• 제목/요약/키워드: Installation site

검색결과 652건 처리시간 0.027초

건설비계 설치작업의 위험요인 분석에 관한 연구 (A Study on Risk Factor Analysis of Construction Scaffold Installation)

  • 김경훈;부윤섭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.189-190
    • /
    • 2019
  • Designers and builders are omitting structural design and relying on workers' experience, due to the lack of awareness of the importance of scaffolding in domestic construction sites, and there is a high probability of collapsing accidents such as inappropriate wall joint installation and non-compliance with work procedures. Therefore, risk factors were analyzed in detail and major risk factors were derived from opinions of site managers and scaffolding experts in this study.

  • PDF

보강토 옹벽용 지오그리드의 현장 내시공성 및 강도 감소계수 평가에 관한 연구 (A Study on the Evaluation of Field Installation Damage and Strength Reduction Factor of Geogrid for Reinforced Retaining Wall)

  • 박주환;천병식
    • 한국지반환경공학회 논문집
    • /
    • 제13권7호
    • /
    • pp.5-12
    • /
    • 2012
  • 최근 국내에서 기존 RC옹벽보다 시공실적이 증가하고 있는 보강토 옹벽은 보강자재, 시공방법, 전면블럭의 형태에 따라 다양하지만 공법에 대한 안전성이 충분히 검증되지 않아 설계와 시공관리에 어려움이 많으며, 보강토 옹벽에 사용되는 보강재 등은 제조사별로 규격과 형상이 다양하고 영세한 업체에서 제작하였거나 일부 값이 싼 품질이 낮은 제품이 수입되고 있지만 이를 설계에 적용할 수 있는 적절한 기준이 제시되지 못하고 있는 실정이다. 이에 본 연구는 보강토 옹벽의 보강재인 옹벽용 그리드에 대하여 현장 내시공성 시험을 통해 다양한 형태의 옹벽용 그리드의 내시공성 감소계수를 제안하고, 국내외 연구결과 분석과 국내 시판되고 있는 제조사별로 제시한 옹벽용 그리드의 물성치를 조사 분석하였다. 결론적으로, 뒤채움재의 입경과 모난 정도의 차이, 입도 분포에 따라 감소계수에 미치는 영향이 크므로 일정규모 이상의 현장에서는 현장내시공성 시험을 거쳐 뒤채움재 별로 차별화된 감소계수를 적용하고, 보강벽체의 활용성에 따라 연성과 강성그리드를 잘 선정하여 적용함으로서 효과적으로 보강토 옹벽의 안전성을 높일 수 있음을 확인하였다.

지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구 (A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

설치미술의 조형적 사고와 표현특성 (The Artistic Thinking and Expressive Characteristics of Installation Art)

  • 김주미
    • 한국실내디자인학회논문집
    • /
    • 제26호
    • /
    • pp.104-111
    • /
    • 2001
  • This study deals with the expressive characteristics of Installation Art and their applicability to environmental design, and as such, aims to specify a artistic methods from the contemporary art. What Installation Art is search of in their works is "the state of relationships" which is "to replace the concept of form with that of structure, and the concept of space with that of the environment" that is, the terms of relations in the overall environment of time and space. Installation Art essentially relies on a multiplicity of forms and attitudes leading to projects which positively make use of "spatial-temporal process" to reaffirm and "problematise" their open-endedness manifest in complex contextuality and shifting temporality. This study presents a new interpretation of spatial-temporal dimension, site-specificity, and intermedia art that we find in Installation Art and tries to combine that new artistic insight a with environmental design to provide a basis for integrated art. This study places a great emphasis on the interdisciplinary approaches to the environment we inhabit, which I hope will contribute to generating a greater number of creative possibilities for environmental design.

  • PDF

Long-Term Performance of Geosynthetic Reinforcement Materials with Field Installation Condition

  • Jeon, Han-Yong;Mok, Mun-Sung;Cho, Seong-Ho;Byun, Sung-Weon;Lee, Joon-Seok
    • 한국섬유공학회:학술대회논문집
    • /
    • 한국섬유공학회 2003년도 가을 학술발표회 논문집
    • /
    • pp.305-306
    • /
    • 2003
  • In the case of the geosynthetics usage to soil structure, there are some damages by compaction. And these damages by the installation compaction result in the unexpected changes of short and long term properties of the structure. So in the case of index test, there are some problems to the exact evaluation on the installation damage. Therefore, to the more definite evaluation on the installation damage of geosynthetics, the real site installation damage test is encouraged. (omitted)

  • PDF

지하구내 수.변전설비 안전실태 조사 (A Research on the Safety Condition of Power Utilities Installed on Underground Premises)

  • 정종욱;정진수;이건호;김영석;배석명
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2006년도 춘계학술대회 논문집
    • /
    • pp.410-413
    • /
    • 2006
  • This paper describes the safety condition of power utilities installed on underground premises when flooding occurs. As advance preparations, the statistical data were investigated based on the rainfall trend; the flooding damage; the power utilities installation; the electric shock accidents, and domestic md foreign regulations pertaining to the power utilities installation on underground premises were also compared and analyzed. After the preliminaries, the safety condition of underground power utilities was inspected at site and the results were reflected on considering countermeasures. Based on the further studies, the regulations closely related to the underground power utilities installation can be modified.

  • PDF

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

지오그리드의 시공중 손상 평가를 위한 실험적 연구 (Experimental Study for Installation Damage Assessment of Geogrid)

  • 조삼덕;이광우;오세용
    • 한국환경복원기술학회지
    • /
    • 제8권1호
    • /
    • pp.27-36
    • /
    • 2005
  • Geosynthetic reinforcements may be damaged during its installation in the filed. The installation damage mainly depends on two factors such as materials used and construction activities. This paper describes the results of a series of field tests, which are conducted to assess the installation damage of geogrid according to different maximum grain sizes of fills (40, 60, and 80 mm). These tests are done in three sites for twelve different kinds of geogrids. After field tests, the changes in tensile strength of the geogrids is determined from wide width tensile tests using both damaged and undamaged specimens. In the results of tests, tensile strength of the relatively flexible geogrids after field installation tests was decreased about from 20% to 40% according to the increment of the maximum grain size. On the other hand, for the relatively stiff geogrids, the loss of the tensile strength after site installation was examined below 5.2% independent of the maximum grain size of the soils. The results of this study show that the installation damage significantly depends on the stiffness of geogrid and is more obvious to a flexible geogrid and a fill material having higher maximum grain size.

OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 - (A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method -)

  • 이한수;이치호;한희수;이정욱
    • 한국건설관리학회논문집
    • /
    • 제25권2호
    • /
    • pp.56-68
    • /
    • 2024
  • 최근 공동주택에서의 OSC (Off-Site Construction)기반 PC구조의 객관적인 원가기준 마련을 위해 공장제작-현장설치 단계의 공사비 산정을 위한 품셈 체계를 제안하였다(Lee et al., 2021). 또한, 건설공사 표준품셈에서도 보편적인 PC공사의 현장설치 단계에 적용할 수 있는 주요 부재의 표준품셈을 제시하는 등 PC공사의 공사비를 체계적으로 산출할 수 있는 제도적 기반이 마련되는 추세이다. 본 연구에서는 공동주택 PC구조의 현장조사 결과를 분석하고 전문가 의견을 수렴하여 공동주택 PC공법에 적용할 수 있는 공장제작-현장설치 품셈을 개발하였으며, 현행 표준품셈 기준과 비교하여 공동주택의 현장 및 부재특성에 적용할 수 있도록 표준품셈의 보완 방향을 제시하였다. 또한, 개발 품셈을 활용하여 공사비를 산출하고 동일규모의 공동주택 RC공법과 공사비를 비교함으로써 PC공법의 비용발생 특성 및 원가절감 방안을 도출하였다. 본 연구에서 도출한 PC공법의 표준품셈은 PC공법 공사비 산출결과의 객관성과 일관성을 확보함으로서 PC공법 적용 확산에 기여할 수 있을것으로 기대된다.

장죽수로 조류발전건설시 작업특성에 따른 산업잠수 작업한계 (Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel)

  • 김원석
    • 수산해양교육연구
    • /
    • 제25권3호
    • /
    • pp.733-742
    • /
    • 2013
  • The Korea has significant tidal current energy resources, but it is so hard to work underwater for tidal turbine installation. Therefore commercial diving work is very important for tidal current generator. Also, Jangjuk channel is vary famous as proper area to generate tidal current energy. Nevertheless, no one is studied about characteristics of commercial diving works with installation of tidal current generator. The purpose of this study is to introduce commercial diving with work types and investigate critical limits of diving working under the conditions, which are working only to minutes at slack tide during the neap tide. As the results, work types are five as like mooring installation, OMAS(Offshore Maintenance Access System), support structure installation, cable and turbine installation. Here, the original construction period is expected about 4 months, but the construction take 18 months to complete. The cause of extends construction period is insufficiency of researching tidal current conditions at the site and ignorance of slack tide which need to secure diving working time. Total diving working times are 110th during 18 months, the highest percentage of diving times is turbine installation about 43.6 %, and cable, mooring installation and support structure construction are 27.3 %, 15.5 %, 13.6 %, respectively. On the basis of this study, estimation of times of commercial diving is possible with work types of tidal current power, and has a significance as basic data to determining construction period.