• Title/Summary/Keyword: Improvement measure

Search Result 1,854, Processing Time 0.027 seconds

A Study on the Key Competencies of Industrial High School Students and Some Way of their Improvement (공업계 고등학교 학생들의 직업기초능력의 수준과 개선 방안)

  • An, Gwang-Sik;Bae, Dong-Yun;Park, Rak-Young;Choi, Wansik
    • 대한공업교육학회지
    • /
    • v.30 no.2
    • /
    • pp.3-11
    • /
    • 2005
  • The purpose of this study is to measure the level of the key competencies of industrial high school students and to use it as the basic material so as to improve the key competencies. The subject was 359 industrial high school students(boys: 244, girls: 115) in Seoul, Daejeon, Gwangju, and Busan. The instrument used to measure the key competencies is that developed by Cheol-Young Jeong, which was partly revised with the help of a group of experts. The results of this study showed some of skills were below an average of 3.0, which were writting skill(M=2.85) and speaking skill(M=2.96) in communication skills, logical thinking(M=2.98) in problem solving skills, leadership skill(M=2.88) in interpersonal skills, and self-improvement skill(M=2.96) and the spirit of public service(M=2.93) in self-management and self-improvement skills. But technology skills were above an average of 3.0. And it appeared that technology skills(P=.023) depended on having a certificate or not, and so did communication skills(P=.020) and problem solving skills(P=.034) on the types of a course(employment or entrance into a college). So, to strengthen the key competencies which appeared below an average of 3.0 in this study, not only does the curriculum of industrial high schools need to be reorganized, but systematic strengthening program of key competencies should also be developed.

A Study on the Performance Improvement for Magnetic Resonance Imaging Examination by Using the 6-Sigma Application (6-시그마 기법을 이용한 자기공명영상 검사 실적 개선에 대한 연구)

  • Seoung, Youl-Hun
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.243-249
    • /
    • 2011
  • The purpose of the study was to improve of performance for Magnetic Resonance Imaging (MRI) examination in the department of radiology. It was performed DMAIC (Define, Measure, Analyze, Improve, and Control). In the stage of definition, The fifth kinds of CTQ (critical to quality) by the kindness, the waiting time, the examination explanation, the waiting time and the waiting environment were selected by voice of customer. In the stage of measurement, the performed examinations and the reservation waiting time were measured each 1.77 and 1.69 sigma. In the stage of analysis, the potential key causes were determined the limited working hours and the difference of examination time of various entries. In the stage of improvement, MRI were performed with the operating system of 24 hours examination and the optimization of the difference of examination time by among of 30 minutes, 40 minutes, 50 minutes. Finally, the number of examinations and reserved waiting days were measured by each 3.17 and 1.71 sigma in the control stage.

Problem and Improvement Measure of PHC Pile Construction (PHC파일 시공관리 문제점 및 개선방안)

  • Park, Tae-Kyu;Lee, Jung-Chul;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.344-348
    • /
    • 2008
  • During the last few years, the use of Pre-tensioned spun High strength Concrete(PHC) pile has been gradually increased in many construction sites such as super high-rise and large building construction. there is almost no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vortical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. And recent analysis results of the pile cutting work revealed that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is very labor intensive work, thus requiring a large amount of additional time, costs, and efforts. The main objective of the research is to analize problems and to improvement. measure of PHC Pile Construction. The improvement measure present to the main problem with survey and discussion.

  • PDF

Time Series Observations of Outcome Variables and the Factors Associated with the Improvement in the Patient Outcomes of Cataract Surgery (백내장수술환자 결과 변수들의 시계열적 관찰과 진료결과 향상에 영향을 주는 요인)

  • Kim, Han-Joong;Park, Eun-Cheol;Choi, Yoon-Jung;Kang, Hyung-Gon
    • Journal of Preventive Medicine and Public Health
    • /
    • v.34 no.2
    • /
    • pp.175-181
    • /
    • 2001
  • Objectives : To compare the multiple outcomes of patients with cataract surgery at perioperative time,3-4 months and 12 months after surgery and to assess patient outcomes associated with visual improvement(visual acuity of operated eye, visual function-14(VF-14), symptom score). Methods : For this assessment, a prospective study was conducted with 389 patients who had undergone cataract surgery for either one eye or both eyes. The surgery was peformed by 20 ophthalmologists who were practicing at university hospitals and general hospitals. Patients were interviewed and clinical data were obtained. Doctors were questioned with self-reported questionnaire forms. Medical records were examined in order to measure variables related to the surgical process such as surgical methods and ocular comorbidity. The survey was 'conducted at 4 stages' : preoperative time(389 cases), perioperative time(344 cases, 88.4%), postoperative 3-4 months (343 cases, 88.2%), and postoperative 12 months (281 cases, 72.2%). After excluding cases with incomplete data, 198 cases were enrolled in the study. Patient outcomes was measured for any improvement in the functional outcomes(visual acuity of operated eye, visual function, symptom score) at postoperative 3-4 months. Results : The visual acuity(operated, weighted average), symptom score, VF-14 score, satisfaction with vision, and subjective health status were shown to be improved at the perioperative time, postoperative 3-4 months and 12 mouths. An improvement in the Snellen visual acuity score was observed in 190 patients(96.0%), whereas improvements of the VF-14 score and cataract symptom sure were observed in 151 patients(76.3%) and 179 patients(90.4%), respectively. All three outcome measures demonstrated improvement in 137 patients(09.2%). The improvement of the three functional outcomes at 3-4 months after receiving surgery was associated with a lower level of visual function and a higher level of cataract symptom score at perioperative time, as well as a greater experience level of the surgeon. Conclusions : In this study, the estimates of the proportion of patients benefiting from cataract surgery varied with the outcome measure of benefit. Preoperative VF-14 score, a measure of functional impairment related to vision, and symptom score may be better measures of the benefit derived from cataract surgery than the change in visual acuity.

  • PDF

The Analysis on the Soongrae-Mun fire and it's improvement measure (경비업무적 관점에서의 숭례문화재사고 분석과 대책)

  • Chung, Tae-Hwang;Lee, Choong-Soo
    • Korean Security Journal
    • /
    • no.16
    • /
    • pp.321-338
    • /
    • 2008
  • Soongrae-Mun Fire shows safety problem in Korea intimately. People have pressed for the responsibility of persons in charge and have asked for improvement measure whenever Fire accident occur, but similar accidents occur again without any improvement. This research is to provide improvement. measure on the base of the analysis of the cause of Soongrae-Mun fire to prevent similar accident, also to help private security company do effective security job. This research is approached from a security point of view. A lot of accidents occur by direct cause such as people's unsafe action and unsafe condition. but it is very difficult to remove the facts of direct cause, so the facts of indirect cause should be analyzed together. Drew-up of security related legislation should be included when the establishment of fire fighting related legislation is examined, also technical improvement should be examined with legislation. security company should be concerned about securing of expertise and reinvestment for the improvement of expertise to overcome limitations of private security such as job boundary, capability and responsibility. Also private security company should try to service for public benefit and to examine practical compensation for loss occurred by mistake of security company.

  • PDF

Study on the Promoting the Improvement of Work Environment by the Monitoring Committee for Work Environment Measurement (모니터링위원회를 통한 작업환경 개선 활성화 방안)

  • Hwang, Gyuseok
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.28 no.2
    • /
    • pp.158-165
    • /
    • 2018
  • Objectives: We analyzed the problems that work environment measurement results don't lead to workplace improvement in the Work Environment Measurement System to propose an alternative. Methods: We reviewed reports and articles written by the Korea Occupational Safety and Health Agency and academic circles to identify the problems in the current Work Environment Measurement System and suggest an alternative. Results: One of the reasons that the Work Environment Measurement has not resulted in workplace improvement is that there were no proper regulating systems for managing the workplace improvement plans or improvement results. Moreover, there are not enough professional manpower in ministry of labor to evaluate the improvement plans and results from the Work Environment Measurement. Therefore, all of the workplace whose Work Environment Measurement results exceed the occupational exposure limit (OEL) should be managed by regional ministry of labor, and outside experts and new system for verifying improvement are needed. Conclusions: To accomplish the purpose of Work Environment Measurement, it is necessary to improve the work environment according to the results of Work Environment Measure. For this, it is necessary for the government to manage the fulfillment of workplace improvement plans and for measurement agencies to secure expertise.

A Clinical Study of Combined Eastern and Western Treatment of Acute Stage Stroke (급성기 뇌졸중 환자의 한양방 협진치료에 대한 임상적 고찰)

  • Kim, Jong-Hwan;Sin, Woo-Jin;Jang, Ja-Won;Kim, Ji-Yun;Min, Sung-Soon;Hwang, Won-Duek
    • The Journal of Internal Korean Medicine
    • /
    • v.25 no.4
    • /
    • pp.65-74
    • /
    • 2004
  • Object : This is a study of acute stage stroke patients designed for comparison of combined Eastern and Western medical treatments and Oriental treatments alone. Methods : 51 patients were diagnosed by Brain-CT and Brain-MRI scan as having suffered stroke. They had entered Dong-eui hospital within seven days of attack, and remained over seven days, all between November 2002 and August 2003. Patients were divided into two groups: a group treated with both Eastern and Western medical treatments, and a group treated only with Oriental medical treatments (but examinations were done and medications were given in hypertension, Diabetes Mellitus and so on). Results : The Eastern-Western medical treatment group showed significant changes in NIHSS. A rate of improvement figure of 24.94% was obtained for the Eastern-Western medical treatment group, and for the Oriental medical group a figure of 7.84% was obtained. Conclusion : The East-West medical treatment group had significant rate of development that measure for NIHSS by treated comparatively dependent patients. And oriental medical treatment group had significant rate of development that measure for NIHSS by treated comparatively independent patients. The NIHSS measure for the Eastern-Western medical treatment group shows a significant rate of improvement for relatively dependent patients, and the NIHSS measure for the Oriental medical treatment group shows a significant rate of development for relatively independent patients.

  • PDF

W-function for the Improvement of the Network in Manufacturing Process (제조공정 Network의 개선을 위한 W-함수)

  • 이상도;박기주
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.20
    • /
    • pp.71-76
    • /
    • 1989
  • In this paper, GERT network in modeled to improve the network of manufacturing process with feedback loop. A lot of Information on the GERT network can be derived from the equivalent W-function and MGF(moment generating function) using Mason's rule. These equations are used in calculating the variations of the performance measure and in improving the system performance. System improvement in manufacturing process is achieved by increasing the equivalent probabilities of each branches and by decreasing the expected equivalent time.

  • PDF

Research about optimal installation of ATP system in High speed Rolling-stock (고속차량 ATP시스템 개량의 최적화에 관한 연구)

  • Ryu, Byung-Gwan
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.476-482
    • /
    • 2009
  • A signal equipment improvement project for the existing facility ATS to ATP is under construction in Kyung-Bu and Ho-Nam commercial line including 400 rolling stocks. But there was a concern for the interface between KTX OBCS and ATP from the beginning of the project. At present, this is the front burner event. This paper introduces interface checking and predicted failure point between KTX OBCS and ATP improvement system. Through this measure the optimal installation of the ATP will be possible. The study was made under maintenance efficiency including reliability because the KTX signal equipment must qualify the above condition.

  • PDF

Reliability Analysis of Diesel Generators of Wolsong Unit 1

  • Park, S. Y.;Kim, S. H.;Kim, K. Y.;Kim, T. W.;Y. S. Cho
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.502-507
    • /
    • 1997
  • As a maintenance optimization project to improve the safety of Wolsong NPP (Nuclear Power Plant), reliability of diesel generators are estimated based on the operating experience, and improvement options are suggested. A reliability measure is suggested for the estimation of reliability for standby safety systems to reflect availability. It is assessed that the reliability of diesel generators can be much improved if the suggested improvement options are implemented.

  • PDF