Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

A Study on Improving Effect Analysis of the revitalization project for old Industrial Complexes (노후산업단지 재생사업 효과분석 개선 연구)

  • Kim, Nam Ju
    • Land and Housing Review
    • /
    • v.11 no.1
    • /
    • pp.11-19
    • /
    • 2020
  • This paper proposed an effect analysis method that meets the characteristics and purposes of the revitalization project for old industrial complexes, and quantified the economical effects about the project in Jeollabuk-do by case analysis. The problems on the existing effect analysis about revitalization project for old industrial complexes, estimated as transportation benefits on the main entrance roads plan and the increased rent benefits on the internal roads and other plans, were examined. In addition, the land use plan ratio on the old industrial complexes compared to the averages, and the surveys to the residential company were conducted. And this paper finally proposed an effect analysis methodology for the revitalization project for old Industrial Complexes in consideration of the increase in the operation rate and the added values through the conversion to high value-added industrial sectors. It was analyzed that new value added of KRW 743,278 million can be generated for next 30 years when the revitalization project for old Industrial Complexes in Jeollabuk-do is implemented.

Minimizing Project Quality Costs by Activity-Based Prevention (활동기준예방에 의한 프로젝트 품질코스트 최소화)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.4
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

Project Management : Simplifying or Exacerbating (프로젝트를 위한 프로젝트 관리의 역할)

  • Qureshi, Sheheryar Mohsin;Kang, Chang Wook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.9-18
    • /
    • 2014
  • The purpose of this research is to initiate discussion to simplify existing tools and methods for managing projects which make project management a harder job to perform and a tougher task to handle. Additionally, summarizing the definitions of "project" that have been found from reviewing the relevant literature, it deliberates on revising the duties and responsibilities of project manager and proposes performance expectancy triangle explaining a relationship among accountability, responsibility and authority - the Tri-butes. It sheds light on several factors critical to the success of projects. Finally, we propose a function indicating that customer demands or desires greatly affect project complexity.

Project Schedule Risk Assessment Based on Bayesian Nets (베이지안넷 기반의 프로젝트 일정리스크 평가)

  • Sung, Hongsuk;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.9-16
    • /
    • 2016
  • The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

Prediction and Evaluation of Schedule Exceptions on the EPC Projects of Overseas Plants (플랜트 프로젝트 일정위험 예외상황 예측 및 평가)

  • Sung, Hongsuk;Jung, Jong-yun;Park, Chulsoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.72-80
    • /
    • 2016
  • The market size of plant projects in overseas is so large that domestic EPC project contractors are actively seeking the overseas projects and then trying to meet completion plans since successful fulfillment of these projects can provide great opportunities for them to expand into new foreign markets. International EPC projects involve all of the uncertainties common to domestic projects as well as uncertainties specific to foreign projects including marine transportation, customs, regulations, nationality, culture and so on. When overseas project gets off-schedule, the resulting uncertainty may trigger unexpected exceptions and then critical effects to the project performance. It usually require much more time and costs to encounter these exceptions in foreign sites compared to domestic project sites. Therefore, an exception handling approach is required to manage exceptions effectively for successful project progress in foreign project sites. In this research, we proposed a methodology for prediction and evaluation of exceptions caused by risks in international EPC projects based on sensitivity analysis and Bayesian Networks. First, we identified project schedule risks and related exceptions, which may meet during the fulfillment of foreign EPC projects that is performed in a sequence of engineering, procurement, preparatory manufacture, foreign shipping, construction, inspection and modification activities, and affect project performance, using literature review and expert interviews. The impact of exceptions to the schedule delay were also identified. Second, we proposed a methodology to predict the occurrence of exceptions caused by project risks and evaluate them. Using sensitivity analysis, we can identify activities that critically affect schedule delay and need to focus by priority. Then, we use Bayesian Networks to predict and evaluate exceptions. Third, we applied the proposed methodology to an international EPC project example to validate the proposed approach. Finally, we concluded the research with the further research topics. We expect that the proposed approach can be extended to apply in exception management in project management.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A Case Study of Champion Project to Maximize Cost Reduction (챔피언 프로젝트를 통한 원가절감 극대화 사례 연구)

  • Lee, Wook-Gee;Kim, Joo-Wan;Kim, Pan-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.4
    • /
    • pp.1-12
    • /
    • 2007
  • Motorola developed the framework of six sigma in 1987. In these days, many companies adapt this powerful tool. In 1996, six sigma was introduced to the Korean companies as a management innovation tool. This study shows case study of 'Champion Project' which was adopted on one Korean company. The champion project is directed by the leader who has a champion belt. The project focus on the processes optimization problem or resource concentration problem to solve critical issues inside of the process. This case study shows the result of champion project. The effect was encouraging in the aspect of effectiveness and efficiency. The most important point of this study is an introduction of the third generation six sigma which was successively adopted on the Korean company.