• Title/Summary/Keyword: IS project

Search Result 14,717, Processing Time 0.033 seconds

Quantitative Management for IT Program in Pubic Sector

  • Ra, Jong-Hei;Choi, Kwang-Don
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.257-267
    • /
    • 2004
  • This study presents methodology framework that can help to manage IT program in the public sector. Existing project management methods usually focus on system providers and could have various and abstract interpretations. So, it is difficult to apply existing project management methods in the public sector. It also makes each individual project management easier by reflecting characteristics of IT project so that it can provide management models of performance measurement. It is found that given framework in management methodology get positive analysis and addition to be applied in the individual project management and various IT programs nationwide. It is expected that scientific and systematic project management can bring successful promotion and management of IT project through the application of this project management methodology.

  • PDF

A Risk Analysis Model Using VERT for R & D Project Management (R & D 프로젝트의 위험분석모형의 연구)

  • 황홍석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.85-99
    • /
    • 1995
  • Increasingly, risk analysis is becoming important ingredients in achieving the successful implementation and application in the area of the project management. The project management system is designed to manage or control the project resources on a given activity within time, cost and performance so called TPPM (Total Productive Project Management). In this research, a risk analysis model misproposed to identify potential problem areas, quantify the risks, and generated the chice of the action that can be taken to reduce the risk. In addition two analysis models are proposed : 1) risk factor model and 2) network simulation model using VERT (Venture Evaluation and Review Technique ). The objective of the remodels is to estimate the schedule, cost performance risks. These proposed quantitative models for project risk analysis are proving its value for the project managers who need to assess the risk of changes in cost, schedule, or performance. The proposed models will be used in the area of project selection, evaluation and the allocation of project resources.

  • PDF

The Project Managers' Competency by Leadership Style to Succeed the IT Projects (IT프로젝트 관리자의 리더십 유형별 역량이 프로젝트 성과에 미치는 영향)

  • Kim, Wha-Young;Kang, So-Ra
    • Journal of Information Technology Services
    • /
    • v.7 no.2
    • /
    • pp.95-111
    • /
    • 2008
  • The objective of this study is to suggest the effects of the fit between project managers' competency and leadership style on the performance of IT projects. Also, this study examine that the project duration among the project's characteristics moderates the impact of the managers' competency and leadership style on the performance of IT projects. As the results of analysis, we found that the participative leadership and the supportive leadership of project manager is affected by the human and the conceptual skills, and the directive-achievement leadership is affected by the technical skills positively. The project duration moderates the impact of the fit between the participative leadership and the technical skills. and the fit between the directive-achievement leadership and the technical and the human skills positively.

An Economic Analysis of Greenhouse Horticulture in Kyungsangnam-do (시설원예 농업의 경제성과 전망)

  • Lee Young Man
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 1998.10a
    • /
    • pp.41-67
    • /
    • 1998
  • This study aimed at examining the investment and economic analysis of greenhouse horticultural project area by governmental subsidy project. There were only 5 project areas that economic efficiency of investment is recognized in 30 project area in Kyungsangnam-do. And there are 7 project areas to gain farm firm revenue. These were possible area to develop to farm firm. There are 4 project areas to gain farm firm revenue in 18 project areas of glass greenhouse area, and 8 project areas to gain farm firm revenue in 12 project areas-vinyl greenhouse area. The rate of return of the fixed capital is higher in the vinyl greenhouse area than in the glass greenhouse area by type of greenhouse. There were cultivated tomatoes, cucumbers, peppers, etc. in the greenhouse area. The investment efficiency of the fixed capital is higher in cucumber and pepper than in other vegetables. Flowers a re lower than the vegetable in investment efficiency.

  • PDF

QUANTITATIVE ANALYSIS FOR THE RISK MANAGEMENT OF A SUPER-HIGHRISE RESIDENCE

  • Shuzo Furusaka;Takashi Kaneta;Makoto Ohsaki;Kazunori Harada;Yasuhiro Orita;Sohsuke Arai;And Norikazu Katoh
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.748-753
    • /
    • 2005
  • In a super-highrise residence project, a project manager needs to form the long-term risk management plan which covers the problems from the beginning of project to the time of demolition. The cause and responsibility for a risk are clarified and quantitatively evaluated through the life cycle of a project. Development of the system which supports a risk strategy effectively is needed as a project becomes complex. In this paper, through the life cycle of a specific super-highrise residence project, a risk phenomenon is specified from a viewpoint of each participant, and the mathematical model is formulated choosing the combination of the optimal strategy against a risk quantitatively within a fixed risk strategy budget.

  • PDF

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction (프로젝트 관리 정보시스템 품질이 프로젝트 성과와 사용자 만족도에 미치는 영향)

  • Park, So-Hyun;Lee, Taewon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.50-60
    • /
    • 2018
  • The use of Project Management Information System (PMIS) is increasing in project management industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project performance. However, how much and which parts of project management performance are affected by PMIS still need to be studied further. The purpose of this study is to investigate the impact of PMIS quality on project management performance. We collected data from various project based industries such as construction, defense, manufacturing, software development and telecommunication by using survey questionnaire. PMIS quality was measured in three dimensions. They are system quality, information quality and service quality. Project management performance was measured in nine variables such as time reduction, work accuracy, cost management, etc. Statistical analyses such as multiple regression were used to analyze the data. The results showed that PMIS quality had significant impacts on the project management performance and user satisfaction. It was notable that only two dimensions out of the three PMIS quality dimensions, system quality and information quality, affected the project management performance. Also, it was found that PM performance played a mediating role between PMIS and user satisfaction, and between PMIS and reuse intention. The contribution of this research is that it helps to clarify what aspects of PMIS affect the project management performance and user satisfaction.

Efficiency Analysis of Project Management Offices Using Bootstrap DEA (부트스트랩 자료포락분석을 이용한 프로젝트 관리 조직의 효율성 분석)

  • Ko, Joong-Hoon;Park, Sung-Hun;Bae, Eun-Song;Kim, Dae-Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.61-71
    • /
    • 2018
  • The purpose of this study is to analyze the efficiencies of project management offices in large information system construction projects using the data envelopment analysis. In addition, we tried to estimate the confidence interval of those efficiencies using bootstrap DEA to give a statistical meaning. The efficiency by the CCR model is analyzed as eight project management offices are fully efficient and 22 project management offices are inefficient. On the other hand, there are 15 project management offices are fully efficient, but 15 project management offices are inefficient in the BCC model. As the result of the scale efficiencies, of the inefficient project management offices, 13 project management offices are inefficient in scale. It is possible to eliminate the inefficiency in the CCR model by improving their project performances. And, the nine project management offices showed that the inefficiency was due to pure technical efficiency, and these companies should look for various improvements such as improvement of project execution system and project management process. In order that the inefficient project management offices be efficient, it is analyzed that more efforts must be made for on-budget and on-time as a result of examining the potential improvement potentials of inefficient project management offices.

A Field Study on the Loss Factors of IS Development Project in the Public Sector: Perspectives of Project Management (공공부문 IS 개발 프로젝트 손실요인에 대한 현장연구: 프로젝트 관리를 중심으로)

  • Jang, Sung-Bong
    • Journal of Information Technology Services
    • /
    • v.3 no.2
    • /
    • pp.65-84
    • /
    • 2004
  • This research analyzes the causes of delay and resulting additional expenses on the IS project in the public sector, and then proposes some solutions to the problem. Through a field study, the research found that the causes include employer's attitude, the leadership and risk management ability of the project manager, and qualifications of project members. In order to avoid those problems, the project manager should secure various communication channels and good relationship between the employee and the contractor.