고, 정보분류체계의 활용 및 실무 적용방안을 제시하고자 한다.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

중소건설사를 위한 클라우드 컴퓨팅 기반 EHS 통합관리시스템 프레임워크 개발 (The Framework Development of Cloud Computing-based Integrated EHS Management System for Small and Medium Construction Companies)

  • 서광규
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.139-143
    • /
    • 2010
  • The small and medium construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the framework of integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

아스팔트 포장의 품질향상을 위한 정보화 시공법 개발 (Developing Computer Integrated Construction Methodologies to Improve Quality of Asphalt Pavement)

  • 이희준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.208-213
    • /
    • 2001
  • The current progress in computer and electrical engineering has enabled the construction industry to implement innovative technologies in design and engineering. However, the construction segment is still largely based on experience, and this makes it difficult to meet the recent rigorous specifications, especially in the highway construction. This paper describes the current progress and the findings in the development of the computer integrated asphalt paving system, which is expected to assist the equipment operators to construct the quality pavement. The technologies to collect the required information, preferably in real-time, were reviewed comprehensively, and the selected technologies are proposed for the future development. Positional and thermal data were collected at the sample project in real-time to verify the capability of the available technologies. The collected data was analyzed using multiple regression method to confirm the significant factors for the compaction of the sample project, and to develop the empirical model, which can be adopted in the future system.

  • PDF