• Title/Summary/Keyword: Improvement of Planning and Monitoring

Search Result 71, Processing Time 0.02 seconds

The Study on Elaboration and Applications of the Urban Regeneration Monitoring Indicators - Based on Foreign Cases - (도시재생사업 모니터링 지표 구축 및 적용 방안 연구 - 해외 도시재생 모니터링 지표 고찰을 중심으로 -)

  • Choi, Min-Ah;Choi, Ji-In;Yang, Dong-Suk
    • KIEAE Journal
    • /
    • v.13 no.3
    • /
    • pp.51-60
    • /
    • 2013
  • The necessity of urban regeneration is recently increasing because of the deterioration existing urban area and the slowdown of new development operations. The urban regeneration is differentiated from other private operations by its public characters, which is the basis of public support. This character demands verification of the adequacy for public finance support by monitoring urban regeneration planning and operation. Therefore, this study aims to show the monitoring indicators and its application in legal system for urban regeneration through the examination of foreign countries cases. London, San Francisco, and France urbanism regulation and planning system show the measure for introducing urban regeneration monitoring system into korean urbanism institution. This study is significant by suggesting the circulation structure of urban regeneration by linking planning, operations and monitoring phases. The monitoring system permits improvement of urban regeneration by clarifying objects and ameliorating efficiency by continuos observation and application of its evaluation.

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Educational Program Evaluation System in a Medical School (일개 의과대학 교육프로그램 평가체제에 대한 연구)

  • Yune, So-Jung;Lee, Sang-Yeoup;Im, Sunju
    • Korean Medical Education Review
    • /
    • v.22 no.2
    • /
    • pp.131-142
    • /
    • 2020
  • A systematic educational program evaluation system for continuous quality improvement in undergraduate medical education is essential. Monitoring and evaluation (M&E) are two distinct but complementary processes referred to in an evaluation system that emphasizes formative purpose. Monitoring involves regular data collection for tracking process and results, while evaluation requires periodic judgment for improvement. We have recently completed implementing an educational evaluation using the M&E concept in a medical school. The evaluation system consists of two loops, one at the lesson/course level and the other at the phase/graduation level. We conducted evaluation activities in four stages: planning, monitoring, evaluation, and improvement. In the planning phase, we clarified the purpose of evaluation, formulated a plan to engage stakeholders, determined evaluation criteria and indicators, and developed an evaluation plan. Next, during the monitoring phase, we developed evaluation instruments and methods and then collected data. In the evaluation phase, we analyzed results and evaluated the criteria of the two loops. Finally, we reviewed the evaluation results with stakeholders to make improvements. We have recognized several problems including excessive burden, lack of expertise, insufficient consideration of stakeholders' evaluation questions, and inefficient data collection. We need to share the value of evaluation and build a system gradually.

Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 문제점 분석 및 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Power Quality Monitoring System with a New Distributed Monitoring Structure

  • Won, Dong-Jun;Chung, Il-Yop;Kim, Joong-Moon;Ahn, Seon-Ju;Moon, Seung-Il;Seo, Jang-Cheol;Choe, Jong-Woong
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.4
    • /
    • pp.214-220
    • /
    • 2004
  • Power quality monitoring is the cornerstone for power quality analysis, diagnosis and improvement. The measurement of power quality (PQ) evolves from instantaneous metering to continuous monitoring. Furthermore, recent technologies enable us to construct more flexible, reliable, rapid and economical power quality monitoring system (PQMS). Therefore, this paper presents an improved PQMS with a new distributed monitoring structure. The proposed PQMS consists of a PQ meter, PQ analyzer and GUI. The PQ meter only collects raw data and the PQ analyzer performs power quality analysis. It has several advantages compared to conventional structures in economic efficiency, modularity, speed, etc. PQ monitoring algorithms to catch steady-state trends and to detect PQ events are also adapted to the proposed structure. Using the proposed structure and monitoring algorithm, a prototype PQMS is constructed and real-time testing is performed.

A Study on the Importance of Works Perceived by Quality Improvement Coordinators and Their Current Work Performances (질 관리 실무자가 인지하는 업무중요도와 수행업무에 관한 연구)

  • Kim, Young Ju
    • Quality Improvement in Health Care
    • /
    • v.5 no.2
    • /
    • pp.224-237
    • /
    • 1998
  • Background : This is an investigative study to analyse the importance of works perceived by Quality Improvement(QI) Coordinators and to evaluate their current work performances using the questionnaires developed by the investigator. Methods : The data were collected from 37 subjects over two weeks period from Oct. 1 to Oct. 17, 1998 and analysed by the descriptive statistics of SPSS program. The items of questionnaire are consisted of 13 work domains including 73 activities based on Quality Management(QM) Coordinator's job description of National Association for Healthcare Quality:data collection & analysis, communication, monitoring, evaluation, accreditation, tool development, policy development, program development, self development, education & trainning, system design, planning, and consultation & support. Results : 1) Of the performances in 13 work domains, the frequencies of the work performed were accreditation(89%), planning(88%), communication(83%), data collection & analysis(82%), monitoring(76%), policy development(72%), consultation & support (71%), education & trainning(70%), self development(68%), evaluation(63%), tool development(61%), program development(44%) and system design(43%) in order. 2) For the importances (1=not important, 5=very important), the policy development(4.46) scored highest then monitoring(4.42), planning(4.41), education & trainning(4.38), communication(4.35), evaluation(4.34) tool development (4.30), data collection & analysis(4.29), program development(4.22), consultation & support(4.22), accreditation(4.15), self development(4.05) and system design(3.98) in order. 3) There was a difference between the work performance and the perceived importance. The results showed the low performances in policy development, monitoring, education & trainning and evaluation which ranked high by the perceived importance and the high performances in accreditation, data collection & analysis, self development, communication and consultation & support which ranked middle to low by the perceived importance. 4) The reasons for low performances of QI Coordinators were the lack of clear assignment for the responsibility and allowed authority for work to QI Coordinators(30.8%), insufficient member of QI Coordinators(13.9%), lack of hospital director's interest(11.5%), low motivation of QI Coordinators (10.6%) and insufficient knowledge & experience of QI Coordinators (8.8%). Conclusion : Most works were perceived important by QI Coordinators, but there was a difference in the work performance. The works performed over 70% were related with accreditation, data collection & analysis, communication, planning and monitoring, on the other hand under 50% in performances were related with system design, program development, tool development and evaluation.

  • PDF

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Framework of Watershed Management Organization Consortium for Water Environment Improvement of Small Rural Watershed (농촌 소유역 수환경 개선을 위한 유역관리 협의체 구성방안 - 함평천 사례를 중심으로 -)

  • Lee, Ki-Wan;Kim, Young-Joo;Yoon, Kwang-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.11 no.4 s.29
    • /
    • pp.59-65
    • /
    • 2005
  • Proper management of small rural watershed is important since it does affect water quality improvement of larger scale watershed. Therefore, effective small watershed management guideline including participatory program of local people is required to achieve water environment improvement. Feasibility of water quality goal, short and long-term watershed management plan and funding sources were investigated by field monitoring of Hampyungchun watershed which has characteristics of rural stream, and literature review. The relevant parties and their roles fer watershed management were identified and suggested. A hybrid model, that is mixture of government driven model and NGO model, is recommended for watershed management organization in this study.

The Study on Legal and Institutional Improvement to the Acquisition and Sharing of Land Monitoring Data (국토모니터링 자료취득 및 공동활용 개선을 위한 법제도 개선 방안 연구)

  • Lee, Suk-Min;Jo, Seon-Hui
    • Spatial Information Research
    • /
    • v.19 no.6
    • /
    • pp.29-41
    • /
    • 2011
  • Recently, the importance of systematic Land-monitoring has been emphasized. The existing Law does not include any definitions or regulations of monitoring. Although there exist laws regarding examining and measuring the current status of region, utilization, distribution, share, security and management of the data need to be improved. In order to upgrade the Land-monitoring system, several tasks such as terms, building cycle, forms, scope, management team should be well-defined. In this study, problems of the Land-monitoring is investigated by understanding the legislation in the land planning system and its operating system. The setting of the land-monitoring concept in Framework Act on the National Land and revision of specific laws in this field were introduced. Finally, new Land-monitoring legislation covering the improvement of the data-acquisition and co-utilization were suggested.

Issue Difference of Ecosystem Service Demand and Supply through Text Mining Analysis: Case Study of Shiheung using Complaints and Urban Planning Materials (텍스트 마이닝 분석을 통한 생태계서비스 수요-공급의 이슈 차이분석 - 시흥시 민원과 도시계획 자료를 활용하여 -)

  • Lee, Jae-hyuck;Park, Hong-jun;Kim, Il-kwon;Kwon, Hyuk-soo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.63-71
    • /
    • 2018
  • The comparison of demand and supply is needed for efficient ecosystem services planning. However, the gap between them cannot be analyzed as existing studies mainly dealt with only the supply of ecosystem services. This study compares the demand and supply of ecosystem services in Shiheung using environmental complaints and urban planning by semantic network analysis. As a result, 'air' and 'water' quality are magnified in demand, 'energy' and 'water' are crucial in supply. This result presents that citizen ask for the improvement of air quality in regulation services, although local government has plans for energy support in provisioning services. Periodic ecosystem services demand and supply monitoring will be the base of effective ecosystem services planning, which reduce insufficiency and surplus.