• 제목/요약/키워드: Installed Reserve

검색결과 17건 처리시간 0.03초

신재생에너지전원을 고려한 새로운 유효설비예비율 평가방법의 개발 (Development of Methodology of New Effective Installed Reserve Rate considering Renewable Energy Generators)

  • 박정제;최재석
    • 전기학회논문지
    • /
    • 제59권1호
    • /
    • pp.26-32
    • /
    • 2010
  • This paper proposes a new effective installed reserve rate in order to evaluate reliability of power system considering renewable generators, which include uncertainty of resource supply. It is called EIRR(effective installed reserve rate) in this paper. It is developed with considering capacity credit based on ELCC by using LOLE reliability criterion. While the conventional installed reserve rate index yields over-evaluation reliability of renewable generators, the proposed EIRR describes actual effective installed reserve rate. However, it is not the probabilistic reliability index as like as LOLE or EENS but another deterministic effective reliability index. The proposed EIRR is able to evaluate the realistic contribution to the reliability level for power system considering wind turbine generators and solar cell generators with high uncertainty in resource supply. The case study in model system as like as Jeju power system size presents a possibility that the proposed EIRR can be used practically as a new deterministic reliability index for generation expansion planning or operational planning in future.

확률론적인 신뢰도기준에 의한 적정설비예비율의 결정에 관한 연구 (A Study on Decision of Optimum Installed Reserve Rate using Probabilistic Reliability Criterion)

  • 박정제;최재석;윤용범;정영범
    • 전기학회논문지
    • /
    • 제57권8호
    • /
    • pp.1318-1326
    • /
    • 2008
  • This paper proposes an alternative methodology for deciding an optimum deterministic reliability level (IRR; Installed Reserve Rate) by using probabilistic reliability criterion (LOLE; Loss of Load Expectation). Additionally, case studies using the proposed method induce the characteristics of relationship between the probabilistic reliability index (LOLE) and deterministic reliability index (IRR) for 2008 and 2010 years in Korea power system. The case study presents a possibility that an optimum IRR level in Korea can be assessed using the proposed method. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion in Korea is that the loss of load expectation shall not exceed the available capacity more than five day in ten years (=0.5[days/year]), The probabilistic reliability evaluation and production cost simulation program which is called PRASim is used in order to evaluate the relationship and optimum IRR in this paper.

Design of a Cooperative Voltage Control System Between EMS (VMS) and DMS

  • Shin, Jeonghoon;Lee, Jaegul;Nam, Suchul;Song, Jiyoung;Oh, Seungchan
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제6권3호
    • /
    • pp.279-284
    • /
    • 2020
  • This paper presents the conceptual design of a cooperative control with Energy Management System (EMS) and Distribution Management System (DMS). This control enables insufficient reactive power reserve in a power transmission system to be supplemented by surplus reactive power in a power distribution system on the basis of the amount of the needed reactive power reserve calculated by the EMS. This can be achieved, because increased numbers of microgrids with distributed energy resources will be installed in the distribution system. Furthermore, the DMS with smart control strategy by using surplus reactive power in the distribution system of the area has been gradually installed in the system as well. Therefore, a kind of hierarchical voltage control and cooperative control scheme could be considered for the effective use of energy resources. A quantitative index to evaluate the current reactive power reserve of the transmission system is also required. In the paper, the algorithm for the whole cooperative control system, including Area-Q Indicator (AQI) as the index for the current reactive power reserve of a voltage control area, is devised and presented. Finally, the performance of the proposed system is proven by several simulation studies.

전력계통 안전을 위한 공급예비력 적정수준에 대한 연구 (A Research of Optimum Supply Reserve Levels for Stability of Power System)

  • 안대훈;권석기;주행로;최은재
    • 조명전기설비학회논문지
    • /
    • 제22권9호
    • /
    • pp.55-61
    • /
    • 2008
  • 최근 전력수요의 높은 증가율로 인하여 전력계통에 가장 안정적으로 전력을 공급하기 위한 적정예비력을 얼마만큼을 가져야 할 것인가? 하는 필요성이 강조되고 있다. 본 연구에서는 연도별 계통규모와 예비력 및 예비율의 변화 풍향 분석을 통하여 계통규모가 증가할수록 적정 예비력은 증가하고 있는 반면에 예비율은 하락하는 추세를 보이고 있는 것을 분석하였다. 이 자료를 관계로 현재시점에서 단기 전력수급전망에 적용되는 공급예비력으로 산정한 600만[kW]는 적정수준이라 여겨진다. 또한 최대전력수요가 5,000만[kW]를 넘어서면서 적정수준인 $10{\sim}12[%]$ 예비율 보다는 적정수준의 예비력을 산정하여 적용하는 것이 전력계통을 경제적이고 안정적으로 운영할 수 있다고 분석되었다.

공급지장기대치에 의한 적정설비예비율 결정에 관한 연구 (A Study on the Decision of Optimum Installed Reserve Rate by Loss of Load Expectation)

  • 박정제;오량;최재석;차준민;윤용범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.103-104
    • /
    • 2008
  • This paper proposes an alternative methodology for deciding an optimum deterministic reliability level (IRR; Installed Reserve Rate) by using probabilistic reliability criterion (LOLE; Loss of Load Expectation). Additionally, case studies using the proposed method induce the characteristics of relationship between the probabilistic reliability index (LOLE) and deterministic reliability index (IRR) for 2008 year in Korea power system. The case study presents a possibility that an optimum IRR level in Korea can be assessed using the proposed method. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion in Korea is that the loss of load expectation shall not exceed the available capacity more than five day in ten years (=0.5[days/year]). The probabilistic reliability evaluation and production cost simulation program which is called PRASim is used in order to evaluate the relationship and optimum IRR in this paper.

  • PDF

우리나라에서의 확률론적인 신뢰도와 공급예비율의 상관관계성에 관한 연구 (A study on the Characteristics of Relationship Between Probabilistic Reliability and Supply Reserve Rate in Korea Power System)

  • 박정제;정상헌;사박;오량;최재석;윤용범;정영범;차준민;윤용태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.173-175
    • /
    • 2007
  • This paper introduces the characteristics of relationship between probabilistic reliability (LOLE; Loss of Load Expectation) and deterministic reliability (SRR; supply reserve rate) for 2008 year in Korea power system. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion is that load shall not exceed the avaliable capacity, on the average, more than five day in ten years. The probabilistic reliability evaluation and production cost simulation program which is called PPHFHT was used in order to obtain the relationship in this paper.

  • PDF

수도권 순동 무효전력 확보를 위한 FACTS 협조제어 시스템 온라인 설치 (Installation of MFC(Multiple FACTS Coordinated control) On-line System for the Spinning Reserve of a Reactive Power in Metropolitan Area)

  • 장병훈;문승필;하용구;전웅재
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2131-2134
    • /
    • 2010
  • In this paper, the on-line system schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control system of FACTS devices, MFC on-line system calculates the optimal set point(Vref, Qrev) of FACTS devices using the coordinated control algorithm with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. As the test, MFC(Multiple FACTS Coordinated control) on-line system will be installed in Korea power system.

육지-제주간 2차 HVDC SYSTEM 개요 (The Introduction of #2 HVDC SYSTEM)

  • 장석한;유승환;신명식;이규용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.107-109
    • /
    • 2008
  • Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.

  • PDF

거시적방법에 의한 우리나라의 종합공급지장비단가 추정 (Evaluation of IEAR(Interrupted Energy Assessment Rates) using Macro Approach in Korea)

  • 박정제;오량;최재석;정영범;윤용범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.309-311
    • /
    • 2008
  • This paper introduces the characteristics of relationship between probabilistic reliability (LOLE; Loss of Load Expectation) and deterministic reliability (SRR; supply reserve rate) for 2008 year in Korea power system. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion is that load shall not exceed the avaliable capacity, on the average, more than five day in ten years. The probabilistic reliability evaluation and production cost simulation program which is called PPHFHT was used in order to obtain the relationship in this paper.

  • PDF

상용 프로그림을 이용한 콘크리트 중앙분리대 방호울타리들의 구조적 안정성에 대한 비교 분석 (Comparison Analysis on the Structural Stability of Concrete Median Barriers Using Commercial Software)

  • 주재웅;이성관
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.177-184
    • /
    • 2002
  • The concrete median barriers are the most popular safety appurtenances that can be installed on narrow medians and are effective in keeping uncontrolled vehicles from crossing into opposing lanes of traffic. It is necessary to install and maintain median barriers because it is very difficult to reserve enough room required for medians in KOREA. And concrete median barriers are accepted as the actual alternatives for median barriers, mostly because they require almost no maintenance even after serious collisions. Typical concrete median barriers are 810mm high and have 596mm high glare screens on top of them. But we have experienced a number of “climb” and “roll-over” accidents of heavy vehicles until now, and most of all, there have been some serious accidents caused by the part of broken glare screens. We have performed many computer simulations for the evaluation of the crashworthiness of concrete median barriers, and through the simulations we have tried to find a proper type of concrete median barrier.

  • PDF