• Title/Summary/Keyword: IT PROJECT

Search Result 9,042, Processing Time 0.04 seconds

Development of an Strategic Model for the Selection of a National IT R&D Strategic Project (국가 IT R&D 전략과제 선정 모형개발)

  • Ryu, Dong-Hyun;Park, Jeong-Yong;Lee, Woo-Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.3
    • /
    • pp.501-509
    • /
    • 2011
  • In this paper, we offer a new strategic Portfolio Model for national IT R&D project selection in Korea. A risk and return (R-R) Portfolio Model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R Portfolio Model to solve the non-strategy and subjectivity problems of the existing national R&D project selection Model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technology level Survey (TLS) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic Portfolio project and balancing the allocation of resources effectively and objectively.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

Impacts of Low User and Project Management Risk on IT Project of Public Sector: The Moderating Effect of User Knowledge (사용자 및 프로젝트 관리 위험 감소가 공공부문 IT 프로젝트 성과에 미치는 영향 : 사용자 지식의 조절효과)

  • Lee, Sooin;Kim, Sanghyun
    • Journal of Digital Convergence
    • /
    • v.18 no.6
    • /
    • pp.187-196
    • /
    • 2020
  • We tried to do research on main views(risk and knowledge-based) and propose user knowledge as a factor to be managed in order to strengthen the performance. This study empirically analyzed the user-related and project management risk that affect the IT project performance, and verified user knowledge as a moderating variable. The survey was conducted for respondents who have experience on IT Project of public sector and data were analyzed by Smart PLS 3.0. The results show that low user-related and project management risks have a positive effect on performance. In addition, user knowledge has been shown to enhance the impact of two risks on performance. These findings are meaningful in that they emphasize the importance of user knowledge in public-sector IT projects, as well as the repeated verification of integrated research results.

A Study on Perception of Project Risk Factor - Comparison between Software Package and Development with Program Language in Information System Project - (프로젝트 위험요인 인식에 관한 비교 연구 - 정보시스템 구현 프로젝트에서 소프트웨어 패키지 적용과 순수 개발하는 경우 -)

  • Park, Song-Mee;Chae, Myung-Sin
    • The Journal of Information Systems
    • /
    • v.16 no.4
    • /
    • pp.243-268
    • /
    • 2007
  • It is critical to manage risks to complete IS(Information Systems) projects successfully. Identifying risk factors would be the first step for the project risk management. Previous research has discussed the issue with various points of view, such as different risk factors based on project types and roles involved in their projects. This paper empirically explored how people perceive different risk factors by project development methodology, between self-developing IS using programming language like C, Visual Basic and adapting software package already developed by software venders like ERP, CRM packages. There are researches regarding project risk factors for project management in the several point of views. And there are also researches regarding comparison between self-developing and adapting software packages methodology in IS project. However, there are no study on project risk factors comparison between self-developing IS using programming language and adapting software packages already developed by software venders in IS project. This research can be differentiated from previous ones, because it was considered both point of project risk management and development methodology in IS project. This research results implied meaningful messages to enterprise company to be planned IS projects and people who involved in IS projects. They should consider and need to prepare differently according to each development methodology for preventing project risks. It makes them reduce project risks in each case and complete successfully IS projects. Especially, if they have no experiences for implementing software packages, they can forecast the project risks and prepare them in advance.

  • PDF

Analyzing the Structural Relationships between Project Manager's Creative Thinking, Entrepreneurship, and Project Performance (프로젝트 담당자의 창의적 사고, 기업가정신, 프로젝트 성과 간의 구조적 관계 분석)

  • Lee, Seol Bin
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.12 no.1
    • /
    • pp.87-99
    • /
    • 2017
  • This study is intended to look into the structural relationships between project manager's creative thinking, entrepreneurship, and project performance. To achieve this, research model and hypothesis were established to carry out statistical analysis based on the results of an empirical sample survey. The findings showed that project manager's creative thinking didn't improve project satisfaction directly, but it improved project satisfaction through the mediating effects of project manager's entrepreneurship. While it had a direct effect on perceived project performance, project manager's entrepreneurship was not mediated in this process. This suggests that even if project managers have a high expertise, thinking skill and motivation as creative thinking in working on the project, they have the limitation in leading to customer satisfaction from a personal perspective.

  • PDF

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

A Study on Factors for Influence SW Development Productivity on The IT Service Company (IT Service기업의 Software개발 생산성 영향 요인에 관한 실증 연구 : SW개발 방법론 중심으로)

  • Song, Young-Woon;Kim, Wanki
    • Journal of Information Technology Services
    • /
    • v.13 no.2
    • /
    • pp.195-217
    • /
    • 2014
  • This paper has explored when implementing SW development project of the IT service corporations, what factors affect its productivity in SW development methodology. The importance of the AHP analysis surveyed from the experts in IT service companies and related committee, was shown in the order of the following processes : 1) Deployment process 2) Management process 3) Establishment process. It is measured the methodology levels of establishment, deployment and management in each project using the survey results collected from project execution members and analyzed the productivity of projects that have been executed within 2 years. Using project methodology level, productivity correlation analysis, and regression analysis, this study confirms that the methodology deployment level brings positive effects significantly to SW development productivity. The significance of this study would be not only to research and analyze SW development productivity using the real project execution data but also to underline the necessities and the importance of steady research, deployment and support for SW development productivity improvement.

A Framework for Identifying and Analyzing IT Project Risk Factors (IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구)

  • Jangho Choi;Chanhee Kwak;Heeseok Lee
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.87-110
    • /
    • 2017
  • Analyzing and finding the risk factors in information technology (IT) projects have been discussed because risk management is an important issue in IT project management. This study obtained the risk factor checklists with priorities, analyzed the causal relationship of risk factors, and determined their influences on IT project management. However, only few studies systematically classified IT project risk factors in terms of risk exposure. These studies considered both the probability of occurrence and the degree of risk simultaneously. The present study determined 53 IT project risk factors on the basis of literature and expert group discussions. Additionally, this study presented clustering analysis based on the data of 140 project managers. The IT project risk factor classification framework was divided into four areas (HIHF, HILF, LIHF, and LILF). The present results can be used to help IT project managers establish effective risk management strategies and reduce IT project failures. This study also provides academic implication because it considers both the probability of occurrence and the degree of influence of risk factors.