• Title/Summary/Keyword: Initial installation cost

Search Result 104, Processing Time 0.028 seconds

Feasibility Study on Installation of Individual Room Control Ventilation in Apartment House (공동주택의 실별 제어환기 도입 타당성 분석)

  • Kim, Jung-Yup;Shin, Hyun-Joon;Kwon, Yong-Il;Yun, Young-Woo;Cho, Chun-Sik
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.502-507
    • /
    • 2009
  • Trend of mechanical ventilation system applied to apartment house is introduced and feasibility study on installation of the individual room control ventilation as energy-saving method is carried out through field experiment. While initial cost of installation for the individual room control ventilation increases, the running cost is lower than the individual household control ventilation due to automatic flow rate control and reduction of fan power, and the management cost also decreases due to extension of use life of components. As the results of field experiment on $115m^2$-type apartment house, the individual room control ventilation could save the amount of 1,459.5Wh/day when compared with the individual room control ventilation

  • PDF

Development of low-cost, low-depth unit-type ground heat exchanger (저심도 저비용 유닛형 지중열교환기의 개발)

  • Oh, Jin-Hwan;Nam, Yujin;Chae, Ho-Byung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.166-167
    • /
    • 2014
  • Recently, in according to increase cognizance of energy and resources exhaustion, renewable energy system is received attention. In particular, ground heat pump system(GSHP) utilizing annually stable ground temperature for energy saving have been attracted in many buildings. However, GSHP system have disadvantage due to increase of initial installation and boring cost. In this study, in order to reduce the initial cost and to supply ground heat pump system into small scale house, an unit-type ground heat exchanger was developed.

  • PDF

Economic Evaluation of Various Cooling Systems (냉방기기별 경제성 평가)

  • Kim, Young-Il;Cho, Keum-Nam
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.214-219
    • /
    • 2008
  • In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

  • PDF

Evaluation of Performance and Maintenance Cost for Roadside's Particulate Matter Reduction Devices Using Smart Green Infrastructure Technology (스마트 그린인프라 기술을 활용한 도로변 미세먼지 저감장치의 성능 및 유지·관리 비용 평가)

  • Song, Kyu-Sung;Seok, Young-Sun;Yim, Hyo-Sook;Chon, Jin-Hyung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.4
    • /
    • pp.15-31
    • /
    • 2022
  • The Green Purification Unit System (GPUS) is a green infrastructure facility applicable to the roadside to reduce particulate matter from road traffic. This study introduces two types of GPUS (type1 and type2) and assesses the performance and maintenance costs of each of them. The GPUS's performance analysis used the data collected in November 2021 after the installation of the GPUS type1 and type2 at the study site in Suwon. The changes in the particulate matter concentration near the GPUS were measured. The maintenance cost of GPUS type1 and type2 was assessed by calculating the initial installation cost and the management and repair cost after installation. The results of the performance analysis showed that the GPUS type1, which was manufactured by combining plants and electric dust collectors, had a superior particulate matter reduction performance. In particular, type1 produced a greater effect of particulate matter reduction in the time with a high concentration (50㎍/m3 or higher) of particulate matter due to the operation of electric dust collectors. GPUS type2, which was designed in the form of a plant wall without applying an electric dust collector, showed lower reduction performance than type1 but showed sufficiently improved performance compared to the existing band green area. Meanwhile, the GPUS type1 had three times higher costs for the initial installation than GPUS type2. In terms of costs for managing and repairing, it was evaluated that type1 would be slightly more costly than type2. Finally, this study discussed the applicability of two types of GPUS based on the result of the analysis of their particulate matter performance and maintenance cost at the same time. Since GPUS type2 has a cheaper cost than type1, it could be more economical. However, in the area suffering a high concentration of particulate matter, GPUS type1 would be more effective than type2. Therefore, the choice of GPUS types should rely on the status of particulate matter concentration in the area where GPUS is being installed.

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

A Study on the Electric System Design by the Forecasting of Maximum Demand (최대수요전력 예측에 의한 전기계통 설계에 관한 연구)

  • 황규태;김수석
    • The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.6 no.1
    • /
    • pp.29-39
    • /
    • 1992
  • In this paper, the basic idea of optimum electric system design by means of the forecasting of maximum demand is presented, and the load characteristics and practical operating conditions are based on the technical data. After reconstruction of th model plant by use of above method, power supply reliability, future extention, initial cost, and running cost saving effects are analyzed. As a result, it is verified that the systems wherein the power is supply to each load frm main transformer whose capacity is calculated by forecasting are economic rather than the systems wherein the power is supply to each electric feeders from each corresponding transformer.

  • PDF

Study on feasibility analysis for ground source heat pump system using the building foundation (건물기초 이용 지열시스템의 도입 타당성 분석에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.155-157
    • /
    • 2013
  • Ground source heat pump(GSHP) systems have been attracted as high-efficient energy-saving technology, but the building clients and designers have hesitated to use GSHP systems which is a expensive initial installation and a uncertain economic feasibility. Therefore In order to reduce the initial cost, many researchers have focused on the energy-pile system using the structure of the building as a heat exchanger. Even though many of experimental studies for energy pile system have been conducted, there was not enough data of a quantitative evaluation with the economic analysis and comprehensive analysis for energy-pile. In this study, the feasibility study for the energy pile system with a barrette pile was conducted by the performance analysis and LCC assessment.

  • PDF

A study of Comparative Analysis of CPV and PV Module through Long-term Outdoor Testing (장기 Outdoor Test를 통한 CPV와 PV 모듈의 발전량 비교분석)

  • Kim, Minsu;Lee, Yuri;Cho, Minje;Oh, Soo Young;Jung, Jae Hak
    • Current Photovoltaic Research
    • /
    • v.5 no.1
    • /
    • pp.33-37
    • /
    • 2017
  • Today, photovoltaic power generation mostly uses Si crystalline solar cell modules. The most vulnerable part of the Si solar cell module is that the power generation decreases due to the temperature rise. But, it is widely used because of low installation cost. In the solar market, where Si crystalline solar cell modules are widely used. The CPV (Concentrated Photovoltaic) module appeared in the solar market. The CPV module reduces the manufacturing cost of the solar cell by using non-Si in the solar cell. Also, there is an advantage that a rise in temperature does not cause a drop in power generation. But this requires high technology to install and has a disadvantage that the initial installation cost is expensive compared to normal Si solar cell module. So that we built a testbed to see these characteristics. The testbed was used to measure the amount of power generation in a long-term outdoor environment and compared with the general Si solar cell module.

Design and implementation of Voice Transmission System using Open Source Hardware and Event based Non-Blocking I/O Algorithm (오픈소스 하드웨어와 이벤트 기반 논 블로킹 I/O 알고리즘을 활용한 음성송출 시스템 설계 및 구현)

  • Kim, HyungWoo;Lee, Hyun Dong
    • Smart Media Journal
    • /
    • v.9 no.3
    • /
    • pp.116-121
    • /
    • 2020
  • Digital Information Display and KIOSK have a problem that initial introduction cost and maintenance cost due to the development cost of dedicated contents and installation cost are high due to the characteristics of the product. In order to solve these problems, We designed and implemented of voice transmission system using Open Source Hardware and Event based Non-Blocking I/O Algorithm.

Strategic Vitalization Method of AMP Installation through SWOT/AHP Analysis (SWOT/AHP 분석을 통한 전략적 AMP 설치 활성화 방안)

  • Kim, In-Ho;Lee, Kang-Won
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.49-60
    • /
    • 2019
  • Recently the concentration of fine dust and ultra fine dust becomes so bad, which seriously threatens the health and even the life of people. So, government started to investigate several ways to reduce the amount of fine dust and ultra fine dust. From a few years ago it has been known that ships anchored at port emit a lot of pollution and seriously affect air quality of neighboring cities. To reduce the pollution emitted by ship AMP (Alternative Maritime Power Supply) has been proposed, which uses the electricity instead of bunker C oil or diesel. Many developed countries already installed AMP to improve air quality in port area. Korea is in the stage of planning to install AMP at port. However, there are many complicated problems to be handled before AMP installation. Due to huge initial cost and long period of construction ship owner and habour operating company are reluctant to AMP installation. And there are serious technological difficulties in constructing AMP in existing harbour. Lack of AMP core technology and operational difficulties of AMP are also big challenges to be conquered. In this study SWOT/AHP method is used to find strategic and efficient ways to handle above complicated challenges and then to vitalize the AMP installation.