• Title/Summary/Keyword: Hydro-Pressure test

Search Result 60, Processing Time 0.023 seconds

KSLV-I Kick Motor Nozzle Hydro-Pressure Test (KSLV-1 Kick Motor 노즐 수압시험)

  • Yoo, Jae-Suk;Kim, Byung-Hun;Cho, In-Hyun;Jang, Young-Soon
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.202-209
    • /
    • 2008
  • KSLV-1 2nd stage Kick Motor Nozzle was exposed to high temperature and pressure during the firing. Under the high pressure environment, Kick Motor Nozzle hydro-pressure test was done for verifying the structural safety of the nozzle. The differences with the KM hydro-pressure test [1] are that the real immerged heat resistance material is assembled and the throat heat resistance material is similar with the real one. The hydro-pressure tests were done for the two times of the 125 % of MEOP (975 psi) and the 153 % of the MEOP.

  • PDF

Numerical Investigation of Pressure Fluctuation Reducing in Draft Tube of Francis Turbines

  • Li, WF;Feng, JJ;Wu, H;Lu, JL;Liao, WL;Luo, XQ
    • International Journal of Fluid Machinery and Systems
    • /
    • v.8 no.3
    • /
    • pp.202-208
    • /
    • 2015
  • For a prototype turbine operating under part load conditions, the turbine output is fluctuating strongly, leading to the power station incapable of connecting to the grid. The field test of the prototype turbine shows that the main reason is the resonance between the draft tube vortex frequency and the generator natural vibration frequency. In order to reduce the fluctuation of power output, different measures including the air admission, water admission and adding flow deflectors in the draft tube are put forward. CFD method is adopted to simulate the three-dimensional unsteady flow in the Francis turbine, to calculate pressure fluctuations in draft tube under three schemes and to compare with the field test result of the prototype turbine. Calculation results show that all the three measures can reduce the pressure pulsation amplitude in the draft tube. The method of water supply and adding flow deflector both can effectively change the frequency and avoid resonance, thus solving the output fluctuation problem. However, the method of air admission could not change the pressure fluctuation frequency.

Test Method to Evaluate the Fiber Material Properties of Filament Wound Composite Pressure Vessel (필라멘트 와인딩 복합재 압력용기의 섬유 방향 물성 평가 기법)

  • Hwang, Tae-Kyung;Park, Jae-Beom;Kim, Hyoung-Geun
    • Composites Research
    • /
    • v.23 no.3
    • /
    • pp.37-42
    • /
    • 2010
  • The fiber material properties, elastic constant and strength, are the most important factors among the various material properties for the design of composite pressure vessel, because of it's dominant influence on the performance of composite pressure vessel. That is, the deformation and burst pressure of pressure vessel highly affected by the fiber material properties. Therefore, the establishment of test method for exact fiber material properties is a priority item to design a composite pressure vessel. However, the fiber material properties in filament wound pressure vessel is very sensitive on various processing variables (equipment, operator and environmental condition etc..) and size effect, so that it isn't possible to measure exact fiber material properties from existing test methods. The hydro-burst test with full scale pressure vessel is a best method to obtain fiber material properties, but it requires a enormous cost. Thus, this paper suggests a newly developed test method, hoop ring test, that is capable of pressure testing with ring specimens extracted from real composite pressure vessel. The fiber material properties from hoop ring test method showed good agreement with the results of hydro-burst test with full scale composite pressure vessels.

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

Construction of small hydropower facilities performance evaluation system (소수력 발전설비 성능평가 시스템 구축)

  • Kim, Youngjoon;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

ANALYSIS OF PRESTRESSED CONCRETE CONTAINMENT VESSEL (PCCV) UNDER SEVERE ACCIDENT LOADING

  • Noh, Sang-Hoon;Moon, Il-Hwan;Lee, Jong-Bo;Kim, Jong-Hak
    • Nuclear Engineering and Technology
    • /
    • v.40 no.1
    • /
    • pp.77-86
    • /
    • 2008
  • This paper describes the nonlinear analyses of a 1:4 scale model of a prestressed concrete containment vessel (PCCV) using an axisymmetric model and a three-dimensional model. These two models are refined by comparison of the analysis results and with testing results. This paper is especially focused on the analysis of behavior under pressure and the temperature effects revealed using an axisymmetric model. The temperature-dependent degradation properties of concrete and steel are considered. Both geometric and material nonlinearities, including thermal effects, are also addressed in the analyses. The Menetrey and Willam (1995) concrete constitutive model with non-associated flow potential is adopted for this study. This study includes the results of the predicted thermal and mechanical behaviors of the PCCV subject to high temperature loading and internal pressure at the same time. To find the effect of high temperature accident conditions on the ultimate capacity of the liner plate, reinforcement, prestressing tendon and concrete, two kinds of analyses are performed: one for pressure only and the other for pressure with temperature. The results from the test on pressurization, analysis for pressure only, and analyses considering pressure with temperatures are compared with one another. The analysis results show that the temperature directly affects the behavior of the liner plate, but has little impact on the ultimate pressure capacity of the PCCV.

Thermal-Hydro-Mechanical Behaviors in the Engineered Barrier of a HLW Repository: Engineering-scale Validation Test (고준위폐기물처분장 공학적방벽의 열-수리-역학적 거동 연구: 엔지니어링 규모의 실증실험)

  • Lee, Jae-Owan;Cho, Won-Jin
    • Tunnel and Underground Space
    • /
    • v.17 no.6
    • /
    • pp.464-474
    • /
    • 2007
  • An enhancement in the performance and safety of a high-level waste repository requires a validation of its engineered barrier. An engineering-scale test (named "KENTEX") has been conducted to investigate the thermal-hydro-mechanical behaviors in the engineered barrier of the Korean reference disposal system The validation test started on May 31, 2005 and is still under operation. The experimental data obtained allowed a preliminary and qualitative interpretation of the thermal-hydro-mechanical behaviors in the bentonite blocks. The temperature was higher as it became closer to the heater, while it became lower as it was farther away from the heater. The water content had a higher value in the part close to the hydration surface than that in the heater part. The relative humidity data suggested that a hydration of the bentonite blocks might occur by different drying-wetting processes, depending on their position. The total pressure was continuously increased by the evolution of the saturation front in the bentonite blocks and thereby the swelling pressure. Near the heater region, there was also a significant contribution of the thermal expansion of bentonite and the vapor pressure in the pores of the bentonite blocks.

Performance evaluation facilities and evaluation methods for hydropower equipment (해외 수력발전설비 성능평가설비 및 평가 방법)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.194-194
    • /
    • 2010
  • The variable demand on the energy market, as well as the limited energy storage capabilities, requires a great flexibility in operating hydraulic turbines. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and/or maximum steady-state runaway speed, as well as guarantees related to cavitation. Performance test are conducted by the test standard. Test codes based on extensive research data are written under the leadership of an IEC. Performance evaluation is carry out several test(performance test, cavitation test and runaway test). The paper presents the international turbine test laboratory and performance test standard.

  • PDF

Strain monitoring of the composite high pressure tanks using the FBG sensors (광섬유 센서를 이용한 복합재료 고압탱크 변형률 측정)

  • 박재성;윤종훈;공철원;장영순;이원복;노태호
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2003.10a
    • /
    • pp.141-145
    • /
    • 2003
  • The FBG sensors are inserted on the liners of the filament wound pressure tanks. The strains near the welding region of the liners are monitored in the hydro-pressurizing tests. The hydro-pressurizing tests consist of the proof tests at 4500 or 3300 psi and repeated test at the operating pressure, 3000 psi. The FBG sensors work well under $3000\mu\varepsilon$, but the strains calculated from the reflected signals are instable at the high strain level. The transverse compression on the sensor head results in the split of the reflected peaks, and the calculating algorism from the split peaks is not robust under the various signal condition. The FBG sensors fracture near $7500\mu\varepsilon$ level and lose their function permanently.

  • PDF

The study on the technic of real time efficiency management of hydro turbine -generator (수차 발전기의 실시간 효율관리 기법 연구)

  • Kim, Seung-Hyo;Kwon, Young-June
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1018-1020
    • /
    • 2000
  • In the operation and maintenance activity of hydro turbine generator, one of the important parameters is the efficiency. This study analyze the case of efficiency management by pressure time method and survey the application of this method through the actual test. And it is confirmed that the Pressure time method exccesively limit the general condition to be applied. If index method is used for efficiency management because the index method calibrated by absolute discharge(by flow of pressure time method) is very accurate. it make to be able to manage the realtime efficiency.

  • PDF