• Title/Summary/Keyword: IT PROJECT

Search Result 9,042, Processing Time 0.038 seconds

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

A Study on Advanced Analysis of Construction Project Performance Evaluation (건설사업 수행성과평가에 대한 분석 고도화 연구)

  • Kim, Kyong hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

A Study on The Prior Environmental Review System in a Costal Improvement Project (연안정비사업의 사전환경성검토 방안에 관한 연구)

  • Maeng, Jun-Ho;Cho, Kwang-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.179-187
    • /
    • 2010
  • A costal improvement project is designed for preventing disasters on the coast, improving costal environment, and promoting costal functions, so it is different from the one for developing coasts. However, the costal improvement project also affects the surrounding environment and it may damage the costal environment in some cases. In line with this, this study was carried out to provide the guideline to the review on environmental conditions, which should be performed in the stage of establishing the plan for a costal improvement project, so that the influence affecting marine environment can be reduced and more efficient coastal project can be planned. The costal improvement project is different in the degree of affecting the costal environment according to kinds, scales, and regions. Accordingly, in this study the state of the coastal improvement project and involved problems were analyzed. The prior environmental review system was divided into a seawall-installation project, a marine construction such as the installation of submerged breakwater and jetties, and a project for creating water-friendly coast including a park without marine landfill. The main items for reviewing these specific projects were presented.

Cultural Exchange Between Korean and Japanese Students Through Videos

  • Seo, Eun-Mi
    • English Language & Literature Teaching
    • /
    • v.9 no.2
    • /
    • pp.1-16
    • /
    • 2003
  • This paper describes a video exchange project between English classes in South Korea and in Japan. Korean and Japanese students worked in groups to make short videos in English which were then exchanged. After viewing their counterparts' videos, students e-mailed feedback to each other. This project was the third video exchange project between Korean and Japanese university students since 2001. However, it was the first time to try it with three universities together. Students from the different universities tried to compete with each other. It provided a better chance for students to improve their English. Most students expressed the importance of the video exchange project in developing their English proficiency and enabling them to use English in an international context. Many students agreed that the project was an educational, enjoyable and worthwhile experience.

  • PDF

A Practical 1 Page Contextual Diagram for Monitoring Multiple Projects: An Empirical Study of an IT Organization

  • Lee, Jung-Gyu;Jeong, Seung-Ryul
    • Journal of Internet Computing and Services
    • /
    • v.17 no.5
    • /
    • pp.121-129
    • /
    • 2016
  • Company A, an embedded system manufacturer, has been managing multiple development projects. Executives need to understand the risk level of every project and prioritize resource distribution. Traditional project monitoring tools or excel sheets are too complex for calculating the risk factors across a functional organization. Two new charts, "Spear-head Chart" and "Float Chart" were designed to assist high level decision making processes. Two charts were used for weekly executive meetings in order to monitor project progress and rectify project direction. One page graphical monitoring tools in Company A are good enough for high management decision making. Authors explain the characteristics of two charts and propose its practical implementation in real working environment. Spear-head chart was also implemented as a system.

Earned Value Management base on System Engineering Process in the Weapon R&D Project (무기체계개발 사업에서 체계공학 프로세스 기반 사업성과관리 수행 방안)

  • Kuk, Seung Hak;Kim, Yun Hee;You, YI Ju
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.2
    • /
    • pp.51-59
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a performing method for EVM based on system engineering process.

Applying Monte Carlo Simulation for Supporting Decision Makings in Software Projects (소프트웨어 프로젝트 의사결정 지원을 위한 몬테카를로 시뮬레이션의 활용)

  • Han, Hyuk-Soo;Kim, Cho-Yi
    • Journal of Information Technology Services
    • /
    • v.9 no.4
    • /
    • pp.123-133
    • /
    • 2010
  • There are many occasions on which the critical decisions should be made in software projects. Those decisions are basically related to estimating and predicting project parameters such as costs, efforts, and duration. The project managers are looking for methods to make better decisions. The decisions about project parameters are recommended to be performed based on historical data of Similar projects. The measures of the tasks in past projects may have different shapes of distributions. we need to add those measures to get a predicted project measures. To add measures with different shapes of distribution, we need to use Monte Carlo Simulation. In this paper, we suggest applying Monte Carlo Simulation for supporting decision makings in software project. We implemented best-fit case and scheduling estimations with Cristal Ball, a commercial product of Monte Carlo simulation and showed how the suggested approach supports those critical decision makings.

Revised PPC Measurement Method considering Interfering Float Weight of Task

  • Jung-Sook Yun;Hyung-il Kim;Jung-Ho Yu;Chang-Duk Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1479-1484
    • /
    • 2009
  • It is commonly recognized to need performance management for successful construction project. PPC measurement of Last Planner System is one of construction project measurement method. PPC measurement is quantitatively assessment to go through construction, and that is not completely to be trusted when compare a project with another or an individual case work with another in same project. According to, purpose of this study is comparison indicator establishment that compare project with another or an individual case work with another it is not use PPC measurement for quantitatively assessment to go through construction. The procedure of this study is derive of the point at issue of existing PPC measurement for a aim PPC measurement in this study expenditure and select weight about that and it is applied to actually construction.

  • PDF

Improving Outsourced ISD Project Performance : Focusing on Conflict and Conflict Resolution Facilitation (아웃소싱을 통한 정보시스템 개발성과 향상방안 : 갈등 및 갈등해결 촉진을 중심으로)

  • Cho, Dong-Hwan;Lee, Ho-Geun;Lee, Choong-Cheong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.1
    • /
    • pp.71-105
    • /
    • 2008
  • Various stakeholders within and outside of the organization are involved and participate in the outsourced IS development. As their interests and goals are different conflict arises in the process of their interaction, and it is an important factor affecting outsourcing success. The study focuses on the conflict between client users and vendor, i.e. main conflict in the outsourcing project, and examines the relationship of conflict with project success, the antecedents of conflict, and investigates the effectiveness of conflict resolution facilitation. An integrated conceptual model is developed grounded on is outsourcing, IS development, project management, and organizational behavior literature. Nine specific hypotheses on the conflict in outsourcing projects are proposed, and data collection and analysis are performed with 214 ISD outsourcing projects. Results indicated that the conflict between client users and vendor in outsourcing projects was found to have negative effects on project success. Main causes affecting conflict were examined, and relative influences of these causes were clarified. Recently internal IT personnel have been faced their role change with the increase of outsourcing, and the importance of their conflict resolution facilitation was highlighted.