• 제목/요약/키워드: IMPLEMENTATION PLAN

검색결과 1,285건 처리시간 0.028초

기후변화영향평가제도 시행 방안 (Implementation Methods for Climate Change Impact Assessment)

  • 이영수;이승현;최상기
    • 환경영향평가
    • /
    • 제27권4호
    • /
    • pp.345-352
    • /
    • 2018
  • 기후변화 적응 주류화를 위하여 세 가지 기후변화영향평가 시행 방안을 검토하였다. 첫째, 신법 마련 및 개별 시행, 둘째, 신법 마련 및 환경영향평가 틀 내 제도 시행, 셋째, 기존 환경영향평가 틀 내 시행하는 것이다. 이 논문에서는 세 가지 방안의 내용, 장 단점을 분석하였다. 그리고 신법 하에서 제도를 개별 시행할 경우의 개략적인 평가 내용과 환경영향평가 틀 내에서 시행하고자 할 경우 관련 법률, 규정개정(안)을 제안하였다.

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

수산자원조성사업의 합리적인 평가체계 도입 방안에 관한 연구 (A Study on Establishing the Evaluation System of the Stock Enhancement Program)

  • 김대영;류정곤;이정삼
    • 수산경영론집
    • /
    • 제41권1호
    • /
    • pp.1-24
    • /
    • 2010
  • The main goal of the study is to propose an objective and standardized evaluation system of stock enhancement programs. In order to achieve this goal, the study first suggested the need for stock enhancement program evaluation system through the review of current status and problems. Second, the study identified possible problems of the existing stock enhancement program evaluation by reviewing domestic and foreign evaluation systems. Finally the study proposed a new evaluation system and implementation plan of it. This study also classified the program evaluation criteria into ex-ante evaluation and ex-post evaluation according to the evaluation point in time, and applied the economic, political and technical feasibility tests into the evaluation of the stock enhancement program in order to solve the current problems of the evaluation. The evaluation process of the stock enhancement program is composed of an evaluation system design, estimation of weights using the analytical hierarchy process, design of estimation standard, conversion of scores and final summary of the evaluation. The central government takes the lead in the evaluation of the regional (metropolitan city or province) projects and the regional government is in charge of the evaluation of the local (city or county) projects. For the implementation of the ex-ante evaluation, either the regional or local governments ask for the evaluation and then submit an evaluation plan and other necessary documents to the upper level governments. The ex-post evaluation is then carried out by the upper level governments.

Institutional Applications of Eclipse Scripting Programming Interface to Clinical Workflows in Radiation Oncology

  • Kim, Hojin;Kwak, Jungwon;Jeong, Chiyoung;Cho, Byungchul
    • 한국의학물리학회지:의학물리
    • /
    • 제28권3호
    • /
    • pp.122-128
    • /
    • 2017
  • Eclipse Scripting Application Programming Interface (ESAPI) was devised to enhance the efficiency in such treatment related workflows as contouring, treatment planning, plan quality measure, and data-mining by communicating with the treatment planning system (TPS). It is provided in the form of C# programming based toolbox, which could be modified to fit into the clinical applications. The Scripting program, however, does not offer all potential functionalities that the users intend to develop. The shortcomings can be overcome by combining the Scripting programming with user-executable program on Windows or Linux. The executed program has greater freedom in implementation, which could strengthen the ability and availability of the Scripting on the clinical applications. This work shows the use of the Scripting programming throughout the simple modification of the given toolbox. Besides, it presents the implementation of combining both Scripting and user-executed programming based on MATLAB, applied to automated dynamic MLC wedge and FIF treatment planning procedure for promoting the planning efficiency.

철도 소프트웨어 개발 및 검증을 위한 지침 (The guideline for development and verification of railway software)

  • 이영준;최종균;차경호;천세우;이장수;권기춘;정의진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.659-664
    • /
    • 2008
  • The Railroad Safety Act's regulation reads as follows. "The Minister of Construction and Transportation may qualify and authorize the product to guarantee performance and safety of parts, machine, and device used in Railway fields." Another regulation reads as follows."“The guidelines about targets, standards, and procedures of Quality and Authority in first provision are decided as Ministry of Construction and Transportation Decree." The software used in rail cars and facilities is considered as a railway product. Therefore, it is qualified and authorized for acquiring the safety of rail cars and facilities. The software businesses shall again a Quality and Authority for applying a software to the rail cars and facilities. This paper regulates some guidelines that are needed to develop a software. The procedures that a software developer performs are divided by plan, requirement, design, implementation, and maintenance. The procedures that a software verification person performs are classified by verification plan, requirement verification, design verification, implementation verification, testing verification, maintenance verification, and safety activity. The entire processes and detailed activities to develope and verify a software are described as new guidelines.

  • PDF

E-Navigation을 위한 항만 정보네트워크 구현방안 (Implementation Plan of Port Information Network for an E-Navigation)

  • 서기열;오세웅;조득재;박상현;서상현
    • 한국정보통신학회논문지
    • /
    • 제10권11호
    • /
    • pp.1927-1933
    • /
    • 2006
  • 본 논문에서는 이네비게이션(E-Navigation)의 기반이 될 수 있는 정보 네트워크의 구현방안을 제시한다. 정보통신 기술을 이용하여 E-Navigation 정보네트워크의 기반이 되는 네트워크 체제를 구성하고, 해상교통지원시스템을 정비함과 동시에 종합적인 항만 정보네트워크를 구축한다. 그리고 항만관련 종사자에게 선박간, 선박과 육상간 무선 네트워크 이용을 권고하여 그 효율성을 확대할 것이다. E-Navigation을 위한 정보네트워크의 구축은 항만의 물류흐름과 교통안전을 위하여 초고속 무선인터넷 인프라를 구축하는 것으로서, 해상에서의 적용이 더욱 효과적인 무선 정보네트워크 인프라를 항만 내에 도입하는 것 다. 인터넷이 가지 고 있는 무한한 잠재성, 응용성, 공유성을 이용하므로 해상 교통 흐름 및 교통안전에 획기적 인 변화를 가져올 수 있을 것이다.

춘천시 청소년 노동인권 조례 현황 및 개선 연구 (A Study on the Current Status and Improvement of the Youth Labor Rights Ordinance in Chuncheon City)

  • 김태인;권종욱;박상문
    • 아태비즈니스연구
    • /
    • 제12권1호
    • /
    • pp.165-182
    • /
    • 2021
  • Purpose - The purpose of this study is to compare and analyze the ordinances of other local governments to propose implications and improvement plans for the ordinances of Chuncheon City. To this end, cases of overseas legislation related to youth labor rights, domestic laws and major policies of the central government were reviewed. Design/methodology/approach - This study mainly utilized literature research methods. In addition, it was based on foreign laws and case analysis, domestic laws and ordinances, and preceding research and data related to government policies. Findings - Chuncheon city ordinances are superior to those of other local governments. However, the details of the establishment of the implementation plan, the actual condition survey, and the establishment of the consultation system are included in the project contents of Article 6, so it is not concrete and clear. And there were no articles related to the labor environment check. Research implications or Originality - It is proposed to make the contents of the establishment of an implementation plan, survey, and consultation system as independent provisions. It is also proposed to establish a new article related to the youth labor environment check. In addition, it is desirable to establish detailed regulations by establishing the ordinance enforcement regulations.

프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로 (Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects)

  • 정설림;김대철
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

친환경양식어업육성 민간보조사업의 활성화 방안 (A Study on the Revitalization of the Private Subsidy for Environmentally Friendly Aquaculture)

  • 김국주
    • 수산경영론집
    • /
    • 제50권4호
    • /
    • pp.45-57
    • /
    • 2019
  • Effective implementation of private subsidy projects requires comprehensive expertise in the aquaculture and construction sectors to be provided to private subsidy operators, local government officials and others involved in budget execution and settlement. Due to the strengthening of laws and systems related to the execution of state subsidies since 2015, the efficient implementation of private-sector grant projects has been difficult for delays in projects, cancellations, and conflicts with local governments from lack of prior awareness and understanding of related regulations. It is expected that the government will be able to activate the project by analyzing the current status and problems of each phase of project implementation for improving quality internalization of the project effects, as well as quantitative growth of the private sector subsidy project for environmentally friendly aquaculture development projects.