• 제목/요약/키워드: Installation method

검색결과 3,262건 처리시간 0.03초

퍼지 추론과 구역 공간법을 이용한 조도 계산법 (Calculation of Illuminance Using Fuzzy Reasoning and Zonal Cavity Method)

  • 최홍규;강태은;원진희;조용상
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 1999년도 학술대회논문집-국제 전기방전 및 플라즈마 심포지엄 Proceedings of 1999 KIIEE Annual Conference-International Symposium of Electrical Discharge and Plasma
    • /
    • pp.240-246
    • /
    • 1999
  • This parer proposes fuzzy reasoning algorithm for improvement in Zonal Cavity Method that is difficult to calculate average illumination without lighting scope and reflection factor so on. This parer use fuzzy reasoning algorithm for maintainment of the best illumination in spite of some variation those are influenced of room illumination and cut down the difficult to be calculated used Zonal Cavity Method.

  • PDF

서지보호소자의 설치방식에 따른 기기의 뇌보호효과 검토 (Study On The Protective Effect of Lightning Surge for Electronic Equipments According to Installation Methods of Surge Protective Device)

  • 이석우;황규현;서호준;이동희
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2004년도 추계학술대회 논문집 Vol.17
    • /
    • pp.616-619
    • /
    • 2004
  • Lightning surge damages of low voltage equipments in building are increasing due to increase in electrical and communication networks in the information-oriented society. And electronic equipments contained electrical circuits with semiconductor are very weak against lightning surge. The surge protective devices for electronic circuit in electronic equipments and AC power lines are becoming more widely. To achieve effective method of surge protection, there are needs for correlation between lightning surge protective effect of electronic equipment and installation method of surge protective device. This paper describes as a result of experiments for correlation between lightning surge protective effect and installation method of surge protective device.

  • PDF

역타공법 뒷채움재 설치 구간의 사용성 개선을 위한 보강 방안 연구 (A study on Reinforcement Methods to Improve the Usability of the H-beam Backfill Installation Part in Top-Down Construction Method)

  • 심학보;전현수;석원균;박순전
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.180-180
    • /
    • 2021
  • Recently, structural damage and defect has occurred in the H-beam backfill installation part of Top-Down construction method. In order to secure structural safety and usability in the adjacent section of the backfilling method, It turns out that it is necessary to analyze by dividing into various cases. The H-beam backfill installation section is divided into the case of adding a vertical plate inside the slab, adding a shear stud, adding a reinforcing bar, changing the thickness of the pressure plate, and filling the H-beam backfill with mortar. Ansys modeling was performed and an appropriate solution was suggested by analysis.

  • PDF

A Study on the Dynamic Analysis of Mooring System During Hook-up Installation

  • Lee, Min Jun;Jo, Hyo Jae;Lee, Sung Wook;Hwang, Jea Hyuk;Kim, Jea Heui;Kim, Young Kyu;Baek, Dong Il
    • 한국해양공학회지
    • /
    • 제34권5호
    • /
    • pp.285-293
    • /
    • 2020
  • This study evaluated the Hook-up installation of an offshore site construction process, which is the final step in an offshore site installation process. During Hook-up installation, the offshore structure can have a detrimental effect on the work stability due to low-frequency motion. Moreover, economic costs can be incurred by the increase in available days of a tugboat. Therefore, this study developed a numerical analysis program to assess the dynamic behavior of mooring systems during hook-up installation to analyze the generally performed installation process and determine when the tugboat should be released. In this program, the behavior of an offshore structure was calculated using Cummin's time-domain motion equation, and the mooring system was calculated by Lumped mass method (LMM). In addition, a tugboat algorithm for hook-up installation was developed to apply the Hook-up procedure. The model used in the calculations was the barge type assuming FPSO (Floating production storage and off-loading) and has a taut mooring system connected to 16 mooring lines. The results of the simulation were verified by comparing with both MOSES, which is a commercial program, and a calculation method for restoring coefficient matrix, which was introduced by Patel and Lynch (1982). Finally, the offset of the structure according to the number of tugboats was calculated using the hook-up simulation, and the significant value was used to represent the calculation result.

인공어초 사후관리 현황과 발전방향 (Management after installation of artificial fish reefs -Present Condition and Development Scheme-)

  • 안승환;김동선;박경원;이성일
    • 해양환경안전학회:학술대회논문집
    • /
    • 해양환경안전학회 2005년도 추계학술대회지
    • /
    • pp.139-141
    • /
    • 2005
  • 인공어초의 기능을 복원하기 위하여 어초시설과 함께 어초어장의 사후관리는 중요하다. 전남 여수지역 6,142ha에 시설된 인공어초어장에 대하여 양방향음향탐사기(Side Scan Sonar) 및 잠수조사를 실시하고 어초의 시설상태, 생물상, 폐그물량을 조사하였다. 또한 보다 낳은 인공어초 사후관리 방법을 알아보고자 하였다.

  • PDF

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

자가용전기설비의 전력원단위 향상을 위한 전력관리 방안 (Recommended Practice for the Improvement of the Unit Cost of Power Consumption in Non-utility Electrical Installation)

  • 김세동
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2000년도 학술대회논문집
    • /
    • pp.235-240
    • /
    • 2000
  • This paper presents the reasonable method for electric power management through efficient use of electricity. With a rapid of national economics and living standard, electrical energy consumption markedly increased. Especially it is increased electrical energy consumption in commercial buildings and thus an energy conservation through efficient use of electricity became more important.

  • PDF

최적 발전성능 도출을 위한 태양광모듈 추적방법에 관한 연구 (A Study on the Tracking Method for Solar Module to Derive Optimum Performance)

  • 김용진;이종수;정유근;김정태
    • KIEAE Journal
    • /
    • 제12권1호
    • /
    • pp.113-118
    • /
    • 2012
  • The photovoltaic is one of the most important sustainable technologies appliable to architectures. The power performance mainly depends on the installation conditions of them. This study aims to evaluate the power performance of photovoltaic system by the installation conditions, the tracking methods and reflecting mirrors. For the study, the Solar Pro computer simulations have been conducted on installation angles, solar azimuth and solar altitude. Also, the field mock-up tests are performed to of its application to verify the simulation results. Both the results of the experiment and the simulation have proved that the efficiency of 90-degree fixed angle method was higher than that of 30-degree fixed angle, the efficiency of altitude tracking was better than that of azimuth tracking method, and changing both the altitude and the azimuth together is more efficient rather than the shortened tracing way. In addition, the light-concentrating method in which the incidence angle of the sun is controlled by an adhered reflector has been analyzed to have better efficiency than the general method of tracing according to the orbit of the sun. Therefore, this thesis is expected to offer the basic data to set a more effective tracing-type of photovoltaic power generation system in the future. For this, more researches are to be conducted hereafter on a high efficiency drive motor and the establishment of an economic system.

정보통신설비에 대한 뇌서지 보호소자의 효과적인 설치기법 (An Effective Installation Method of Lightning Protective Devices for Information and Communication Facilities)

  • 이복희;강성만;엄주홍;이동문;이수봉;정동철;안창환;전덕규;이경옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1754-1756
    • /
    • 2002
  • This paper deals with an effective installation method of lightning protective devices for information and communication facilities. Due to the potential difference between grounding of the AC power lines and communication lines, the equipments connected to the communication lines are easily damaged by lightning surges. So we have examined the behaviors of surge protective devices against lightning surges from the AC power lines and signal lines, and the coordination effects of SPD installation method were investigated. As a result, it was confirmed that the bypass arrester method and common grounding method were very effected.

  • PDF

합성 PC부재의 Steel-joint Connection Method 개발 기초연구 (A basic study of steel-joint connection method of composite precast concrete members)

  • 김근호;이동훈;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.10-11
    • /
    • 2013
  • Green Frame is a column-beam system formed by composite precast concrete column and beam connected with steel buried in both members. During the installation of Green columns, the columns of Green Frame, covering 3 floors per each piece and beams, the eccentricity can be observed due to the construction error and the weight of beam itself. Such eccentricity may have a little influence on a single frame, yet, it can develop critical issues to the installation of subsequent beams or beams on the upper floors in the context of a building as a whole that has multiple frames. These issues lead to delay in frame installation, decrease of productivity and increase of cost, etc. Therefore, this study presents a steel-joint connection method in order to solve the issues. The steel-joint connection method exists on slope plane and reinforcing plate in steel frame buried in composite PC members. Through this method, the issues can be resolved without requiring additional equipment or manpower.

  • PDF