• Title/Summary/Keyword: Improvement Of System

Search Result 16,433, Processing Time 0.049 seconds

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.

Study on the Promoting the Improvement of Work Environment by the Monitoring Committee for Work Environment Measurement (모니터링위원회를 통한 작업환경 개선 활성화 방안)

  • Hwang, Gyuseok
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.28 no.2
    • /
    • pp.158-165
    • /
    • 2018
  • Objectives: We analyzed the problems that work environment measurement results don't lead to workplace improvement in the Work Environment Measurement System to propose an alternative. Methods: We reviewed reports and articles written by the Korea Occupational Safety and Health Agency and academic circles to identify the problems in the current Work Environment Measurement System and suggest an alternative. Results: One of the reasons that the Work Environment Measurement has not resulted in workplace improvement is that there were no proper regulating systems for managing the workplace improvement plans or improvement results. Moreover, there are not enough professional manpower in ministry of labor to evaluate the improvement plans and results from the Work Environment Measurement. Therefore, all of the workplace whose Work Environment Measurement results exceed the occupational exposure limit (OEL) should be managed by regional ministry of labor, and outside experts and new system for verifying improvement are needed. Conclusions: To accomplish the purpose of Work Environment Measurement, it is necessary to improve the work environment according to the results of Work Environment Measure. For this, it is necessary for the government to manage the fulfillment of workplace improvement plans and for measurement agencies to secure expertise.

A Study on the stage lighting operation and improvement of Cheonan City Hall Bongseo Hall and CMB EXPO art hall performance art hall of local self-government corporation (지자체 공연장의 천안 봉서홀과 대전 CMB엑스포 아트홀 무대 조명 시스템 운영 및 개선에 관한 연구)

  • Lee, Jang-Weon
    • Korean Institute of Interior Design Journal
    • /
    • v.18 no.5
    • /
    • pp.89-100
    • /
    • 2009
  • Stage lighting system is very important in theater. Because basic of performing art. Recently, The stage lighting system is very close with a performing arts. The performance arts is to have an easy communication between actors and audience. All activities related to performance art take place between the stage light and auditorium. Therefore, when constructing theater the best conditions of the stage light system should be considered for the smooth progress of play. It will be method of solution that basically facility in the performance art hall. The results of this study can be used for suggesting an operation and system improvement for stage lighting system in performance art hall. Recently, changes in the progress of plays have required the perfect stage light system. As a result, performance art hall are the most advanced stage lighting system technology of changed. The following procedures were taken for this research-the literature on the development of stage lighting system and equipment, structure, and the dimmer and computer console system has been reviewed theoretically Most of all, Cheonan City Hall Bongseo Hall and CMB EXPO art hall is important a sample of lighting system. The result of this study presents operation and system improvement stage lighting system in theater, below to operation and system improvement at stage lighting system local self-government corporation performance art hall are inconsistent stage.

The Changes of Standardization Administrative Organization and Improvement Plan (표준화행정기구의 변천과정 및 개선방안)

  • 조남호;이내형;한우철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.24 no.66
    • /
    • pp.47-57
    • /
    • 2001
  • This thesis introduce the organization system and office regulation of standardization administrative organization for the change of times, also suggest improvement plan for its effective management. The main improvement plan refer to the standardization administrative organization\`s work, this thesis suggest, 1. Readjustment of national standardization system and effective reorganization for standards information organization. 2. For industrial standards system, the korea industrial standards should be maintained uniform system, So decentralized korea industrial standard at government ,must be unified and maintained to unique policy for its effective improvement. 3. To strengthen with international standards organization, a institutional device, budget funds, and expert should be backed up. 4. For training and education of expert, Refer to the performance of one\`s duty, the proper expert should be chosen and posted. Also, systematic training and education system for expert must be developed, So they can be on duty continuously, Finally, this thesis suggest that the necessity of systematic and unique policy must be established for high position at international area. Since the limitation of data, the future research will be performed for budget funds and personnel setup.

  • PDF

The Improved Device of Seoul Subway Fare System (서울 지하철의 운임제도 개선방안)

  • Lee, Tai-Sik;Jun, Young-Joon;Kwon, Ou-Chul;Chung, Jong-Ky;Lee, Dong-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.200-205
    • /
    • 2006
  • Subway widely used as a major mean of public transportation both at home and abroad contributes to ease chronic traffic congestion in cities. However, subway operating expense is expected to increase continuously because subway requires vast amount of money at the construction stage, huge sum of maintenance cost is spent during operation, and passenger needs for more convenient facilities is increasing. on the contrary to enormous operating expenses, fare that is occupying most of operating income doesn't come up to its prime cost causing chronic operating deficit. It is urgent to prepare fare system improvement measures to increase operating income in order to resolve financial difficulty of a subway operating organization. Therefore, the current study analyzed present condition and problems of subway fare system, and suggested improvement measures such as improvement of fare adjustment procedure, improvement of free-ride system, diversification of ticket, etc.

Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects (농어촌정비사업 공종별 실적공사비 적산시스템개발)

  • 김현영;이정재;김영기;오상원;전효묵
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.3
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

The Impact of Information Lead Time Improvement on the Distributed Supply Chain System (분산형 공급체인에서 단계별 정보지연 개선이 주는 효과)

  • 김철수;최근영
    • The Journal of Information Systems
    • /
    • v.10 no.2
    • /
    • pp.129-150
    • /
    • 2001
  • In this study, we model a decentralized supply chain system which is managed by four types of centers, sequentially located: Retailer, Wholesaler, Distributor, and Factory Each center contributes to enhancing the performance of the supply chain system individually with its own local inventory information. Through experiments which are performed with a programmed simulation (like the MIT beer game), we investigate how the information lead time improvement in each center affects the whole system. And we show that the impact of the lead time improvement in the downstream, like retailers, affects more to the system than the one in the upstream, like factories, in a cost-effective way. Moreover, by using information lead time for each center, we analyze how much the extent of the improvement affects the whole system, especially for the total cost and the order level.

  • PDF

A Case Study about Improvement and System of Management in Park, Japan (일본의 도시공원의 운영관리체계와 개선에 관한 사례적 고찰)

  • 이기철
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.2
    • /
    • pp.80-90
    • /
    • 1993
  • This study was a case about improvement and system of management in park of Japan. Technique of Maintenance make a rapid progress. In the other hand, management was fall behind. Because of, its was not accept change of consciousness and variety of social factor. That is, not make clearly system of administration(organization, budget, etc.) for qualitative improvement of park. Besides, not make accumulation data of management and technique of maintenance. In future, need many study about system of management.

  • PDF

A Study on the Adopting Franchises System for the Improvement of Emergency Medical Services (응급진료의 효율화를 위한 프랜타이즈 시스템의 도입에 관한 연구)

  • 송미숙
    • Health Policy and Management
    • /
    • v.2 no.2
    • /
    • pp.152-178
    • /
    • 1992
  • This study focuses on making recommendations for the improvement of poor emergency medical services or EMS in Korea. Problems of the current EMS system is widely reviewed. As an alternative of the current system, a franchises system is introduced to EMS. A feasibility study of the new system is carried out as follows. 1) The current EMS system shows such problem as; - Inadequacy of emergency medical fee schedule, - Shortage of emergency medical resources, - Concentration of emergency medical facilities in metropolitan area, - Unestablishment of training program for emergency personnel, - Inappropriateness of patients' behvaviro pattern in emergency care system. 2) Recommendations for the improvement of EMS are as follows: - Well organized communication and transportation system needs to be established by utilizing all the availabl EMS is to be devised for the provision of appropriate emergency care. - A franchises system can be widly adopted so that private organizations are willing to establish a free standing emergency center. - Emergency care fee schedule of the franchises system needs to be appropriate for the system to provide high standard medical services.

  • PDF

A Study on the Process Design of Advanced Planning & Scheduling for Transformer Operation Improvement (변합기 공정 개선을 위한 APS(Advanced Planning & Scheduling) 프로세스 설계에 관한 연구)

  • Hwang, Duk-Hyuong;Nam, Seung-Don;Cho, Young-Wook;Oh, Sun-Il;La, Seoung-Hun;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.159-166
    • /
    • 2012
  • As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.