A study on the Construction Claims Between Parties Without Privity (국내 건설분쟁에서 비계약 당사자간의 건설분쟁에 관한 연구)

  • Yun Dae-Jung;Han Sung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.300-305
    • /
    • 2002
  • The construction project is a complex undertaking involving multiple participants. Conflicts are inherently natural in the construction projects and subsequently, a success of projects mainly depends on how well to cope with the conflicts. In the past, courts usually took the position that the professional's exposure in damages for negligent performance of any of his/her duties would not extend to strangers to the contractual arrangement. However, courts today generally reject that rationale which was earlier in vogue and protect architects, engineers, and contractors from being liable to third parties. It means that the lack of privity of contract could rarely protect a profession in a suit alleging the negligence or professional malpractice in preparing plans or specifications. The main goal of this paper is to enhance the understanding of the legal aspect of privity and to provide the trend of no-privity disputes through the analysis of lawsuit cases during the last 40 years. On the base of the analysis, importance of the third relationship and the liability in construction disputes is presented.

  • PDF

Finite Element Analysis of RF Coupler in Normal-Low Temperature (상온-저온 RF 커플러 유한요소해석)

  • Kim, Hansol;Lee, Hak Yong;Park, Chan;Lee, Jaeyeol;Lim, Dong Yeal;Yoo, Jeonghoon;Hyun, Myung Wook
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.38 no.10
    • /
    • pp.1101-1107
    • /
    • 2014
  • A heavy ion accelerator is a device that accelerates heavy ions in the radio frequency (RF) range. The electric field that flows into the RF cavity continuously accelerates heavy ions in accordance with the phase of the input electromagnetic wave. For the purpose, it is necessary to design a coupler shape that can stably transfer the RF wave into the cavity. The RF coupler in a heavy ion accelerator has a large temperature difference between the input port and output port, which radiates the RF waves. It is necessary to consider the heat deflection on the RF coupler that occurs as a result of the rapid temperature gradient from an ultra-low temperature about 0 K to a room temperature about 300 K. The purpose of this study was to improve the system performance through an analysis of the intensity of the output electric field and temperature distribution considering various shapes of the RF coupler, along with an analysis of the durability considering the heat deflection and heat loss.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

Introduction of International Cooperation Project, DECOVALEX from 2008 to 2019 (2008년부터 2019년까지 수행된 국제공동연구 DECOVALEX 소개)

  • Lee, Changsoo;Kim, Taehyeon;Lee, Jaewon;Park, Jung-Wook;Kwon, Seha;Kim, Jin-Seop
    • Tunnel and Underground Space
    • /
    • v.30 no.4
    • /
    • pp.271-305
    • /
    • 2020
  • An effect of coupled thermo-hydro-mechanical and chemical (THMC) behavior is an essential part of the performance and safety assessment of geological disposal systems for high-level radioactive waste and spent nuclear fuel. Furthermore, numerical models and modeling techniques are necessary to analyze and predict the coupled THMC behavior in the disposal systems. However, phenomena associated with the coupled THMC behavior are nonlinear, and the constitutive relationships between them are not well known. Therefore, it is challenging to develop numerical models and modeling techniques to analyze and predict the coupled THMC behavior in the geological disposal systems. It is also difficult to verify and validate the development of the models and techniques because it requires expensive laboratory tests and in-situ experiments that need to be performed for a long time. DECOVALEX was initiated in 1992 to efficiently develop numerical models and modeling techniques and validate the developed models and techniques against the lab and in-situ experiments. In Korea, Korea Atomic Energy Research Institute has participated in DECOVALEX-2011, DECOVALEX-2015, and DECOVALEX-2019 since 2008. In this study, all tasks in the three DECOVALEX projects were introduced to the researcher in the field of rock mechanics and geotechnical engineering in Korea.

A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge (교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구)

  • Kang, Jong-Min;Lee, Dong-Youl;Park, Jong-Bum;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.3-11
    • /
    • 2012
  • The most of domestic bridge has an used life under 30 years, Future maintenance budgets can be expected to increase. However, because of bridge maintenance budgets are limited, demand for asset management being performed to achieve required performance within available budget is increasing. To perform effective asset management of bridges should be made the best use of information to occur in all phase of construction project. Therefore, the development of system and DB is required to support asset management by effective information management. The objective of this study is the development of the BIM-based bridge asset management model. Through previous research survey, BIM capabilities and asset management components were established and mutual linkages were examined. Bridge asset management model was composed of alternate assessment model. In addition, BIM-based asset management model was performed case studies to verify feasibility and applicability. The proposed model can be applied to a current bridge maintenance procedures and supported to perform effective bridge maintenance tasks within a limited budget.

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Development of an Economic Material Selection Model for G-SEED Certification (녹색건축(G-SEED) 인증을 위한 경제적 자재선정 모델 개발)

  • Jeon, Byung-Ju;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.6
    • /
    • pp.613-622
    • /
    • 2020
  • The South Korean government plans for a 37 % reduction in CO2 emissions against business as usual by 2030. Subsequently, the Ministry of Land, Infrastructure and Transport declared a 26.9 % reduction target in greenhouse gas emissions from buildings by 2020 and established the Green Standard for Energy and Environmental Design (G-SEED) to help improve the environmental performance of buildings. Construction companies often work with consulting firms to prepare for G-SEED certification. In the process, owing to inefficient data sharing and work connections, it is difficult to achieve economic efficiency and obtain certification. The objective of this study was to develop an economic model to assist contractors in achieving the required G-SEED scores for materials and resources. To do this, we automated the process for material comparison and selection on the basis of an analysis of actual consulting data, and developed a model that selects material alternatives that can meet the required scores at a minimum cost. Information on materials is input by applying a genetic algorithm to the optimization of alternatives. When the model was applied to actual data, the construction cost could be lowered by 79.3 % compared with existing methods. The economical material selection model is expected to not only reduce construction costs for owners desiring G-SEED certification but also shorten the project design time.

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

Standard Procedures and Field Application Case of Constant Pressure Injection Test for Evaluating Hydrogeological Characteristics in Deep Fractured Rock Aquifer (고심도 균열암반대수층 수리지질특성 평가를 위한 정압주입시험 조사절차 및 현장적용사례 연구)

  • Hangbok Lee;Chan Park;Eui-Seob Park;Yong-Bok Jung;Dae-Sung Cheon;SeongHo Bae;Hyung-Mok Kim;Ki Seog Kim
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.348-372
    • /
    • 2023
  • In relation to the high-level radioactive waste disposal project in deep fractured rock aquifer environments, it is essential to evaluate hydrogeological characteristics for evaluating the suitability of the site and operational stability. Such subsurface hydrogeological data is obtained through in-situ tests using boreholes excavated at the target site. The accuracy and reliability of the investigation results are directly related to the selection of appropriate test methods, the performance of the investigation system, standardization of the investigation procedure. In this report, we introduce the detailed procedures for the representative test method, the constant pressure injection test (CPIT), which is used to determine the key hydrogeological parameters of the subsurface fractured rock aquifer, namely hydraulic conductivity and storativity. This report further refines the standard test method suggested by the KSRM in 2022 and includes practical field application case conducted in volcanic rock aquifers where this investigation procedure has been applied.

A Study on General Contractors' Control Measures for Construction Cost Overrun (종합건설사 현장의 원가초과 억제 방안 분석에 관한 연구)

  • Park, Jee Young;Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.