• 제목/요약/키워드: Information quantity analysis

검색결과 481건 처리시간 0.026초

BIM 기반의 공간객체를 이용한 물량산출 정확성 분석 (An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object)

  • 차유나;김성아;진상윤
    • 한국BIM학회 논문집
    • /
    • 제4권4호
    • /
    • pp.13-23
    • /
    • 2014
  • After being introduced, Building Information Modeling (BIM) has been actively applied to the cost estimation of construction projects, and various studies on BIM based quantity take-off have been carried out. In practice, however, these calculations take considerable time, because BIM based quantity take-off is further conducted along with 2D-based quantity take-off. Studies on the quantity take-off using BIM spatial objects have been carried out on early stages of projects, but how this method differs from the existing quantity take-off method and how accurate it is in comparison have rarely been verified. Therefore, by comparing 2D based quantities with quantities through BIM spatial objects, this study analyzed the accuracy of quantity take-off using BIM spatial objects. To this end, the properties of BIM spatial objects and quantity calculable spatial types were analyzed, and existing 2D-based quantities and quantities extracted from BIM spatial objects were compared through a case study. As a result, the quantity of spatial objects found to be more by about 7.13% in 0.05% and therefore, this difference should be considered during quantity take-off using BIM spatial objects. Through the results of this study, we can improve the accuracy of quantity take-off using BIM spatial objects in the early stage of a construction project.

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용 (Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume)

  • 정국영;우정원;강경돈;신재철
    • 한국BIM학회 논문집
    • /
    • 제3권3호
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

재생산 제품의 회수율을 고려한 최적 인센티브 및 총 주문량 결정 (Decision of optimal incentives and total order quantity with consideration of return rate of remanufacturing product)

  • 이용현;이철웅
    • 한국컴퓨터정보학회논문지
    • /
    • 제16권8호
    • /
    • pp.165-176
    • /
    • 2011
  • 본 연구에서는 재생산 기업의 회수 인센티브와 소매점에서의 회수 인센티브를 고려하여 최적 총 주문량과 이 두개의 최적 인센티브에 대한 결정을 연구한다. '회수율은 기업이 제공하는 인센티브와 밀접한 관련이 있다.'는 가정하에 이 회수율을 두 경로로 가는 각각의 함수로 표현하였다. 재고 모델로는 확정적인 EOQ(경제적 주문 수량)모델을 사용하여 기업의 최소 비용함수를 수식으로 표현하였다. 또한 이 모델을 가지고 볼록성(convexity)을 증명하여 기업이 수여하는 최적 인센티브와 소매점이 수여하는 최적 인센티브 그리고 총 주문수량(보충량)을 최적화하였다. 그리고 각각의 매개변수들을 민감도 분석하여 각각의 결정변수의 변화 추이를 살펴보면서 매개변수와의 관계를 알아보았다. 기업과 소매점은 비용을 감소시키기 위해 인센티브를 낮추려 한다. 하지만 이것은 회수량을 감소시켜 새로운 제품 생산량을 증가시킴으로 비용을 증가하게 한다. 이 논문은 국내외 재생산 기업이 이러한 상충관계(Trade off)를 고려하여 최적 인센티브와 최적 주문량을 결정하는데 있어 도움이 될 것으로 기대한다.

표제(標題)와 초록(抄錄)의 색인성(索引性)과 정보량(情報量) 분석(分析) (Indexability and Information Quantity Analysis in Title and Abstract)

  • 김재수;남영준
    • 정보관리연구
    • /
    • 제23권2호
    • /
    • pp.1-13
    • /
    • 1992
  • 본(木) 연구(硏究)에서는 자동색인(自動索引)의 색인어(索引語) 추출(抽出)에 있어 주요한 색인원(索引源)이 되는 표제(標題)와 초록(抄錄)등의 색인성을 비교 분석하였다. 결과는 표제만을 혹은 초록(抄錄)만을 색인원(索引源)으로 선정할 경우에 적절한 색인어(索引語)를 추출할 수가 없었으며, 표제(標題)와 초록(抄錄)을 동시에 색인원(索引源)으로 선정할 경우가 좀 더 적절한 색인어(索引語)를 확보할 수가 있었다.

  • PDF

개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구 (A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work)

  • 김인한;엄성곤;최중식
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

원칩 마이컴을 이용한 대용량 입력 인터페이스 시스템의 개발 (Development of a Large Quantity of Inputs Interface System Using a Single Chip microcontroller)

  • 박주태;최득성;정승현
    • 한국정보통신학회논문지
    • /
    • 제20권1호
    • /
    • pp.215-221
    • /
    • 2016
  • 본 논문은 대량의 입력 신호를 받아들이기에 부족한 수십 개의 입출력 포트를 가지는 저가의 8비트 원칩 마이크로 컨트롤러로 키패드 인터페이스 회로와 RS485통신을 이용하여 평면에 25mm의 간격으로 2차원적으로 균일하게 배치된 1600개의 대용량 스위치 입력 신호를 초당 10회의 실시간으로 PC로 읽어 들이고, 얻어진 스위치 정보의 물리적 패턴을 분석한 보행 분석실험의 실례를 들어 스텝분석이나 물리적인 입력의 패턴 분석이 필요한 각종 스포츠, 댄싱, 오락분야 혹은 대량의 스위치 및 센서 입력이 필요한 산업분야 등에 사용되어질 수 있음을 보이고자 한다.

임무 기반 드론의 최적성능 및 소요량 분석 방법론 연구 (The Study on analysis methodology of optimal performance and quantity for Mission-Based drones)

  • 하영석
    • 인터넷정보학회논문지
    • /
    • 제21권1호
    • /
    • pp.231-236
    • /
    • 2020
  • 본 논문은 드론 운영개념에 따라 체공시간, 총 운영시간, 적정 소요량 등 작전운용성능과 소요량의 과학적 검증이 필요하나, 이를 체계적으로 분석할 수 있는 방법론이 없어 본 연구를 수행하였다. 본 연구는 임무기반한 모의분석을 통한 검증 6단계의 분석 방법론 연구 및 제안을 통해 드론의 운용개념 기반의 최적 ROC와 소요량을 제시할 수 있으며, 그 결과 기술적, 경제적 효과를 제시 하였다.

Basic Research on BIM-Based Quantity Take-off Guidelines

  • Yun, Seokheon;Kim, Sangchul
    • Architectural research
    • /
    • 제15권2호
    • /
    • pp.103-109
    • /
    • 2013
  • Various types of building information should be linked to 3D model objects for their effective use by stakeholders. Because Building Information Modeling (BIM) based on 3D is used by different stakeholders, the created BIM need standard guidelines for each purpose, as, for example, for quantity take-off. Thus, this study was conducted to propose guidelines for BIM modeling for quantity take-off in the framework, especially, in the concrete and form. The proposed guidelines adopted each element of the BIM model based on an analysis of the problem of the general BIM model. Moreover, the usability and accuracy of the reinforced structure modeling guidelines were verified by comparing the quantity of the commercial estimation software and the modeling quantity using the proposed modeling guidelines.

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

국회도서관 전자도서관시스템에 대한 이용자의 기대와 만족에 대한 연구 (A Study of User′s Perspective and Satisfaction in National Assembly Library Electronic Library System)

  • 홍기철
    • 한국문헌정보학회지
    • /
    • 제36권2호
    • /
    • pp.265-284
    • /
    • 2002
  • 본 연구의 목적은 원문정보를 데이터베이스로 구축하여 이용자에게 제공하는 국회도서관의 전자도서관시스템에 대한 이용자들의 기대와 만족을 살펴보고, 이용자들의 기대와 만족에서 얼마나 차이를 나타내는가를 분석하고자 한 것이다. 설문지를 분석한 결과에 의하면 정보의 양, 정보의 최신성, 정보의 질, 분류의 체계성, 정보의 일관성, 정보의 정확성은 전체 기대수준의 평균보다 높게 나타나고, 응답의 속도 정보의 질, 정보의 일관성, 검색의 편리성, 정보의 양, 정보의 정확성은 전체 만족수준의 평균보다 높게 나타나고 있다. 분석대상요인 전체에서 정보의 최신성, 정보의 양, 정보의 다양성, 분류의 체계성, 정보의 정확성은 기대와 만족의 차이가 높은 편으로 나타나고 있다.