THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu (Department of Precision Mechanical Engineering, Hanyang University) ;
  • Chong-Ho Choi (Department of Mechatronics, Hanyang University) ;
  • Seung-Yel Lee (Department of Mechatronics, Hanyang University) ;
  • Chang-Soo Han (Department of Precision Mechanical Engineering, Hanyang University)
  • Published : 2005.10.16

Abstract

Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

Keywords

Acknowledgement

This work was supported by the SRC/ERC program of MOST (grant R11-2005-056-03003-0)