• 제목/요약/키워드: IS Assessment

검색결과 22,592건 처리시간 0.047초

Comparing the Use of Self and Peer Assessment: A Case Study in a Statistics Course

  • Han, Kyung-Soo;Mun, Gil-Seong;Ahn, Jeong-Yong
    • Communications for Statistical Applications and Methods
    • /
    • 제16권6호
    • /
    • pp.979-987
    • /
    • 2009
  • In this study, we compare the assessments made by self, peer and instructor in a statistics course. The goal is to investigate the following two questions: (1) Is it reasonable or fair to expect students to be responsible for assessing the work of their colleagues and themselves? (2) What are students' opinions about the learning effect after they participate in the assessment process? As part of the study investigating these questions, we designed a prototype for a Web-based assessment tool and a procedure to apply the assessment techniques in a statistics course. In addition, we collected and analyzed the data produced in the assessment processes from students and the instructor. The analysis results are summarized as follows: First, self assessment was not accord with instructor assessment, but peer assessment was similar to the assessment by instructor. This result reflected that it is reasonable or fair to expect students to be responsible for assessing the work of their colleagues. Second, peer assessment of their colleagues successfully helped students increase their understanding of the course, and the students increased their skills in the actual assessment process by assessing the work of their colleagues. Finally, many students indicated a high interest level on the assessments.

성찰저널을 활용한 프로그램 학습성과 평가체계 개발 (A Study on the Development of Program Outcomes Assessment System using Reflection Journal)

  • 이영태;임철일
    • 공학교육연구
    • /
    • 제16권3호
    • /
    • pp.42-50
    • /
    • 2013
  • The main purpose of this study was to develop a program outcomes assessment tool using reflection journal. Reflection journal has recently come to gain more attention from school as an alternative assessment tool. Although numerous studies reconfirmed the educational importance and value of reflection journal as an assessment tool, research on the assessment tool of the engineering accreditation, based on education view is scarce. After literature reviews about the case studies on the program outcomes assessment, this study, to analyse the current assessment tools, and then, examined the educational implications of reflection journal as a program outcomes assessment tool. This study suggested the assessment tool using reflection journal for PO6 (teamwork) and PO11 (engineering ethics), one of the most important assessment items in engineering accreditation. In this study, we used the performance criteria, assessment criteria, rubric, and closed the loop to measure the teamwork and engineering ethics. The result of this study is significant in terms of guiding the future evaluation system development for program outcomes.

신환경영향평가기술(新環境影響評價技術)의 개발방향(開發方向) (New Environmental Impact Assessment Technology)

  • 한상욱;이종호;남영숙
    • 환경영향평가
    • /
    • 제9권4호
    • /
    • pp.277-290
    • /
    • 2000
  • The purpose of this study is to identify the problems of environmental impact assessment(EIA) and to suggest new EIA technology. The problems of EIA in Korea can be summarized as follows. First, the EIA does not reflect the impact of policy, plan and program on environment. Second, the project EIA does not consider the cumulative impacts such as additive impacts, synergistic impacts, threshold/saturation impacts, induced and indirect impacts, time-crowded impacts, and space-crowded impacts. Third, the EIA techniques in Korea are not standardized. Finally, the present EIA suggests only alternatives to reduce adverse impacts. To solve above-mentioned problems, the development of new EIA technology is essential. First, the new EIA technology should be developed toward pollution prevention technology and comprehensive and integrated environmental management technology. Second, new fields of EIA for pollution prevention contain strategic environmental assessment, cumulative impacts assessment, socio-economic impact assessment, cyber EIA and EIA technology necessary after the reunification of Korean Peninsula. Third, EIA technology for integrated environmental management contains the development of integated environment assessment system and the development of packaged EIA technology. The EIA technology for integrated environmental assessment system contains (1) development of integrated impact assessment technology combining air/water quality model, GIS and remote sensing, (2) integrated impact assessment of EIA, traffic impact assessment, population impact assessment and disaster impact assessment. (3) development of integrated technology combining risk assessment and EIA (4) development of integrated technology of life cycle assessment and EIA, (5) development of integrated technology of spatial planning and EIA, (6) EIA technology for biodiversity towards sustainable development, (7) mathematical model and GIS based location decision techniques, and (8) environmental monitoring and audit. Furthermore, there are some fields which need packaged EIA technology. In case of dam development, urban or industrial complex development, tourist development, landfill or combustion facilities construction, electric power plant development, development of port, road/rail/air port, is necessary the standardized and packaged EIA technology which considers the common characteristics of the same kind of development project.

  • PDF

지속성을 위한 보건영향평가의 국제적인 동향 고찰 및 환경영향평가와의 연계방안 연구 (Studies for International Trends in Health Impact Assessment and Linking HIA and EIA)

  • 김임순;김충곤;강선홍;한상욱
    • 환경영향평가
    • /
    • 제14권5호
    • /
    • pp.275-289
    • /
    • 2005
  • In Korea, health-related items under current EIA (Environmental Impact Assessment) system can only be found in the categories of hygiene and public health. However, environment and public health are not adequately connected and also health is underestimated even though health is an important component of environmental assessments. As a result, health is not well integrated within criteria for investigating the impacts on environment. International trends in HIA (Health Impact Assessment) to strengthen the connection between environment and health were investigated in this research. Definitions, functions, circumstances, and merits of HIA in foreign countries were compared. By collecting and analyzing international organizations' and other countries' data related with HIA and EIA, preceding conditions and execution plans were suggested to link EIA and HIA from SEA (Strategic Environmental Assessment) aspects and to successfully accomplish EIA in Korea. According to this research, EHIA (Environmental Health Impact Assessment) can predict and manage the results of economical development only under the principles of inhabitants' participation, sustainability, and social justice. EHIA should be modified and improved towards increasing regional and national capabilities. For this, preparation of adequate procedure is required to connect EIA and HIA.

원자력발전소의 주관적 업무량 평가를 위한 평가 항목 개선 (An Improvement of Evaluation Items for a Subjective Workload Assessment in Nuclear Power Plants)

  • 박재규;이용희
    • 대한인간공학회지
    • /
    • 제29권4호
    • /
    • pp.687-691
    • /
    • 2010
  • Workload assessment is one of the important elements of the human factors evaluation for the nuclear power plants in operation. This paper describes a further study upon the additional elements of the workload which elements should be considered in the subjective workload assessment. We have tried to predict the burden of the work and to improve the work through a comparison of the objective workload and the subjective workload in the previous studies in nuclear power plants. However, there is a restriction to perform a precise assessment because of the limitations of the method itself. The objective workload assessment is performed by relative comparison using the quadrant analysis with objective workload and subjective workload because there were no clear criteria of objective workload assessment. And the subjective workload assessment is performed by NASA-TLX (NASA Task Load Index) which includes six evaluation dimensions of subjective workload. NASA-TLX is difficult to grasp the other aspects that could influence on the subjective workload because the analysis relies on predetermined assessment items. We conduct a factor analysis between the factors that affect the workload and the assessment adopted from ISO 10075 and NASA-TLX. At the same time, this study suggests other evaluation elements which can be added for subjective workload assessment except for evaluation elements of NASA-TLX.

환경평가 대상지역의 설정방안에 대한 연구 (A Study for Target Area Set-up Plan of Environmental Assessment)

  • 선효성;최준규
    • 환경영향평가
    • /
    • 제21권2호
    • /
    • pp.247-254
    • /
    • 2012
  • This paper seeks for the set-up plan in the reasonable target area of environmental assessment. Domestically, the target area of environmental assessment is set up by the adjustment of opinion collection about the assessment scope result of an environmental factor. In a foreign country, the boundary of the target area for a development project is established with the environmental, economical, and social viewpoint based on the standard for significantly environmental impact. Based on the analysis of the present condition at home and abroad, the first set-up plan for the reasonable target area of environmental assessment is the preparation of the detailed term definition related to the target area of environmental assessment. The second is the arrangement of the judgement standard for significantly environmental impact. The quantitative assesment item can apply the present standard or regulation, and the qualitative assessment item can establish the standard based on factual and objective data. The last is the preparation of the reference material or the guideline for deciding the initial target area by the judgement standard and determining the final target area by opinion collection in the stage of scoping.

우리 나라의 도시생태계 평가제도 고찰 (Study on Assessment Institution of Urban Ecosystem in Korea)

  • 오충현
    • 한국환경생태학회지
    • /
    • 제16권2호
    • /
    • pp.188-194
    • /
    • 2002
  • 우리 나라의 도시생태계 평가제도는 도시계획법에 의해 시행되는 제도와 환경관련떱에 의해 시행된는 제도로 구분된다. 도시계획법에 의한 평가제도는 개발행위허가기준과 도시계획 환경성검토가 있으며, 환경관련법에 의해 시행되는 제도는 환경영향평가와 사전환경성검토가 있다. 도시생태계 평가제도는 그 동안 개발지향적인 토지이용정책으로 인해 체계적인 발달이 이루어지지 않았으며, 평가기법도 입목본수도 및 녹지자연도 등을 제외하고는 객관적인 평가기법이 개발되지 알았다. 또한 평가 결과 보전가치가 높은 지역에 대한 보전대책 및 계획과정과 사후에 대한 평가가 부족하다는 문제점을 가지고 있다 우리 나라의 도시생태계 평가제도가 활성화되기 위해서는 다음과 같은 개선방안 마련이 필요하다. (1) 비오톱지도와 같은 객관적인 도시생태계 평가기법 개발, (2) 평가결과 보전가치가 높은 지역에 대한 보전지구 지정 및 훼손에 대한 보상 방안 마련, (3) 도시개발계획과 생태계 보전계획 수립의 병행 및 사후평가 시행

기술의 장기평가(Technology Assessment)에 관한 방법론적 고찰

  • 이진주
    • 한국경영과학회지
    • /
    • 제4권2호
    • /
    • pp.23-33
    • /
    • 1979
  • Technology assessment has drawn enormous amounts of various attention as well as participation mostly in industrialized countries. This paper deals with the implications of technology assessment especially in newly developed countries. Firstly, definition and present status of technology assessment are depicted. Secondly, methodology of technology assessment is reviewed in detail at two different levels; one is the methodology at procedural or epistemological level and the other is the methodology at specific or particular level. Finally, policy recommendations and suggestion concerned with the activity of technology assessment in Korea are presented.

  • PDF

터널공사에서의 안전영향평가의 적용 (The Application of Safety Impact Assessment to Tunnel Construction)

  • 김병식;최봉준;서종원
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.545-548
    • /
    • 2008
  • In this study, the concept of safety impact assessment to achieve 'Design-for-Safety' in design phase is introduced. For this purpose, safety impact assessment model was devised and a methodology using the risk-based safety impact assessment approach for NATM of tunnel projects is suggested. The suggested methodology includes safety information survey, classification of safety impact factors caused by design and construction, and quantitative estimation of magnitude and frequency of safety impact factors. A real-world case study on the safety impact assessment of a tunnel construction project is also provided in the paper.

  • PDF

수행평가 과제 제작의 모형 및 준거에 관한 연구 (Study on the Development of Model and Criteria of Performance Assessment Task to Elementary Mathematics)

  • 유현주
    • 대한수학교육학회지:수학교육학연구
    • /
    • 제8권1호
    • /
    • pp.163-182
    • /
    • 1998
  • Performance assessment is one of the authentic assessment method that are consistent with new curriculum goal, concentrated on the process rather than the results of problem solving. But the key to good assessment is matching the assessment task to intended objectives. Based on the review of literatures, the current performance assessment task was critically analysed. As a result, this study developed appropriate model and criteria of performance assessment task to elementary mathematics.

  • PDF