• Title/Summary/Keyword: IT Project Model

Search Result 2,009, Processing Time 0.028 seconds

Analysis of the Relationship Between Project Goal and Model Use Through BIM RFI Analysis at the Construction Site (시공 현장의 BIM 정보 요청 사항을 통해 분석한 프로젝트 목표와 BIM 활용 간의 관계)

  • Lee, Seung-Won;Eum, Ik-Chul;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.14 no.1
    • /
    • pp.22-29
    • /
    • 2024
  • BIM is a practical and economical technology used in the construction process. Despite the fact that BIM is widely used in the design and another stage before construction, it is not largely applied during the construction stage itself. However, it is important to opt for BIM during construction stage because there may occur a number of risks such as construction delay and increased construction costs. Therefore, the present paper contains the analysis of the model use, which is mainly applied to respond to the BMI RFI that represents an information requirement of construction site workers, by analysing the BMI RFI application at the construction site. In addition, there is an analysis of the way the derived model use affects the project goal aimed at the project success.

Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측)

  • Yun, Seok-Heon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.103-111
    • /
    • 2023
  • Accurate cost estimation in the early stages of a construction project is critical to the successful execution of the project. In this study, an ANFIS model was presented to predict construction costs in the early stages of a construction project. To increase the usability of the model, open construction cost data was used, and a model using limited information in the early stage of the project was presented. We analyzed existing studies related to ANFIS to identify recent trends, and after reviewing the basic structure of ANFIS, presented an ANFIS model for predicting conceptual construction costs. The variation in prediction performance depending on the type and number of membership functions of the ANFIS model was analyzed, the model with the best performance was presented, and the prediction accuracy of representative machine learning models was compared and analyzed. Through comparing the ANFIS model with other machine learning models, it was found to show equal or better performance, and it is concluded that it can be applied to predicting construction costs in the early stage of a project.

Incorporating Social & Economic Factors for the Pasture Project in Kum River (금강 참게목장화 사업의 사회-경제 통합모델링)

  • Jeon, Dae-Uk
    • Korean System Dynamics Review
    • /
    • v.12 no.1
    • /
    • pp.59-74
    • /
    • 2011
  • This article deals with an economic evalutation of the 'Pasture Project of Kum River', which is the farming plan of mitten crabs in a stream of it. An augmented model of social capital is based on the past ecological-economic system dynamics model and elaborated further with suggestions of social capital literature. During the modeling process a chain diagram of causal relations and its relevant mathematical equations are presented for simulating the project performance, and the simulation results are provided to contrast the dynamic behaviors of the former ecological-economic model with ones of the new model incorporating social capital. The results indicate that an increase in the economic benefit of the project could happen in case of considering the process of social capital accumulation around the case area, which can be regarded as a remarkable trial to approve the common confidence in the role of social capital to enhance an economic achievement.

  • PDF

Efficiency Analysis of Project Management Offices Using Bootstrap DEA (부트스트랩 자료포락분석을 이용한 프로젝트 관리 조직의 효율성 분석)

  • Ko, Joong-Hoon;Park, Sung-Hun;Bae, Eun-Song;Kim, Dae-Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.61-71
    • /
    • 2018
  • The purpose of this study is to analyze the efficiencies of project management offices in large information system construction projects using the data envelopment analysis. In addition, we tried to estimate the confidence interval of those efficiencies using bootstrap DEA to give a statistical meaning. The efficiency by the CCR model is analyzed as eight project management offices are fully efficient and 22 project management offices are inefficient. On the other hand, there are 15 project management offices are fully efficient, but 15 project management offices are inefficient in the BCC model. As the result of the scale efficiencies, of the inefficient project management offices, 13 project management offices are inefficient in scale. It is possible to eliminate the inefficiency in the CCR model by improving their project performances. And, the nine project management offices showed that the inefficiency was due to pure technical efficiency, and these companies should look for various improvements such as improvement of project execution system and project management process. In order that the inefficient project management offices be efficient, it is analyzed that more efforts must be made for on-budget and on-time as a result of examining the potential improvement potentials of inefficient project management offices.

A Fuzzy AHP Model for Selection of Consultant Contractor in Bidding Phase in Vietnam

  • Ha, Tran Thanh;Hoai, Long Le;Lee, Young Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.2
    • /
    • pp.35-43
    • /
    • 2015
  • Project Management Consultant (PMC) plays a vital role in the overall performance of any project. Selecting right PMC for right project is the most crucial challenge for any construction owner. Thus, PMC selection is one of the main decisions made by owners at the early phase of construction project. It is not easy for the project owner to select a competent PMC due to the fuzziness, imprecision, vagueness, incomplete and qualitative criteria of the decision. This paper presents a model for selecting PMC contractor using the Fuzzy Analytical Hierarchy Process (FAHP). And a fuzzy number based framework is proposed to be a viable method for PMC contractor selection. A case study to illustrate the application of the model is also presented in this paper.

Development of Project Management Index to Improve Defense Project Management Capabilities (국방 사업관리 능력 향상을 위한 사업관리지수 개발)

  • Han, Hong-Kyu;Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.5
    • /
    • pp.831-840
    • /
    • 2010
  • The management systems of defense projects need to be well-maintained because of huge cost and long-terms of acquisition & operation in conducting defense acquisition. In this paper, we use a structural equation model(SEM) to develop an project management index(PMI) for effective defense project. The concept of a customer satisfaction index is used to assess the PMI for strategic improvement plans for various characteristics of project management. It is expected that our model can be used to evaluate and improve the project management capability of defense acquisition.

Leadership Competencies of IT Project Managers : from Team Social Capital Perspective (IT프로젝트 관리자의 리더십 역량 : 팀 내 사회적 자본 관점에서)

  • Lee, Hye-Jung;Park, Jun-Gi;Lee, Jung-Woo
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.133-147
    • /
    • 2011
  • This study explores the applicability of social capital theory in IT project management. Specifically, an empirical model is developed using different types of leadership competencies (emotional, cognitive, and social) as independent constructs impacting IT project performance. Social capital shared among team members are measured and placed as a mediating construct between leadership competencies and performance. Using PLS analysis of 120 data points collected through a survey of IT project participants in two large electronic manufacturers, direct and indirect impacts of leadership competencies are explicated. Research results reveal that emotional leadership competency seems to directly influence the project performance but not through team social capital, while social leadership competency seems to indirectly influence the project performance through team social capital but not directly onto the project performance. Cognitive leadership competency is the only leadership competency that maintains direct and indirect influence on project performance. Total effect of cognitive competency on project performance is almost two times larger than the total effect of emotional leadership competency and six times larger than the total effect of social leadership competency. Implications of findings are discussed at the end, and further studies are suggested.

A study of actual planning how to increase IT productivity by COCOMO II Model (IT산업 생산성 향상을 위한 프로젝트 실행계획 수립 방안 연구 - COCOMO II 적용사례)

  • Park, Cheol-Gu;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.2
    • /
    • pp.147-152
    • /
    • 2010
  • Project implementation plan is a blueprint that confirms project performance activities and specifies required man-hour, period and resource imput ratio. Various figures, the results of implementation plan, are predicted through estimation, and because of superiority of objectivity and repeatability, numerical formula-based estimation model is often used overseas. COCOMO model is the representative estimation model whose theories and formulas are publicized and it predicts the total man-hour required for software system development. This model is publicized in "Software Engineering Economics" written by Professor Barry Boehm of the U.S., and is the most widely applied numerical formula-based estimation model. This study is conducted to provide a series of methods that are optimal for KTDS environment by choosing COCOMO II model among various types of COCOMO models. In establishing implementation plan, COCOMO II model alone is not sufficient, it is necessary to link with and apply standard WBS system and standard man-hour. In establishing specific implementation plan, phased standard WBS system in order of the first phase of all the activities implemented in the project, Activity, Task, and Role, and the man-hour put into this should be distributed according to standard ratio from COCOMO II model's total man-hour. This study provides explainations by establishing standard WBS system and linking with COCOMO II model.

Development of R&D Project Selection Model and Web-based R&D Project Selection System using Hybrid DEA/AHP Model (DEA/AHP 모형을 이용한 R&D 프로젝트 선정모형 및 Web 기반 R&D 프로젝트 선정시스템 개발)

  • Lee, Deok-Joo;Bae, Sungsik;Kang, Jinsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.1
    • /
    • pp.18-28
    • /
    • 2006
  • Some issues which should be considered in an R&D project selection problem are as follows: First, quantitative analysis on the efficiencies of R&D projects is required to guarantee objective validity in the evaluation of the projects. For this reason, the methodology for selecting R&D projects should be based on mathematical models that perform quantitative analysis. Second, in general there are ordinal factors like Likert-scale in the data for evaluating R&D projects. Previous researches, however, couldn't suggest explicit methods incorporating these ordinal factors into models. Third, for the R&D project selection problems with limited resources like budget, it is necessary to decide the perfect ranking of the all projects. This paper develops a mathematical model that can be applicable to the problems of selecting R&D projects with the previous features. In this paper, we improve the original DEA model for evaluating efficiency to incorporate ordinal factors and suggest a new model which can decide the perfect ranking of all projects by merging the improved DEA model and AHP method. Furthermore a web-based R&D project selection system using the DEA/AHP model suggested in this paper is developed and illustrated.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.