• 제목/요약/키워드: In-situ survey

검색결과 147건 처리시간 0.031초

마이크로네시아 웨노섬 연안 서식지 분포의 현장조사와 위성영상 분석법 비교 (Comparison between in situ Survey and Satellite Imagery with Regard to Coastal Habitat Distribution Patterns in Weno, Micronesia)

  • 김태훈;최영웅;최종국;권문상;박흥식
    • Ocean and Polar Research
    • /
    • 제35권4호
    • /
    • pp.395-405
    • /
    • 2013
  • The aim of this study is to suggest an optimal survey method for coastal habitat monitoring around Weno Island in Chuuk Atoll, Federated States of Micronesia (FSM). This study was carried out to compare and analyze differences between in situ survey (PHOTS) and high spatial satellite imagery (Worldview-2) with regard to the coastal habitat distribution patterns of Weno Island. The in situ field data showed the following coverage of habitat types: sand 42.4%, seagrass 26.1%, algae 14.9%, rubble 8.9%, hard coral 3.5%, soft coral 2.6%, dead coral 1.5%, others 0.1%. The satellite imagery showed the following coverage of habitat types: sand 26.5%, seagrass 23.3%, sand + seagrass 12.3%, coral 18.1%, rubble 19.0%, rock 0.8% (Accuracy 65.2%). According to the visual interpretation of the habitat map by in situ survey, seagrass, sand, coral and rubble distribution were misaligned compared with the satellite imagery. While, the satellite imagery appear to be a plausible results to identify habitat types, it could not classify habitat types under one pixel in images, which in turn overestimated coral and rubble coverage, underestimated algae and sand. The differences appear to arise primarily because of habitat classification scheme, sampling scale and remote sensing reflectance. The implication of these results is that satellite imagery analysis needs to incorporate in situ survey data to accurately identify habitat. We suggest that satellite imagery must correspond with in situ survey in habitat classification and sampling scale. Subsequently habitat sub-segmentation based on the in situ survey data should be applied to satellite imagery.

선조사 결과에 의한 실제낙석무게분포의 추정과 설계적용성 검토 (Estimation In-Situ Rockfall Block Weight Distribution Using Scan-Line Survey Results and Examination its applicability in Practical Rockfall Analysis)

  • 김수철;김동휘;정혁일;김석기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.639-648
    • /
    • 2005
  • Up to now, practical engineers applying simplicity value of rockfall block weight suggested in design manual without considering in-situ rockfall block weight which reflect joint characteristics. However, the size of rockfall block varies with joint spacing of discontinuities and influences over rockfall analysis results. In this paper, we estimate realistic rockfall block weight distribution using statistical invariances of joint spacing derived from scan-line survey result. And, we study whether this distribution is applicable in practical rockfall analysis directly. As the results of this study, rockfall analysis results that using rockfall block weight distribution estimated from scan-line survey show resonable and realistic outcomes.

  • PDF

Application of In Situ Measurement for Site Remediation and Final Status Survey of Decommissioning KRR Site

  • Hong, Sang Bum;Nam, Jong Soo;Choi, Yong Suk;Seo, Bum Kyoung;Moon, Jei Kwon
    • Journal of Radiation Protection and Research
    • /
    • 제41권2호
    • /
    • pp.173-178
    • /
    • 2016
  • Background: In situ gamma spectrometry has been used to measure environmental radiation, assumptions are usually made about the depth distribution of the radionuclides of interest in the soil. The main limitation of in situ gamma spectrometry lies in determining the depth distribution of radionuclides. The objective of this study is to develop a method for subsurface characterization by in situ measurement. Materials and Methods: The peak to valley method based on the ratio of counting rate between the photoelectric peak and Compton region was applied to identify the depth distribution. The peak to valley method could be applied to establish the relation between the spectrally derived coefficients (Q) with relaxation mass per unit area (${\beta}$) for various depth distribution in soil. The in situ measurement results were verified by MCNP simulation and calculated correlation equation. In order to compare the depth distributions and contamination levels in decommissioning KRR site, in situ measurement and sampling results were compared. Results and Discussion: The in situ measurement results and MCNP simulation results show a good correlation for laboratory measurement. The simulation relationship between Q and source burial for the source layers have exponential relationship for a variety depth distributions. We applied the peak to valley method to contaminated decommissioning KRR site to determine a depth distribution and initial activity without sampling. The observed results has a good correlation, relative error between in situ measurement with sampling result is around 7% for depth distribution and 4% for initial activity. Conclusion: In this study, the vertical activity distribution and initial activity of $^{137}Cs$ could be identifying directly through in situ measurement. Therefore, the peak to valley method demonstrated good potential for assessment of the residual radioactivity for site remediation in decommissioning and contaminated site.

LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구 (Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF

해상누유 현장소각 기술에 대한 소고 (A Note on in-Situ Burning of Marine Oil Spills)

  • 성홍근
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제3권3호
    • /
    • pp.58-65
    • /
    • 2000
  • 해상 누유사고시의 방제대책은 오일펜스와 스키머를 사용하는 기계적 방법과 유화제를 사용하는 화학적 방법 그리고 현장에서 누출유를 소각하는 현장소각 방법으로 대별된다. 본 논고는 최근에 들어 관심이 집중되고 있는 해상누유 현장소각 기술에 대한 문헌 조사를 기초로 하여 작성된 것으로써, 해상누유 현장소각 기술의 특징, 역산, 현황, 장단점 그리고 실험적 연구 및 향후 적용가능성 등에 대하여 간략히 기술하였다.

  • PDF

암반 분류 기초 물성조사 (Basic properties survey report on the rock classification)

  • 허진
    • 화약ㆍ발파
    • /
    • 제9권3호
    • /
    • pp.10-16
    • /
    • 1991
  • On the ground foundation works for Bldg site, Rock classification test can be obtained as follows due to the International Society for Rock Mechanics. 1. In-situ test : Compressive strength, Point load test. 2. In-situ test Schmidt hammer test. Burden test finaly the convinient co-relation table between strength and 5. H, test were carried out for site-engineer, This project is one of contineous works regarding to Burden test from Jack leg drill($\phi{\;}75mm$) use.

  • PDF

CONDUCTIVITIES OF SEA-BOTTOM SEDIMENTS

  • HoWoongShon
    • 지구물리
    • /
    • 제6권2호
    • /
    • pp.79-87
    • /
    • 2003
  • An in-situ four-electrode contact resistivity probe system was designed, and field-tested in submarine sediments. Seismic survey was also performed to support and compare the results of electric survey. The probe was designed to be driven to selected depths below the seafloor using a Vibracore system. The four insulated electrodes were, spaced equidistant across the wedge, were extended beyond the probe tip to minimize effects of sediment disturbance by the wedge insertion. In-situ measurements of resistivity were recorded on board by precision electronic equipment consisting of signal generators and processors, and by temperature- monitoring systems. Overall limits of uncertainty at respective depths below the seafloor are up to ±10% of the measured values. Best estimates of conductivity are considered to be ±3 percent of the reported values. Resistivity measurements were made at six sites in carbonate sediments to a maximum depth of penetration of about 5 m. Average values of conductivity range between 0.88 and 1.21 mho/m. The results show the seabed is composed of alternating layers of relatively high-conductivity material (0.8 to 1.4 mho/m) in thicknesses of more or less one meter and layers about 30 cm thick having relatively low conductivities (0.4 to 0.8 mho/m).

  • PDF

토석류 재해 위험성 평가 방법의 비교 분석 (Comparative Analysis on Methods for Evaluating Vulnerability of Debris Flow Hazard)

  • 조정하;황희석;유남재
    • 산업기술연구
    • /
    • 제36권
    • /
    • pp.49-55
    • /
    • 2016
  • Different criteria for evaluating vulnerability of debris flow hazard proposed by various institutes such as Korea Forest Service(KFS), Korea Institute of Geoscience and Mineral Resources(KIGAM), Ministry of Public Safety and Security (MPSS) and Korea Expressway Corporation (KEC) were reviewed and discussed. Assessment of debris flow hazard for natural slopes around land for house development was carried out on the basis of the report about results of performing in-situ survey. Results of evaluating vulnerability of debris flow hazard by using these methods were compared to each other to discuss appropriateness of their evaluation and to recommend improvement.

  • PDF

현장직접전단시험기의 개발 및 현장적용에 관한 연구 (Development of an In Situ Direct Shear Test Apparatus and Its Field Application)

  • 김용필;이영균;이성국;엄정기
    • 터널과지하공간
    • /
    • 제21권3호
    • /
    • pp.181-191
    • /
    • 2011
  • 단층대, 파쇄대 또는 풍화대가 발달한 암반은 실내시험을 위한 시료 성형이 어렵다. 기존에 현장에서 수행된 직접전단시험은 갱도 내벽의 수직반력을 이용하여 수행되었다. 이 연구에서 개발된 현장직접전단시험기는 터널내부 또는 노천의 현장상태 암반에서 시험을 수행할 수 있다. 현장직접전단시험기의 주요 구성은 전단하중 반력판 및 하중전달판, 유압실린더 시스템, 로드셀, 다단계 전단상자, 전단상자 고정장치, 수직하중 반력판 및 하중전달판, 마찰저항 감소용 롤러 등이다. 공시체는 각주형의 블록으로 최대 크기는 $400{\times}400{\times}460$ mm이며 현장에서 형성하는 방법 및 절차가 제시되었다. 개발된 시험기의 현장적용성 평가를 위하여 연구지역에 대한 지질공학적 조사 분석 연구를 통하여 성능시험을 위한 공시체 형성에 적합한 위치가 선정되었다. 현장적용 결과 개발된 현장용 시험기는 암석의 강도 및 변형과 관련하여 필요한 대부분의 정보를 제공할 수 있는 성능을 확보하였음을 확인하였다.