• 제목/요약/키워드: Information Management Architecture

검색결과 1,939건 처리시간 0.029초

분산객체와 XML 기반의 생산계획 컴포넌트 개발에 관한 연구 (A Study on Software Component Development for Production Management Using Distributed Objects and XML Technologies)

  • 민대기;장태우;박찬권;박진우
    • 산업공학
    • /
    • 제15권1호
    • /
    • pp.10-19
    • /
    • 2002
  • New trends such as electronic commerce, virtual organizations, e-business applications, etc. increase the dependence of production management on information software systems and contribute to the needs for global, distributed object systems. This paper presents a component based approach for production management systems under the multi-tier distributed information system architecture using UML(Unified Modeling Language), CORBA(Common Object Request Broker Architecture) and XML(eXtensible Markup Language) technologies, and propose rules for mapping a UML class diagram to a XML DTD (Document Type Definition). And we adapt it to the prototype system implementation. The components are implemented by CORBA and we use XML messages for the information exchange between components.

AN ONTOLOGY SCHEME FOR DISCRIMINATING CONSTRUCTION IETM FROM EXISTING INFORMATION SYSTEMS

  • Jeong, Jinwook;Park, Moonseo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.942-948
    • /
    • 2009
  • Today's construction is a large-scale and long life span program, so called Mega-scale project, that every moment constructor faces much of hardships, It is because of a large amount of stakeholders, data and complicated relationship among workers. In order to overcome these problems, IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it is similar to existing IT-based information systems, the PMIS(Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to find out IETM's property and to present the Ontology scheme discriminating Construction IETM from existing systems..

  • PDF

전사적 아키텍처 기획(EAP)을 통한 IT 아키텍처의 구축 - 정보시스템 기획(ISP)의 새로운 패러다임 - (Development of IT Architecture through Enterprise Architecture Planning - New Paradigm of Information Systems Planning -)

  • 장시영;신동익;이정섭
    • Asia pacific journal of information systems
    • /
    • 제11권2호
    • /
    • pp.159-180
    • /
    • 2001
  • Despite the large and ongoing investments in information systems and technologies, many organizations still suffer from the lack of integration and interoperability of multiple information systems, In order to deal with these enduring problems, a number of government organizations and corporate firms in the United States have developed and maintained IT architectures through enterprise architecture planning. An IT architecture is a decision-making framework for IT planners and developers, establishing guidelines for the individual IT resource owners and users. It provides guidance to those involved in building and maintaining IT systems and infrastructure. Enterprise architecture planning represents a new paradigm of information systems planning in that it addresses the long-term view of the enterprise organization from top-level principles to detailed technology architectures. This paper explores a couple of cases in the successful implementation of IT architectures in both public and private sectors, and proposes a step-by-step methodology for building an effective IT architecture.

  • PDF

Performance Measurement and Analysis of Intranet using DPE-based Performance Management System

  • Kim, Seoung-Woo;Kim, Chul;Shin, Jae-Kwang;Kim, Young-Tak
    • 한국통신학회논문지
    • /
    • 제27권4C호
    • /
    • pp.282-294
    • /
    • 2002
  • The modern telecommunication networks are composed of various network-type and are managed by various management technologies, such as TMN, SNMP, TINA etc. Furthermore, the network user's needs of real-time multimedia services are rapidly increasing. In order to guarantee the user-requested quality-of-service(QoS) and keep the network utilization at maximum, it is required to manage the network performance continuously after the network is deployed. The performance management function should provide the useful information for the network expansion and the capacity reallocation in the future. In this paper, we propose a DPE-based performance management architecture for the integrated management of the heterogeneous network elements with TMN and SNMP. We propose an approach to provide the Intranet traffic monitoring and analysis function using layered network management concept and distributed processing technology. The proposed architecture has been designed and implemented based on multiprocess and multithread structure to support concurrent processing. To manage the traffic according to the Intranet service categories, we implemented an ITMA(Intelligent Traffic Monitoring Agent) with packet capture library. With the proposed architecture, we could measure and analyze the real Intranet traffic of Yeungnam University.

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

인스턴트 메시징 기반 확장성있는 홈오토메이션 시스템 아키텍처 (Architectures of an Extensible Home Automation System Based on Instant Messaging)

  • 최종명;정재진
    • 디지털산업정보학회논문지
    • /
    • 제5권4호
    • /
    • pp.27-37
    • /
    • 2009
  • This paper is about the architectures of an extensible and scalable home automation system which is based on instant messaging. The extensibility is the most important feature of the system because there are very diverse appliances at home and they can be added or replaced with other products frequently. For the extensibility, we propose façade architecture for communication, distributed agent architecture for the system, layered architecture for agents, and bridge architecture for wrapping existing facilities. Using these architectures, we reduce the system complexity and get the extensibility to add new products with least cost. Furthermore, we also introduce our prototype system and show that it is extensible.

BIM기반 건설공사 일정관리를 위한 정보에 관한 연구 (A study on the Information for the Schedule Management of the Construction based BIM)

  • 박소현;송정화;오건수
    • 디지털콘텐츠학회 논문지
    • /
    • 제16권4호
    • /
    • pp.555-564
    • /
    • 2015
  • 최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.

CW-MAN : 효율적인 멀티미디어 공동저작을 위한 혼합형 구조의 공동저작 관리 시스템 (CW-MAN : The Cooperative-Work Management System with Hybrid Architecture for Efficient Multimedia Collaboration)

  • 이광행;전재우;오삼권
    • 한국정보처리학회논문지
    • /
    • 제6권5호
    • /
    • pp.1253-1262
    • /
    • 1999
  • For the efficient co-authoring of multimedia documents in a distributed systems environment, the cooperative-work management systems that can not only allow the sharing of distributed resources but also facilitate the authors' interaction, are needed. In this paper, we present a cooperative-work management system with hybrid architecture, called CW-MAN, in which the information on shared objects and co-authoring management is stored in a dedicated computer system but the shared objects distributed all over the local computer systems. The main management functions provided by the CW-MAN are those for shared objects, session, and telepointing. The shared-object use them exclusively. The session managements allows authors to dynamically create, update, and destroy sessions. Lastly, the telepointing management allows local pointing events to be synchronously presented to remote systems.

  • PDF

ITA 기반의 전자상거래 아키텍처 프레임워크 (An e-Business Architecture Framework using Information Technology Architecture)

  • 김덕현
    • 경영정보학연구
    • /
    • 제4권2호
    • /
    • pp.41-58
    • /
    • 2002
  • 본 논문은 최근 관심이 증대되고 있는 '정보기술 아키텍처'를 국가차원의 전자상거래 아키텍처 프레임워크 설정에 적용해 본 것이다. 저자는 기존 정보기술 아키텍처 프레임워크 즉,자크만 프레임워크, C4ISR 아키텍처 프레임워크, 미국 연방정부 아키텍처 프레임워크 등을 확장한 VMT 프레임워크를 제시 하였다. VMT는 전자상거래를 3개의 축, 즉 관점(기획/계획, 시스템 분석, 설계, 구현 등), 대상(데이터, 기능, 네트워크, 행위자, 사건, 망침) 기간(단기, 중기, 장기)에 따라 정의할 수 있는 개념적 틀로서 전자상거래 관련 이해 당사자들은 이를 통해 전자상거래에 대해 보다 포괄적인 이해와 접근을 할 수 있을 것으로 판단된다.