• Title/Summary/Keyword: IT Operation Cost

Search Result 1,948, Processing Time 0.037 seconds

A Study on ATS Control Procedure to adopt Low Density Line (저밀도 노선 적용을 위한 ATS 제어절차에 관한 연구)

  • Cho, Bong-Kwan;Park, Kee-Joon;Park, Pyoung-Sik;Lee, Young-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.5
    • /
    • pp.830-837
    • /
    • 2015
  • A study which is to develop the low-cost urban railway system for low-density line such as Gwang-ju subway Line 2 is in progress, and its TCS(Train Control System) is required as an economic system which is able to train operation suitable in low-density line. We have developed the signaling equipment which is configured with automatic block system between stations, and the control center's equipment in order to meet the requirements of TCS mentioned above. In this paper, we propose the control procedure of ATS to be required for train operation management in the low-density line such as Gwang-ju subway Line 2. The control procedure of ATS considered all features such as the requirements analysis for train operation management, the functions of train control system to be applied and the block type. Also, it considered the station(interlocking, passenger, turn-back) type, station control(stop, route, departure, turn-back departure, turn-back) type, and train operation management for exiting and entering depot. The ATS control procedure proposed in this paper has an advantage in the cost and efficiency through unification and optimization of its function. And in cost of operating and maintenance, the ATS system has a feature that can be significantly reduced.

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

A Study on the Life Cycle Cost Evaluation of the Conventional Auxiliary Power Unit for 8200 Series Electric Locomotive (8200호대 전기기관차용 기존품 보조전원장치의 수명주기비용 평가에 관한 연구)

  • Lee, Kye-Seung;Kim, Wan-il;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.2
    • /
    • pp.331-336
    • /
    • 2018
  • In this paper, the life cycle cost of the auxiliary power unit in the conventional 8200 series electric locomotive is evaluated and an effective life cycle cost reduction method is sought. For this, a life cycle cost evaluation model was proposed using IEC 60300-3-3 standard. As a result of analysis, material cost which accounted for a large percentage of preventive maintenance cost, accounted for 64% of total cost, and breakdown maintenance cost was as high as 27%. Except for the cost of preventive maintenance, the breakdown maintenance cost ratio was the highest. In order to reduce the LCC of the auxiliary power unit(APU) of the 8200 series in the future, it is necessary to reduce the material cost in case of development and to secure the high reliability according to the parts manufacturing so as to minimize the maintenance cost.

A Study on Human Engineering for Human Ability (인간능력에 대한 인간공학연구)

  • 이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.3-10
    • /
    • 1978
  • Human Engineering has an intention of design to keep the best condition of man-machine system. Hitherto the conception of design has been used to include existing engineering, as mechanical engineering and electric engineering. But the manufactured goods which to be made these process seem to be fully equipped on physical function, but faults come out discountent repeatedly to users. Accordingly, the development of industrial design has been demanded for improving functional design. It is considered that industrial design has aesthetical sensation. In actually, it must be 1. to provide for utility and safety, 2. easy for maintenance, 3. cheap at cost. 4. possible for sales appeal, 5. and good on appearance. As taking into consideration above five conditions, however, for 삯e sake of comprehend to human being about operating method of machinery and equipment, it should be reflected to design what kind of training way will be needed. Also, it must be considered what a certain extent would be occurred tiredness to human being. in other words. it should be considered the design to be possible the reflect to principle of motion economy, It should not be made adoption of human ability for the designed machinery, it must be adopted the method to consider the design on presuppose about human ability. For study of these actual fact, this paper is summarized the essence of human engineering, and also to find out the methodology as humanistic engineering, It is, Particularly, subdivisionization of operation in flow operation is essential direction of mechanization. Generally. as developing the subdivisionization of operation, it will be lack of satisfaction on operation which worker take charge of. The subdivisionization of operation makes the operation to simple-repetitive, to lose the interest of worker and will be also come into question to the feeling of worker's livelihood. It is human's fundamental desire to have get skilful function or special technique. But the subdivisionization of operation hold in those human's fundamental desire and so that it will likely to lose the sorority of living by this fact. Accordingly, this paper have an operation to hold out the methodology on presuppose about human ability.

  • PDF

Comparative analysis of the minimum capacity of an ice-on-coil thermal storage system for various operation strategies (관외 빙착형 빙축열시스템의 운전방식에 따른 최소용량 비교)

  • 이대영;정성훈;강병하
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.11 no.3
    • /
    • pp.401-413
    • /
    • 1999
  • An ice storage cooling facility with cooling capacity of 150㎾ has been constructed for the purpose of developing optimal design and control strategy for an ice storage system. As the first step to this purpose, a computer program has been developed to simulate the operation of the ice storage system and examined precisely by comparing the results with those measured from the test facility. With the simulation program verified from the comparison, a design procedure has been developed to determine the minimum capacity required for each operation strategy available commercially. It is shown that the minimum sizes of the chiller and the storage tank are strongly dependent on the control strategy, i.e., chiller priority or storage priority, but less affected by the arrangement method, i.e., chiller upstream or chiller downstream.

  • PDF

Power Cost Analysis of Go-ri Nuclear Power Plant Units 1 and 2

  • Chung, Chang-Hyun;Kim, Chang-Hyo;Kim, Jin-Soo
    • Nuclear Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.101-116
    • /
    • 1976
  • An attempt is made to analyze the unit nuclear power cost of the Go-ri units 1 and 2 in terms of a set of model data. For the calculational purpose, the power cost is first decomposed into the cost components related to the plant capital, operation and maintenance, working capital requirements, and fuel cycle operation. Then, POWERCO-50 computer code is applied to enumerate the first three components and MITCOST-II is used to evaluate the fuel cycle cost component. The specific numerical results are the fuel cycle cost of Go-ri unit 2 for three alternative fuel cycles presumed, levelized unit power cost of units 1 and 2, and the sensitivity of the power cost to the fluctuation of the model data. Upon comparision of the results with the power cost of the fossil power plants in Korea, it is found that the nuclear power is economically preferred to the fossil power. Nevertheless, the turnkey contract value of Go-ri unit 2 appears to be rather expensive compared with the available data on the construction cost of the PWR plants. Therefore, it is suggested that, in order to make the nuclear power plants more attractive in Korea, the unfavorable contract of such kind must be avoided in the future introduction of the nuclear power plant. Capacity factor is of prime importance to achieving the economic generation of the nuclear electricity from the Go-ri plant. Therefore, it is concluded that more efforts should be directed to make the maximum use of the Go-ri plant.

  • PDF

A Study on the Cost Benefit Analysis Model of Vessel Traffic Services(II) (선박교통관리제도의 비용편익분석모델에 관한 연구(II))

  • 정재용;박진수
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.7 no.3
    • /
    • pp.29-40
    • /
    • 2001
  • The introduction of coastal vessel traffic services enables vessels in coastal waters to navigate in safety or to get her position with ease and prevents the vessel from becoming cause of casualties. But it needs relatively huge amount of cost to construct and operate and maintain. Thus we must be checked with economical adequacy of the the proposed coastal vessel traffic services by comparing the cost of the construction, operation and maintenance with the expected benefit made by the expected decrease in marine casualties. In previous paper, a proper cost-benefit analysis model for the Korean practice will be suggested. In this Paper, the proposed the cost-benefit analysis model of coastal vessel traffic services was applied to the Koje coastal waters 20mi1es from the top of Maemul-Do and Yokchi-Do. As the result, we confirmed the propriety of the cost-benefit analysis with the application of the proposed model to Koje waters. Also, it is verified that the introduction of coastal vessel traffic services, as proposed, is adequate and economical. The cost-benefit analysis model proposed in this study could be used to investigate the economic Propriety of new aids to navigation and traffic safety facilities in the future.

  • PDF

Optimum Operation of a PVDF-type Hollow Fiber Membrane Bioreactor for Continuous Sewage Treatment

  • Shin, Choon-Hwan
    • Journal of Environmental Science International
    • /
    • v.19 no.11
    • /
    • pp.1315-1322
    • /
    • 2010
  • A membrane bioreactor (MBR) was designed using polyvinylidene fluoride(PVDF)-type hollow fiber membrane modules with a treatment capacity of 10 ton/day. A pilot plant was installed in a sewage treatment plant and was operated with an intermittent aeration method which avoids any concentration gradient of suspended solids (SS) in the MBR. For continuous operation, the pilot plant was first tested with influent (mixed liquor suspended solid:MLSS of 1000-2000 mg/L) of aeration tanks in the sewage treatment plant. The MBR was pre-treated with washing water, 10% ethanol solution, 5% NaOCl solution and finally washing water, one after another. To demonstrate the effect of the MBR on sewage treatment, compared with conventional activated sludge processes, we investigated the relationships among permeate amount (LMH), change in operation conditions, influent MLSS level and sludge production. It was found that the optimum aeration rate and suction pressure were $0.3\;m^3$/min and 30~31 cmHg, respectively. Under stable conditions in aeration, suction pressure, influent flow rate and drainage, the SS removal efficiency was more than 99.99% even when the MLSS loading rate changes. Compared with conventional activated sludge processes, the MBR was more effective in cost reduction by 27% based on permeate amount and by 51.5% on sludge production.

A study on automatic selection of optimal cutting condition on machining in view of economics (기계가공시 분당가공비를 고려한 최적 절삭 조건에 관한 연구)

  • 이길우;이용성
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.14 no.6
    • /
    • pp.113-126
    • /
    • 1992
  • Recently the multi-kind, small-amount manufacturing system has been replacing the mass manufacturing system, and domestic machining inustry also is eager to absorb the new technology because of its high productivity and cost reduction. The optimization of the cutting condition has been a vital problem in the machining industry, which would help increase the productivity and raise the international competitiveness. It is intended in this study to investigate the machining costs per unit time which is essential to the analysis of the optimal cutting condition, to computer the cutting speed that lead to the minimum machining costs and the maximum production to suggest the cutting speed range that enables efficient speed cutting, and to review the machining economy in relation to cutting depth and feed. Also considered are the optimal cutting speed and prodution rated in rrelation with feed. It is found that the minimum-cost cutting speed increases and the efficient cutting speed range is reduced as machining cost per unit time increases since the cutting speed for maximum production remains almost constant. The machining cost is also lowered and the production rate increases as the feed increases, and the feed should be selected to satisfy the required surface roughness. The machining cost and production rate are hardly affected by the cutting depth if the cutting speed stays below 100m/min, however, they are subject to change at larger cutting depth and the high-efficient speed range also is restricted. It can be established an adaptive optimal cutting conditions can be established in workshop by the auto-selection progam for optimal operation. It is expected that this method for choosing the optimal cutting conditions might contribute to the improvement of the productivity and reduced the cost. It is highly recommended to prepare the optimal cutting conditionthus obtained for future use in the programing of G-function of CNC machines. If proper programs that automatically select the optimal cutting conditions should be developed, it would be helpful to the works being done in the machine shops and would result in noticeable production raise and cost reduction.

  • PDF

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.