Problem and Improvement Measure of PHC Pile Construction

PHC파일 시공관리 문제점 및 개선방안

  • 박태규 (인천대학교 건축공학과) ;
  • 이정철 (인천대학교 대학원 건축공학과) ;
  • 이찬식 (인천대학교 건축공학과)
  • Published : 2008.11.07

Abstract

During the last few years, the use of Pre-tensioned spun High strength Concrete(PHC) pile has been gradually increased in many construction sites such as super high-rise and large building construction. there is almost no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vortical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. And recent analysis results of the pile cutting work revealed that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is very labor intensive work, thus requiring a large amount of additional time, costs, and efforts. The main objective of the research is to analize problems and to improvement. measure of PHC Pile Construction. The improvement measure present to the main problem with survey and discussion.

최근 구조물의 고층화, 대형화 등 여러 가지 사회적 요구에 따라 기존 PC 말뚝의 개선책으로 PHC말뚝이 실용화 되었다. 현재는 대부분의 현장에서 PHC말뚝이 사용되고 있으며, 국내 콘크리트 말뚝 총 생산량의 90%이상을 점유하고 있다. 기성콘크리트 파일 공사의 굴착 및 파일 매입 작업의 국내 시방기준에는 파일을 연직으로 시공해야한다는 것만이 명시되어 있을 뿐, 이에 대한 측정기준 및 시공기준이 제시되어있지 않으며, 대부분의 시공현장에서는 숙련노무자의 경험을 통한 육안측정에 의존하고 있는 실정이다. PHC 파일의 두부정리 작업은 노동집약적이며 단순 반복적인 작업으로 숙련된 노무자에게 많이 의존해왔으며, 파일의 종 방향 균열 및 두부파손 등의 문제점이 발생되고 있다. 본 논문은 PHC 파일 시공 전 과정에서 발생되는 문제점을 분석하고 그에 대한 개선방안을 도출하기 위해 설문조사 및 면담을 실시하였다. 설문조사 및 면담을 통해 파일적재, 현장 내 소운반, 파일위치표시, 연직체크, 굴착 및 항타, 그라인딩, 안전사고의 주요 문제점을 도출하였고, 그에 대한 개선방안을 제시하였다.

Keywords