• Title/Summary/Keyword: In-house power system

Search Result 216, Processing Time 0.024 seconds

Auxiliary Power Interface Design for Power Control and Distribution Unit (전력조절분배기의 보조전원 설계)

  • Park, Sung-Woo;Jang, Jin-Beak;Park, Hee-Sung;Yoon, Hee-Kwang
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.239-242
    • /
    • 2009
  • Power Control and Distribution Unit (PCDU) plays roles of power generation control for solar array panel, power storage control for battery system, power conversion for unregulated and regulated primary bus and power distribution to bus and payload system. The selection and design of the proper auxiliary power interface for PCDU depending on various mission is one of the most important step for electrical power subsystem design. In this paper, the general design approach of auxiliary power interface for PCDU which can be used for small-sized LEO satellites application is given. And, the auxiliary power design concept for always alived modules such as solar array regulator and house keeping module is also suggested.

  • PDF

Performance Simulation of Ground-Coupled Heat Pump(GCHP) System for a Detached House (단독주택 적용 지열 히트펌프 시스템의 성능 분석)

  • Sohn, Byong-Hu;Choi, Jong-Min;Choi, Hang-Seok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.6
    • /
    • pp.392-399
    • /
    • 2011
  • Ground-coupled heat pump(GCHP) systems have been shown to be an environmentally-friendly, efficient alternative to traditional cooling and heating systems in both residential and commercial applications. Although some work related to performance evaluation of GCHP systems for commercial buildings has been done, relatively little has been reported on the residential applications. The aim of this study is to evaluate the cooling and heating performances of a vertical GCHP system applied to an artificial detached house($117\;m^2$) in Seoul. For this purpose, a typical design procedure was involved with a combination of design parameters such as building loads, heat pump capacity, borehole diameter, and ground thermal properties, etc. The cooling and heating performance simulation of the system was conducted with different prediction times of 8760 hours and 240 months. The performance characteristics including seasonal system COP, average annual power consumption, and temperature variations related to ground heat exchanger were calculated and compared.

Investgating Effects of Peak Load of Korean Power System from Electric Heating appliances except House (비주택용 전기난방기구가 우리나라 첨두부하에 미치는 영향 검토)

  • Kim, Yong-Ha;Lee, Kwang-Sung;Heo, Dong-Ryeul;Lee, Sung-Jun;Lee, Yong-Suk;Woo, Sung-Min;Son, Seung-Kee
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.442-447
    • /
    • 2006
  • This paper investigates the shadow amount of edifice and according to time zone used by its Electric heating appliances, it is analyzed that Electric Heating Power Load affects Heal power load variation curve. Also, in case that the far infrared ray heating system, which are used as new electric heating system, occupies some of the existing Electric heating appliances, it is analyzed that the Electric heating power load affects the Peak load power in Korea.

  • PDF

A Study of Load Matching on the Net-Zero Energy House (넷 제로에너지주택의 부하매칭에 관한 연구)

  • Kim, Beob-Jeon;Lim, Hee-Won;Kim, Deok-Sung;Shin, U-Cheul
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.4
    • /
    • pp.55-66
    • /
    • 2018
  • nZEH (net-Zero Energy House) is defined as a self-sufficient energy building where the sum of energy output generated from new & renewable energy system and annual energy consumption is zero. The electricity generated by new & renewable energy system with the form of distributed generation is preferentially supplied to electrical demand, and surplus electricity is transmitted back to grid. Due to the recent expansion of houses with photovoltaic system and the nZEH mandatory by 2025, the rapid increase of distributed generation is expected. Which means, we must prepare for an electricity-power accident and stable electricity supply. Also electricity charges have to be reduce and the grid-connected should be operated efficiently. The introduction of ESS is suggested as a solution, so the analysis of the load matching and grid interaction is required to optimize ESS design. This study analyzed the load matching and grid interaction by expected consumption behavior using actual data measured in one-minute intervals. The experiment was conducted in three nZEH with photovoltaic system, called all-electric houses. LCF (Load Cover Factor), SCF (Supply Cover Factor) and $f_{grid}$ (Grid Interaction Index) were evaluated as an analysis indicator. As a result, LCF, SCF and $f_{grid}$ of A house were 0.25, 0.23 and 0.27 respectively; That of B house were 0.23, 0.23, 0.19, and that of C were 0.20, 0.19, 0.27 respectively.

Radioactive Waste Integrated Management System (방사성폐기물 통합 관리 시스템)

  • 송덕용;최성수;한병섭
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.572-578
    • /
    • 2003
  • In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication.

  • PDF

Digital DC power supply for light accelerator

  • Kim, Yoon-Sik
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.8
    • /
    • pp.1000-1003
    • /
    • 2014
  • There are 70 vertical and 70 horizontal correctors for Pohang Light Source. Until mid of 2000, power supplies for these correctors were based on 1990's technology, so the global orbit feedback system was not possible with poor 12 bit resolution. A new task force team was assembled to develop new power supplies with BESSY type DAC cards. After the project, two vertical correctors in each lattice were connected with new power supplies, and the global orbit feedback was available within the accuracy of 5 microns. However, this replacement was not enough to satisfy the beam stability requirement of 2 microns for PLS. We have launched another power supply design based on all digital technology. This attempt was completed within a year, and 80 units were assembled in house. Currently, the global orbit feedback system is running successfully with new digital power supplies and the compensation of chamber motion due to the thermal load by using digital displacement transducers attached on each BPMs.

Heating and Cooling Performance Analysis of Ground Source Heat Pump System in Low Energy House (저에너지주택의 지열히트펌프시스템 냉·난방 성능분석)

  • Baek, Namchoon;Kim, Sungbum;Shin, Ucheul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.10
    • /
    • pp.387-393
    • /
    • 2016
  • A ground source heat pump system maintains a constant efficiency due to its stable heat source and radiant heat temperature which provide a more effective thermal performance than that of the air source heat pump system. As an eco-friendly renewable energy source, it can reduce electric power and carbon dioxide. In this study, we analyzed one year of data from a web based remote monitoring system to estimate the thermal performance of GSHP with the capacity of 3RT, which is installed in a low energy house located in Daejeon, Korea. This GSHP system is a hybrid system connected to a solar hot water system. Cold and hot water stored in a buffer tank is supplied to six ceiling cassette type fan coil units and a floor panel heating system installed in each room. The results are as follows. First, the GSHP system was operated for ten minutes intermittently in summer in order to decrease the heat load caused by super-insulation. Second, the energy consumption in winter where the system was operated throughout the entire day was 7.5 times higher than that in summer. Moreover, the annual COP of the heating and cooling system was 4.1 in summer and 4.2 in winter, showing little difference. Third, the outlet temperature of the ground heat exchanger in winter decreased from $13^{\circ}C$ in November to $9^{\circ}C$ in February, while that in summer increased from $14^{\circ}C$ to $17^{\circ}C$ showing that the temperature change in winter is greater than that in summer.

Thermal Management Study of PEMFC for Residential Power Generation (가정용 연료전지 시스템의 열관리 해석)

  • Yu, Sang-Seok;Lee, Young-Duk;Ahn, Kook-Young
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2839-2844
    • /
    • 2008
  • A PEMFC(proton exchange membrane fuel cell) is a good candidate for residential power generation to be cope with the shortage of fossil fuel and green house gas emission. The attractive benefit of the PEMFC is to produce electric power as well as hot water for home usage. Typically, thermal management of vehicular PEMFC is to reject the heat from the PEMFC to the ambient air. Different from that, the thermal management of PEMFC for RPG is to utilize the heat of PEMFC so that the PEMFC can be operated at its optimal efficiency. In this study, dynamic thermal management system is modeled to understand the response of the thermal management system during dynamic operation. The thermal management system of PEMFC for RPGFC is composed of two cooling circuits, one for controling the fuel cell temperature and the other for heating up the water for home usage. Dynamic responses and operating strategies of the PEMFC system are investigated during load changes.

  • PDF

A Study on the Implementation of 9.6Kbps Power Line Communication System for Smart Home (스마트 홈용 9.6Kbps급 전력선 통신 시스템 구현에 관한 연구)

  • Kim, Chul;Jeong, Young-Hwa
    • The Journal of Information Technology
    • /
    • v.6 no.4
    • /
    • pp.81-91
    • /
    • 2003
  • This paper is concerned with the implementation of power line communication system with 9.6Kbps. This system is suitable to establish the smart home using the power line having been installed in house. In the suggested power line communication system, we use the chirp signal with a linearity and spread spectrum frequency band of 100KHz~200KHz. We had the performance experiment for the implementation system. The experiment was achieved in the pseudo load network similar to real circumstance of power line communication. As the result, the communications under the circumstance were accomplished satisfactorily. We confirmed that the suggested 9.6Kbps power line communication system with the Chirped-SS method had the performance enough to commercialize the smart home.

  • PDF

Assessment of Wind Power Resources for Rural Green-village Planning (농촌 그린빌리지 계획을 위한 풍력에너지 자원분석)

  • Nam, Sang-Woon;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.2
    • /
    • pp.25-32
    • /
    • 2008
  • Wind energy, which is one of renewable energy, would be useful resources that can be applied to making energy recycling villages without using fossil fuels. This study analyzed energy potential on wind power considering weather condition in three rural villages and compared with energy consumption surveyed. A wind turbine system in the 5kW class can generate 26.1%, 73.9% and 39.5% of the yearly mean consumption of electric power per house in Makhyun, Boojang and Soso respectively. A 750kW wind turbine system can generate 1.7%, 30.3% and 22.1% of the total amount of electric power consumption in three study villages respectively. Wind power energy density was too low in Makhyun and Soso, so it is determined that the application of wind turbine system is almost impossible. Wind energy potential was generally low in Boojang either, but it is evaluated that there is a little possibility of wind power generation relatively. For practical application of renewable energy to rural green-village planning, assessment of energy potential for the local area should be preceded.