• Title/Summary/Keyword: Installation Costs

Search Result 374, Processing Time 0.029 seconds

The development of LCC evaluation tool on Excel Base (엑셀 기반의 LCC 평가도구 개발)

  • Chung, Kwang-Woo;Kim, Chul-Su;An, Joon-Yong;Chung, Jong-Duk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1630-1641
    • /
    • 2010
  • LCC can be defined as "the sum of present values of investment costs, capital costs, installation costs, energy costs, operating costs, maintenance costs, and disposal costs over the life-time of the project, product, or measure." LCCA involves estimating the costs and timing associated with each alternative over a selected analysis period and conversion of those costs to economically comparable values considering the time-value of money. The several Excel-Based LCC tools found on the internet are described in this paper. Also, This paper performed an analysis of the existing LCC commercial tools, assessing various aspects of each program. The goal was to evaluate the best features of each tool and to identify the requirements for LCC evaluation of Urban Transit Vehicle. The LCC tools are developed to address problems in many different areas and a tool developed and structured for one area cannot generally be used in another area. No general LCC tool exists and if one is needed for Urban Transit Vehicle it has to be developed by the project. Since a full LCC can be very complex it is likely that this Excel-Based LCC tool should be a small and simple tool for quick cost estimates. This paper presents a LCC tool consisting of eight excel sheets, which are "Project", "CBS", "PBS", "PM", "CM", "Others", "LCC Result" and "Diagram".

  • PDF

Evaluation and Improvement Measures on the Status of the Installation and Operation of Facilities for Recycling Food Waste into Resources (음식물 자원화시설의 설치·운영에 대한 일반현황의 평가 및 개선 방안)

  • Ryu, Ji-Young;Kong, Kyu-Sik;Shin, Dae-Yewn;Phae, Chae-Gun
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.12 no.3
    • /
    • pp.63-75
    • /
    • 2004
  • This research sought to determine the status of the installation and operation of domestic public resource-making facilities of resource-making facilities and come up with corresponding improvement measures. Currently compost is most numerous set-up out of facilties already established ever since, then the rest of them are feeds, anaerobic degradation, sewage combination, and combination of compost and feeds in order. As such, food waste is processed more into compost than into feeds, presumably because relevant facilities, which were originally designed for processing into feeds, were converted into composting facilities due to little demand for the processed feeds. The finding says that many related firms had yet to register their businesses in accordance with feeds and fertilizers management laws, and that food waste resources-making facilities used various basic facilities but few of them treated food waste in linkage with leaching water, bad odors, and energy. Some of current facilities were found to be 7 years old and thus outdated. Due to lack of skilled operational manpower, many facilities had less than 300 days of normal operation yearly, and some needed minor and serious repairs periodically. In overall facilities, 87% of the planned food waste was rolled in, thus requiring measures to treat the whole planned volume. For costs of resource-making facilities, some with a capacity of below 50 tons topped 100 million won, and facilities with a capacity of over 50 tons required less installation costs. Overall, installation costs ranged from 10 million to 20 million, and to 200 million won per ton, and this suggests a need to establish the installation cost calculation criteria, as well as to reshape the facility criteria. With operating costs varying greatly according to the size and treatment methods of facilities, the finding indicates a need to rationalize the operating costs, and to plan appropriate-size installation and operation of facilities to ensure economic operation.

  • PDF

The Development of a Flood Protection System for Pad Transformers Using Pneumatic Pressure in Areas Prone to Floods

  • Kim, Gi-Hyun;Lee, Jae-Yong;Bae, Suk-Myong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.3
    • /
    • pp.27-32
    • /
    • 2010
  • The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown areas and low-lying shores by torrential rain, typhoons and tsunamis. It has, in turn, caused replacement, social and economic costs for blackouts. For activity management regarding flood damage we produced a flood protection system which using the Pad transformer as a basic frame and is developed using pneumatic pressure. We tested safety concerns including insulation resistance and current leakage first for water tank flooding and, second, by an empirical test through supplying 22.9[kV]. We estimate that costs associated with flooding and power failure can be diminished by these advances toward creating a more reliable system.

Optimal Capacitor Placement in a Distribution System Considering Lifetimes of Devices (기기 수명을 고려한 배전계통 커패시터의 설치 계획)

  • Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.2
    • /
    • pp.164-171
    • /
    • 2008
  • This paper proposes the planning method for placement of capacitors in a distribution system. The main objectives in the planning for capacitor allocation are the reduction of installation costs and electric power loss. In the proposed method, the life time of each device is considered in calculating installation costs, and the optimal operation status of devices is found by genetic algorithm. Then, the optimal numbers and locations are determined based on the optimal operation status. Simulation results in the 69-bus distribution system show that the proposed method performs better than conventional methods.

A Study on the Operation of Distribution System for Increasing Grid-Connected Distributed Generation (분산형전원 연계용량 증가를 위한 배전계통 운영방식에 관한 연구)

  • Nam-Koong, Won;Jang, Moon-Jong;Lee, Sung-Woo;Seo, Dong-Wan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.83-88
    • /
    • 2014
  • When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.

Evaluation of Installation Damage Factor for Geogrid with Particle Size (입도에 따른 지오그리드의 시공손상계수 산정)

  • Lim, Seong-Yoon;Song, Chang-Seop
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.3
    • /
    • pp.113-120
    • /
    • 2010
  • Reduction factor for installation damage required to calculate design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demand lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method to evaluate reduction factor for installation damage using maximum particle size in backfill material is suggested.

Optimal Allocation of Shunt Capacitor-Reactor Bank in Distribution System with Dispersed Generators Considering Installation and Maintenance Cost (분산전원을 포함한 배전계통에서 설치비용과 유지보수 비용을 고려한 병렬 캐패시터-리액터 Bank의 최적 설치 위치 선정)

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Lee, Woo-Ri;Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1511-1519
    • /
    • 2013
  • This paper proposes the allocation method for capacitor-reactor banks in a distribution system with dispersed generators to reduce the installation costs, the maintenance costs and minimize the loss of electrical energy. The expected lifetime and maintenance period of devices with moving parts depends on the total number of operations, which affects the replacement and maintenance period for aging equipment under a limited budget. In this paper, the expected device lifetimes and the maintenance period are included in the formulation, and the optimal operation status of the devices is determined using a genetic algorithm. The optimal numbers and locations for capacitor-reactor banks are determined based on the optimal operation status. Simulation results in a 69-bus distribution system with the dispersed generator show that the proposed technique performs better than conventional methods.

A Study on the Proper Number of Banks of Parallel Operation of Transformer in Large-scale Power Plants Using the High Temperature Fuel Cell Considering the Internal Failure (내부고장을 고려한 고온형 연료전지 대규모 발전단지의 병렬운전 변압기 적정 뱅크수에 관한 연구)

  • Chong, Young-Whan;Chai, Hui-Seok;Sung, In-Je;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.26-31
    • /
    • 2014
  • High temperature fuel cell system, such as molten carbonate fuel cells(MCFC) and solid oxide fuel cells(SOFC), are capable of operating at MW rated power output. The power output change of high temperature fuel cell imposes the thermal and mechanical stresses on the fuel cell stack. To minimize the thermal-mechanical stresses on the stack and increase the systems reliability, we should divide the power plant configuration to several banks. However, the improvement of reliability in fuel cell power plant system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we evaluate the cost for operation and installation, the benefit for electric energy and thermal energy sales, and the system reliability for several cases : these cases relate with the bank configuration.

Analysis of Transient Voltage by Lightning Stroke at 345kV Step-up Transformer (345kV 승압용 변전소의 뇌격에 의한 이상전압 해석)

  • Cho, Man-Young;Shin, Ho-Jeon;Huh, Jae-Sun;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.95-101
    • /
    • 2012
  • Typically, large scale power generation facilities are linked to 345kV transmission line through a step-up transformer. If the value of transient voltage by generating lightning stroke is large more than electric equipment's BIL, devices insulation is destroyed. LA(Lighting Arrester) is used as a main means of prevention. However, the installation of LA takes the constraints of installation place and expensive installation costs. Therefore, we need to carefully study whether installation of installation can be omitted and the most efficient place of installation. In this paper, we simulated the transient voltage detected by lightning stroke at each equipments in the 345kV transmission power grid by using EMTP-RV program.

A Study on the Analysis Method of Safety Cost of Tunnel Accident (터널사고 재난 안전비용 분석 방법에 관한 연구)

  • Baek, Chung-Hyun
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.1
    • /
    • pp.23-30
    • /
    • 2021
  • This paper analyzed a survey of 388 general target samples to analyze the correlation between disaster safety costs and human risk factor analysis and evacuation behavior due to tunnel accidents. Considering the impact of the tunnel accident on disaster safety costs and the correlation between human evacuation and risk factors in the tunnel environment, the system should be reorganized to reflect the tunnel's basic plan, tunnel cross-section, tunnel installation.