Kim, Jung-Yup;Shin, Hyun-Joon;Kwon, Yong-Il;Yun, Young-Woo;Cho, Chun-Sik
Proceedings of the SAREK Conference
/
2009.06a
/
pp.502-507
/
2009
Trend of mechanical ventilation system applied to apartment house is introduced and feasibility study on installation of the individual room control ventilation as energy-saving method is carried out through field experiment. While initial cost of installation for the individual room control ventilation increases, the running cost is lower than the individual household control ventilation due to automatic flow rate control and reduction of fan power, and the management cost also decreases due to extension of use life of components. As the results of field experiment on $115m^2$-type apartment house, the individual room control ventilation could save the amount of 1,459.5Wh/day when compared with the individual room control ventilation
Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.166-167
/
2014
Recently, in according to increase cognizance of energy and resources exhaustion, renewable energy system is received attention. In particular, ground heat pump system(GSHP) utilizing annually stable ground temperature for energy saving have been attracted in many buildings. However, GSHP system have disadvantage due to increase of initial installation and boring cost. In this study, in order to reduce the initial cost and to supply ground heat pump system into small scale house, an unit-type ground heat exchanger was developed.
In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.
Journal of the Korean Society of Environmental Restoration Technology
/
v.25
no.4
/
pp.15-31
/
2022
The Green Purification Unit System (GPUS) is a green infrastructure facility applicable to the roadside to reduce particulate matter from road traffic. This study introduces two types of GPUS (type1 and type2) and assesses the performance and maintenance costs of each of them. The GPUS's performance analysis used the data collected in November 2021 after the installation of the GPUS type1 and type2 at the study site in Suwon. The changes in the particulate matter concentration near the GPUS were measured. The maintenance cost of GPUS type1 and type2 was assessed by calculating the initial installation cost and the management and repair cost after installation. The results of the performance analysis showed that the GPUS type1, which was manufactured by combining plants and electric dust collectors, had a superior particulate matter reduction performance. In particular, type1 produced a greater effect of particulate matter reduction in the time with a high concentration (50㎍/m3 or higher) of particulate matter due to the operation of electric dust collectors. GPUS type2, which was designed in the form of a plant wall without applying an electric dust collector, showed lower reduction performance than type1 but showed sufficiently improved performance compared to the existing band green area. Meanwhile, the GPUS type1 had three times higher costs for the initial installation than GPUS type2. In terms of costs for managing and repairing, it was evaluated that type1 would be slightly more costly than type2. Finally, this study discussed the applicability of two types of GPUS based on the result of the analysis of their particulate matter performance and maintenance cost at the same time. Since GPUS type2 has a cheaper cost than type1, it could be more economical. However, in the area suffering a high concentration of particulate matter, GPUS type1 would be more effective than type2. Therefore, the choice of GPUS types should rely on the status of particulate matter concentration in the area where GPUS is being installed.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.10a
/
pp.71-72
/
2016
Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.6
no.1
/
pp.29-39
/
1992
In this paper, the basic idea of optimum electric system design by means of the forecasting of maximum demand is presented, and the load characteristics and practical operating conditions are based on the technical data. After reconstruction of th model plant by use of above method, power supply reliability, future extention, initial cost, and running cost saving effects are analyzed. As a result, it is verified that the systems wherein the power is supply to each load frm main transformer whose capacity is calculated by forecasting are economic rather than the systems wherein the power is supply to each electric feeders from each corresponding transformer.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.155-157
/
2013
Ground source heat pump(GSHP) systems have been attracted as high-efficient energy-saving technology, but the building clients and designers have hesitated to use GSHP systems which is a expensive initial installation and a uncertain economic feasibility. Therefore In order to reduce the initial cost, many researchers have focused on the energy-pile system using the structure of the building as a heat exchanger. Even though many of experimental studies for energy pile system have been conducted, there was not enough data of a quantitative evaluation with the economic analysis and comprehensive analysis for energy-pile. In this study, the feasibility study for the energy pile system with a barrette pile was conducted by the performance analysis and LCC assessment.
Kim, Minsu;Lee, Yuri;Cho, Minje;Oh, Soo Young;Jung, Jae Hak
Current Photovoltaic Research
/
v.5
no.1
/
pp.33-37
/
2017
Today, photovoltaic power generation mostly uses Si crystalline solar cell modules. The most vulnerable part of the Si solar cell module is that the power generation decreases due to the temperature rise. But, it is widely used because of low installation cost. In the solar market, where Si crystalline solar cell modules are widely used. The CPV (Concentrated Photovoltaic) module appeared in the solar market. The CPV module reduces the manufacturing cost of the solar cell by using non-Si in the solar cell. Also, there is an advantage that a rise in temperature does not cause a drop in power generation. But this requires high technology to install and has a disadvantage that the initial installation cost is expensive compared to normal Si solar cell module. So that we built a testbed to see these characteristics. The testbed was used to measure the amount of power generation in a long-term outdoor environment and compared with the general Si solar cell module.
Digital Information Display and KIOSK have a problem that initial introduction cost and maintenance cost due to the development cost of dedicated contents and installation cost are high due to the characteristics of the product. In order to solve these problems, We designed and implemented of voice transmission system using Open Source Hardware and Event based Non-Blocking I/O Algorithm.
Journal of Korean Society of Industrial and Systems Engineering
/
v.42
no.4
/
pp.49-60
/
2019
Recently the concentration of fine dust and ultra fine dust becomes so bad, which seriously threatens the health and even the life of people. So, government started to investigate several ways to reduce the amount of fine dust and ultra fine dust. From a few years ago it has been known that ships anchored at port emit a lot of pollution and seriously affect air quality of neighboring cities. To reduce the pollution emitted by ship AMP (Alternative Maritime Power Supply) has been proposed, which uses the electricity instead of bunker C oil or diesel. Many developed countries already installed AMP to improve air quality in port area. Korea is in the stage of planning to install AMP at port. However, there are many complicated problems to be handled before AMP installation. Due to huge initial cost and long period of construction ship owner and habour operating company are reluctant to AMP installation. And there are serious technological difficulties in constructing AMP in existing harbour. Lack of AMP core technology and operational difficulties of AMP are also big challenges to be conquered. In this study SWOT/AHP method is used to find strategic and efficient ways to handle above complicated challenges and then to vitalize the AMP installation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.