• 제목/요약/키워드: IT productivity

Search Result 4,669, Processing Time 0.027 seconds

Development and Implementation of Chain Metrics for Obtaining Lean Overall Equipment Effectiveness Using Availability Measures (시간가동률 척도에 의한 Lean OEE의 연계지표 개발 및 적용)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.2
    • /
    • pp.147-158
    • /
    • 2012
  • This paper aims to develop a new chain metrics for obtaining lean Overall Equipment Effectiveness(OEE) and present implementation strategy which considers the properties for Total Productive Maintenance(TPM) to reduce machine losses, Performance Analysis and Control(PAC) to reduce labor losses, Lean Production System(LPS) to reduce floor wastes, and Theory of Constraints(TOC) to minimize the problem of Capacity Constrained Resource(CCR). The study reviews the related literatures and reformulates the structure of machine losses, labor losses and field wastes. The research also develops the integrated productivity metrics according to time, units, reliability and maintainability. It is found that the study develops the actual productivity measure in terms of efficiency, effectiveness and standard productivity. In addition to that, it outlines and develops by using the integrated LPS and TPM, lean OEE measures such as Time Based Productivity(TBP), Unit Based Productivity(UBP), and Reliability & Maintainability Based Availability(RMBA). Implication examples are proposed to make it easier and available for practioners to understand the implementation strategies about TPM OEE, lean OEE and TOC OEE. Futhermore related to other studies, the research contributes to create a new chain productivity measures to clear the interrelationship concepts of productivity, efficiency and effectiveness. Moreover the paper develops the enhanced OEE measures by integration of TPM, PAC, LPS and TOC with the perspective of schedule, throughput, reliability, maintainability and availability.

A Study on Management System for Improving of Equipment Productivity in Injection Machining Process (사출가공공정에서 설비생산성 향상을 위한 관리체계에 대한 연구)

  • Park, Jun-Byung;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.219-226
    • /
    • 2017
  • This study investigates application cases of facility management system model for enhancing facility productivity of industry filed around medium and small facility processing companies and finds the inefficiency of the existing management model. Following items are researched to seek out methods and measures to maximize facility productivity through empirical analysis by exploring and establishing a new management model. First, the empirical analysis, it is found that the overall equipment efficiency index used for facility productivity management in the companies has a difficulty being used as the index for it in actual medium-small processing companies. Second, a new facility management system model applying standard cycle time is suggested among facility management index system to measure facility productivity. Third, the empirical analysis is used to verify that developed facility management system model is a useful method to manage the facility productivity by applying the model to actual medium-small processing companies. Finally, it is necessary to implement comparison analysis on whether actual productivity enhancement induces a distinctly different result by using a new facility management index system model to be inhibited in this study.

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

The Impacts of Technology Transfer on Productivity Growth of Firms based on Malmquist Productivity Index

  • Han, Jaeseung;Kwon, Youngkwan;Lee, Sang-Yong Tom
    • Asia pacific journal of information systems
    • /
    • v.26 no.4
    • /
    • pp.542-560
    • /
    • 2016
  • This study determines whether or not firms can achieve high productivity growth through external technology acquisition. It also identifies the key factors affecting adopting firms' productivity growth by employing the Malmquist productivity index (MPI) methodology, which features computational ease, low data dependency, and decomposition of productivity growth into technical efficiency change and technical change. Results showed that the effects of productivity growth arising from technology transfer became stronger over time. Moreover, patent transfer guaranteed firms' productivity growth, but no evidence was found that factors such as age and size could increase productivity. Finally, cultural similarity could be another factor conditioning the effectiveness of technology transfer in the productivity of adopting firms.

An Information Technology Usage Level Assessment Model for Service Industry (서비스산업의 IT활용수준 평가모델 개발)

  • Kim, Hyun-Soo
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.255-274
    • /
    • 2008
  • The purpose of this research is to develop an information technology (IT) usage level assessment model for service industry. It is necessary to develop an assessment model for service industry's IT usage to improve service productivity. However, it is not easy to develop assessment models due to service industry's diversity. In this paper a generic IT usage assessment model for service industry has been developed and validated through a descriptive approach. Key factors affecting service productivity have been identified and analysed. A pilot test on IT usage level has been performed to investigate the relevance and importance of IT usage indicators (factors). As a result, a set of effective IT usage indicators for service industry have been found. A short-cut model and a full scale model have been proposed for efficient and effective usage. The results of this study can be used for enhancement of service industry productivity through the increase of IT usage level.

A Study on the influence of Productivity improvement of middle and small sized company's learning organization on productivity (중소기업 학습조직 활성화가 생산성에 미치는 영향에 관한 연구)

  • Jo, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.283-290
    • /
    • 2017
  • In knowledge information society entering global unlimited competition era, our middle and small sized companies are the base of national and enterprise competitiveness and core base of national economy as an origin of jobs. The competitiveness of middle and small sized companies is so important to decide the level of the competitiveness of the whole industries, but the gap from big sized company is much low in comparison with advanced countries from angles of important factors of enterprise growth, productivity and technological competitiveness, so, it's urgent to improve the competitiveness through productivity enhancement. The purpose of this research is to do a positive study on effects of learning organization management outcomes of middle and small sized company on enterprise productivity among various types of outcome brought for strengthening of enterprise competitiveness. It confirmed learning organization has functions and usefulness as a management tool bringing positive effects on enterprise productivity through the Productivity improvement.

Human Resource Competency, Economic Potential, and Village-Based Enterprises' Productivity: The Mediating Role of Governance

  • Ida Bagus Putu Purbadharmaja;Putu Yudi Setiawan;M. Rudi Irwansyah;Bagus Shandy Narmaditya
    • Asian Journal for Public Opinion Research
    • /
    • v.11 no.1
    • /
    • pp.31-53
    • /
    • 2023
  • This study aims to investigate the relationship between human resource competency, economic potential, and productivity of village-based enterprises, as well as understand the role of governance in mediating this relationship. This study was conducted in several village-based enterprises in Bali, Indonesia and the data were collected using questionnaires. Furthermore, the collected data were analyzed quantitatively using partial least analysis to confirm the relationship between variables. The findings indicate that human resource competency has an impact on governance, but it failed to explain the productivity of village-based enterprises. In addition, economic potential can have an impact on the governance and productivity of village-based enterprises in Bali, Indonesia. This study also showed a robust link between governance and productivity. Lastly, based on the statistical analysis, it was found that governance can mediate the relationship between human resource competency, economic potential, and productivity of village-based enterprises.

Contributions of Public Investment to Economic Growth and Productivity

  • HAN, SUNGMIN
    • KDI Journal of Economic Policy
    • /
    • v.39 no.4
    • /
    • pp.25-50
    • /
    • 2017
  • Whereas a large variety of previous studies show mixed results regarding the relationship between public investment and economic outcome, several studies have been conducted on related issues in Korea. The present study deals with the effect of public investment in Korea on economic growth and productivity. Using administrative data, it exploits three different methodologies: the total factor productivity approach, production function approach, and stochastic frontier production function approach. The results of this study show that public investment has a statistically significant effect on economic growth. However, it contributes little to enhance productivity. It is explained that there exists inefficiency of production in the Korean economy. These findings indicate that public investment has played a central role in the direct input factor and not in indirect role in Korea. Thus, it is necessary for public investment policies to concentrate on enhancing the efficiency of the Korean economy.

The Effect of Multiple Value Frames of IT Productivity on Business Performance

  • Kang, Taeg-Yong;Kwon, Do-Wan;Son, Eun-Il
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.4
    • /
    • pp.203-218
    • /
    • 2003
  • The ongoing debate over IT productivity has revealed paradoxical effects of IT. This study proposes that IT business value is paradoxical structured. IT impacts are not easy to generalize according to one perspective or paradigm. This study assumes multiplicity in the phenomenon of IT value and explores effects of these multiple interpretations. The study seeks to understand organizational performance. Hypotheses are developed to test the relationship between competing interpretations of IT value and organizational performance. The purpose of this study is to determine whether or not senior managers perceive IT value on the basis of divergent managerial value frames.

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou;Feng, Xin;Zhou, Jing
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.16-23
    • /
    • 2015
  • In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.