Since most of studies for information efficiency measurement of healthcare organizations have mainly focused on searching a measuring standard used for performance of informatization and each researchers subjective standard having been used, they can not be easily measured and objective. This study showed a possibility that efficiency measurement of healthcare organization can be performed by solving a problem related to objectiveness, which may occur in measuring many organization with many measuring items, with DEA (data envelopment analysis). For proving this possibility, efficiency evaluation and analysis for information resources utilization of domestic tertiary healthcare organizations have been performed by using DEA model. As a result, DMU (decision making unit) having efficiency rate of 1 will be evaluated that output is higher than input and information resources are being used efficiently, but on the other hand, DMU having efficiency rate of below 1 will be evaluated that output is lower than input and information resources are being used inefficiently, which is required to be improved.
This study conducted topic modeling, association analysis, and sentiment analysis focused on text mining in order to reflect regional characteristics in the process of establishing an information plan in Chungcheongbuk-do. As a result of the analysis, it was confirmed that Chungcheongbuk-do occupies a relatively high proportion of educational activities to bridge the information gap, and is interested in improving infrastructure to provide non-face-to-face, untouched administrative services, and bridge the gap between urban and rural areas. In addition, it is necessary to refer to the fact that there is a positive evaluation of the combination of bio and IT in the regional strategic industry and examples of ICT innovation services. It has been confirmed that smart cities have high expectations for the establishment of various cooperation systems with IT companies, but continuous crisis management is necessary so that they are not related to political issues. It is hoped that the results of this study can be used as one of the methods to specifically reflect regional changes in the process of informatization.
It is very difficult problem to estimate and evaluate the performance of e-government system which scope and size are large and its effectiveness can not be seen shortly but reveals after several years. It is because the previous offline processes can not be transformed to online ones fully and shortly. For such e-transformation cases, the performance evaluation model should be adjusted and modified gradually as time passes. This paper propose new EEM(E-transformation Evaluation Model) model and methodology to evaluate G2B system that is one of large e-government project. EEM model can derive monetary value of e-transformatized business process areas(online areas). It also estimate the expected effect of offline area that is not yet transformed to online. EEM model consists of standard model, verification model and estimation model with some variables such as evaluation year, evaluation area and data type. By using survey data and database data together it can validate the correctness of the model and derive the effect of the system introduction. This paper also propose EEM evaluation methodology consisting of 5 stages and 10 sub processes to evaluate online and offline effect efficiently. To show the usefulness of this study, we evaluate the performance of Korea G2B system named KONEPS which is famous as a successful e-government case in the world by using the proposed model and methodology. The proposed model and methodology can be applied to different similar areas including e-government projects and large scale information system introduction in private sectors. This study can be also used for establishing appropriate policies about e-government project and informatization issues.
There are many evaluation models to measure the informatization level of an organization and information system project in the ministry of National Defense of Korea. A information system has to keep up with the environment change as well as the advanced recent information technology (IT). Therefore, the evaluation of an information system project to enhance the performance of the information system should be different from the existing evaluation methods. This study suggests an evaluation case of information system projects to enhance the performance of an information system. In order to achieve the objective of this study, the following steps are taken. First, it reviews the background and the scope of the project to enhance the performance of the Defense Material Information System (DMIS). And it sets up the evaluation logic and develops performance indexes. Then it applies these newly developed performance indexes to the information system project and measures the performance. From this study, we found that both the diffusion and the experience accumulation by its continuous use are significant factors in such evaluations.
Journal of Information Technology Applications and Management
/
v.16
no.4
/
pp.205-222
/
2009
Considering time-lag in the performance evaluation of information system (IS) investment is important because its effect reveals after certain period of time passed. Particularly it is more in the systems of e-government informatization projects which the amount of investment and the scale of business are huge. Many methods to solve this issue have been proposed such as system dynamics methods, simulations, structural equations etc. However, it is still difficult and unsolved problem because collecting practical data for time-lag analysis is very hard. In this paper, we analyze IS time-lag effect through factor analysis using the accumulated practical operational DB data. For the performance evaluation of the G4C system, the representative e-government web portal, we selected eleven factors reflecting time passing in G4C DB data. With these factors this paper conduct time-lag analysis in four view points. First, we conducted 'Stabilizing of G4C system' and got a result that IS is needed about three years for the stabilization. Second, we conducted 'Utilization of G4C system' and got a result that the utilization reaches appropriate level after in three years later after the introduction of G4C system. Third, we conducted 'Cost reduction effect' and got a result that cost reduction is stable in the third year after the introduction of G4C system. Lastly, we conducted 'System maturity effect' and got a result that the system reaches to the quality level that users expect after third to fourth years. According to the results of this research, we found that performance of IS improv continuously not immediately, and it needs three or four years of time-lag.
Journal of The Korean Association of Information Education
/
v.19
no.3
/
pp.311-322
/
2015
This study analyzed the trend and problems in the design of contents developed by teachers, and suggested strategies for improvement. It analyzed the contents ranked as the first level in the Research Competition on Educational Informatization for the last 3 years. Concerning the 8 types of instructional activities and the 6 types of knowledge acquisition, most contents took limited types(i.e., the individual tutoring type, the concept learning type and the principle learning type). In addition, when the contents were evaluated according to the quality certification criteria for educational software, it was found that the quality level of the design was low in many criteria. When the content analysis was applied for the in-depth analysis of design characteristics, various problems were found in the areas such as evaluation, feedback and learning objectives. Also other common problems were found in the design areas such as level-based differentiated learning, interaction between students and contents, presentation of text and narration, utilization of information on a student, screen design, the content level appropriate for students. In relation to the problems found from the analysis, some strategies for improvement were suggested concerning the following topics: question selection and guidance for evaluation, content and types of feedback, statement of learning objectives, selection of content, interaction, and screen design.
Journal of Information Technology Applications and Management
/
v.9
no.1
/
pp.1-26
/
2002
ERP is the key-enabler of enterprise's informatization. Seletion of a right ERP system is one of the critical issues. Previous study shows that since a very few methodologies of selecting ERP systems are provided, most of companies have difficulty in Implementing ERP system. The purpose of this study is to analyze the characteristics of ERP system selection factors and develop the ERP evaluation methodology An empirical study is performed and shows that there are signigicant differences in ERP selection factors among ERP consultant, ERP developer, and system manager. The result shows that five factors such as general characteristics of software and supplier, technology characteristics of software and supplier, and Project management shills are significant. Based on the five factors, the evaluation methodology is developed. The methodology will help enterprises to make better decision in selecting ERP systems.
It is important to verify the validity of indicators assessing PMIS(Public Management Information System) effectiveness in academic research as well as practical affairs. As people invest in the field of Information Technology(IT) or IT system, private corporations are interested in investment in IT and it's business value. Moreover, the need of evaluating effectiveness on the investment in IT with the limited national budget are on the increase in public sector. Therefore, it is necessary to define the construct of PMIS(Public Management Information System) effectiveness so that we systematically compare and measure performance of public informatization project processed by each public organizations. It needs to develop indicators and verify the construct validity of them. we verified the construct validity of indicators assessing PMIS(Public Management Information System) effectiveness on the Administration DB Construction Projects.
Journal of the Korea Institute of Information and Communication Engineering
/
v.6
no.7
/
pp.1020-1025
/
2002
Government R&D Programs' success and failures depend on the choice of the excellent project from diverse proposal. Therefore project evaluation process should be transparency, objectivity and confidence. Institute of Information Technology and Assessment(IITA) working for the Ministry of Information and Communication(MIC). IITA management the informatization fund and government R & D program. IITA have execute choice of R & D project and assessment proposals and reformed the system of evaluation. This advanced evaluation system made in the end of the 90's and adapted it to the college basic R & D program in 1999. Advanced evaluation system is electronic and remote system. This advantage is very shift and correct to process. So the system save the task and money from 46% to 78%. But it is some Problem, security and technical experts for the choice of the Government R & D project in remote evaluation system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.