DOI QR코드

DOI QR Code

A Study on the Operation of Distribution System for Increasing Grid-Connected Distributed Generation

분산형전원 연계용량 증가를 위한 배전계통 운영방식에 관한 연구

  • 남궁원 (전력연구원 배전연구소) ;
  • 장문종 (전력연구원 배전연구소) ;
  • 이성우 (전력연구원 배전연구소 스마트 그리드 그룹) ;
  • 서동완 (전력연구원 배전연구소)
  • Received : 2014.07.11
  • Accepted : 2014.07.28
  • Published : 2014.09.30

Abstract

When DG interconnection into network is examined, details of the review are overvoltage, protective device malfunction, etc. In the case of protective device malfunction, replacing protective device into bi-directional protective device and installation NGR are the solution. Overvoltage at interconnection point occurs because the load is relatively less than DG output. When overvoltage at interconnection point occurs, DG interconnection is not permitted because this overvoltage affect other customers. Interconnection by installation new distribution line is one solution but it costs much money. Without installation new investment, change of NOP(Normal Open Point) position is a possible solution about DG interconnection into network.

Keywords

References

  1. R.S. Rao, K. Satish, S.V.L. Narasimham, Power Loss Minimization in Distribution System Using Nerwork Reconfiguration in the Presence of Distributed Generation, IEEE TRANSACTIONS ON POWER SYSTEM, VOL. 28, NO. 1, Feb. 2013.
  2. Yuan-Kang Wu, Ching-Yin Lee, Le-Chang Liu, Shao-Hong Tsai, Study of Reconfiguration for the Distribution System With Distributed Generators, IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 25, NO. 3, July 2010.
  3. B. Radha, R.T.F. Ah King, H.C.S. Rughooputh, Optimal network reconfiguration of electrical distribution systems , Industrial Technology, 2003 IEEE International Conference on Indusrtial Technology, IEEE, VOL. 1, Dec. 2003.