• 제목/요약/키워드: Hydroelectric power plant

검색결과 33건 처리시간 0.026초

소수력에 적용한 동기발전기와 유도발전기의 운전 특성 비교 (A comparison of the operating characteristics of the synchronous generator and induction generator applied to the small hydroelectric power plant)

  • 김종겸;김영국
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.55-60
    • /
    • 2014
  • In general, A synchronous generator is higher than the voltage stability of the induction generator. However, induction generator has many advantages rather than a synchronous generator in terms of price and maintenance. So, coverage rate of the induction generator is gradually increasing in small hydroelectric power station rather than 1000kW recently. In order to increase the penetration of induction generator, pre-analysis of the operation of the generator is needed. In this study, we analyzed for the problems that occur when synchronous generator and induction generator of 1500kW is connected to the distribution system.

시나리오 기반 수력플랜트 설비의 취약성 평가 (Scenario-based Vulnerability Assessment of Hydroelectric Power Plant)

  • 남명준;이재영;정우영
    • 한국방재안전학회논문집
    • /
    • 제14권1호
    • /
    • pp.9-21
    • /
    • 2021
  • 최근 신재생 에너지를 활용한 친환경 발전시설의 중요성이 대두되고 있으며 수력발전소는 매우 중요한 전력생산 및 공급원이다. 수력발전소는 일반적으로 대규모로 운용되고 다중 시설이 연계되어 있어 안전성 확보가 매우 중요하다. 본 연구에서는 이러한 수력플랜트 설비의 안전성을 평가하기 위해 시나리오 기반의 수충격에 따른 수압관로의 취약성 평가를 수행하였다. 자체 개발한 수충격 해석모델(TRANSHAM)과 기존 상용모델(SIMSEN)의 모의결과 및 모니터링 자료와의 비교를 통해 해석모델의 신뢰성을 검증하였고, 실제 운영중인 수력플랜트에 적용하여 발전설비 운영 중에 발생 가능한 수충격 시나리오를 구성하였다. 이를 바탕으로 시나리오 기반의 수압관로의 수충격 해석 및 취약성 평가를 수행하였다. 내·외부 로딩조건을 고려한 시나리오별 모의 결과, 발전설비 운영에 따라 수압관로의 취약성이 상이하게 나타났으며 내·외부 로딩조건의 조합에 따라 수압관로의 취약성에 큰 영향을 미치는 것으로 예측되었다. 본 연구에서 제시한 시나리오 기반의 해석기법은 향후 수충격에 따른 발전설비의 취약성을 평가하는데 정량적인 도구로 활용될 것으로 기대된다.

Effect of compressible membrane's nonlinear stress-strain behavior on spiral case structure

  • Zhang, Qi-Ling;Wu, He-Gao
    • Structural Engineering and Mechanics
    • /
    • 제42권1호
    • /
    • pp.73-93
    • /
    • 2012
  • With an active structural involvement in spiral case structure (SCS) that is always the design and research focus of hydroelectric power plant (HPP), the compressible membrane sandwiched between steel spiral case and surrounding reinforced concrete was often assumed to be linear elastic material in conventional design analysis of SCS. Unfortunately considerable previous studies have proved that the foam material serving as membrane exhibits essentially nonlinear mechanical behavior. In order to clarify the effect of membrane (foam) material's nonlinear stress-strain behavior on SCS, this work performed a case study on SCS with a compressible membrane using the ABAQUS code after a sound calibration of the employed constitutive model describing foam material. In view of the successful capture of fitted stress-strain curve of test by the FEM program, we recommend an application and dissemination of the simulation technique employed in this work for membrane material description to structural designers of SCS. Even more important, the case study argues that taking into account the nonlinear stress-strain response of membrane material in loading process is definitely essential. However, we hold it unnecessary to consider the membrane material's hysteresis and additionally, employment of nonlinear elastic model for membrane material description is adequate to the structural design of SCS. Understanding and accepting these concepts will help to analyze and predict the structural performance of SCS more accurately in design effort.

Water Lubricated Guide Bearing with Self-aligning Segments

  • Oguma, Tadashi;Nakagawa, Naritoshi;Mikami, Makoto;Thantrong, Long;Kizaki, Yasumi;Takimoto, Fumio
    • International Journal of Fluid Machinery and Systems
    • /
    • 제6권2호
    • /
    • pp.49-55
    • /
    • 2013
  • Water lubricated guide bearing was newly released and has been applied to actual hydro turbines with vertical shaft. As a result, they can have not only high bearing performance but environmental advantages in meeting the demand for reducing river pollution by oil leakage from oil lubricated guide bearing. The PTFE composite guide bearing was tested by experimental equipment operated under conditions similar to those of actual hydro turbines. Circumferential and axial tilting bearing segments help to improve the bearing performance and efficiency due to low friction loss in the bearing system. Furthermore, bearing cooling systems could be eliminated and maintenance periods could be extended, thus the initial investment and operating costs of the hydroelectric power plant are reduced.

관측 유량 자료를 이용한 소수력 잠재량 평가에 대한 사례연구 (Case Study : Assessment of Small Hydropower Potential Using Runoff Measurements)

  • 정성은;김진영;강용혁;김형수
    • 한국태양에너지학회 논문집
    • /
    • 제38권4호
    • /
    • pp.43-54
    • /
    • 2018
  • In this study, we assessed dependency of small hydropower potentials on the two different runoff such as the estimated runoff based on the rainfall amounts and measured runoff. The hydpropower potentials were evaluated using actural power generations taken from Deoksong, Hanseok, and Socheon small hydropower plants over Han and Nakdong river basins, respectively. As a result of comparing the actual power generation amount with the potential amount based on the rainfall amount and the estimated amount based on the observed flow amount by each small hydroelectric power plant, the degree of latent small hydro energy by the observed flow was confirmed to be high. It is confirmed that the potential hydroelectric power generation rate is estimated to be about average 30%Point higher than the actual generation amount as a result of the measured flow rate rather than using the rainfall amount. Based on this, a method for improving the degree of the actual generation amount is proposed.

통합운영체계의 DSA 적용 연구 (The Study on DSA of Intergrated Operating System)

  • 조남빈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2322-2324
    • /
    • 2002
  • Korea Water Resources Corporation (KOWACO) operates nine hydroelectric power stations on the Han River, Nakdong River, Geum River & Seomjin River Areas. KOWACO will take the lead in improving the efficiency of water resources supply in this parer, KOWACO Generation Intergrated Operating System(GIOS) project will improve the generating plant, hydraulic structures, switchgear, and station controls, alarms and services for unmanned remote controlled operation by modern intergraed SCADA system. Mordern SCADA is used to cover all computer systems designed to perform the following main functions: - to collect data from industrial plant devices. - to process and perform calculations on the collected. - to present collected and derived data on displays on. - to accept commands entered by human operators and act on them such as sending control commands to plant devices.

  • PDF

Technical feasibility study for power generation from a potential mini hydro site nearby Shoolini University

  • Pundir, Anil;Kumar, Anil
    • Advances in Energy Research
    • /
    • 제2권2호
    • /
    • pp.85-95
    • /
    • 2014
  • Small Hydro-Power (SHP) is an environmental friendly technology. Usually hydro power generation projects are viewed as constructing large dams and reservoirs but available new research and engineering techniques have helped hydro power generation without large dams and without large reservoirs. In India, there are several water installations, irrigation dams, canals, streams or running rivers not tapped to generate power. In these cases the existing system and facilities can help in generating power with less investment and time. This area is yet unexplored. Harnessing a stream for hydroelectric power is a major undertaking for the energy crises and the global issues to go green. In this technical note a potential site for mini hydro power plant nearby Shoolini University is identified and examined for the economic feasibility.

고압 회전계 부분방전 신호의 노이즈 특성 분석 (The Noise Pattern Analysis at Partial Discharge Signal of High Voltage Rotator)

  • 신희상;조성민;강철;김재철;강동식;조국희
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 추계학술대회 논문집
    • /
    • pp.287-290
    • /
    • 2007
  • This study examines the characteristics of noise occerred at a hydroelectric power plant by using the on-line partial discharge measured by eletrical detecting method under the high voltage rotating machines. In addition, it analyzes the noise pattern into frequency and its scale component by using the FTT technique.

  • PDF

A watching system of a person entering a restricted area by image processing

  • Akimoto, Tadashi;Akizuki, Kageo;Kawamura, Mamoru
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1994년도 Proceedings of the Korea Automatic Control Conference, 9th (KACC) ; Taejeon, Korea; 17-20 Oct. 1994
    • /
    • pp.6-11
    • /
    • 1994
  • For a safety supervision, watching a restricted area so that no one go there is very important. This has been mostly accomplished by people. They keep an eye on many monitors at onece for a long time. It, however, is too simple and boring to concentrate it for a long time. So it's worth while to construct a watching system by image processing. And the system we made is now actually working at a certain hydroelectric power plant and some other restricted areas in Japan.

  • PDF

Soft Sedimentary Rock Slopes Design of Diversion Tunnel

  • Jee, Warren Wangryul
    • 한국암반공학회:학술대회논문집
    • /
    • 한국암반공학회 2007년도 특별심포지엄 논문집
    • /
    • pp.63-79
    • /
    • 2007
  • Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF