• 제목/요약/키워드: Hydro scheduling

검색결과 20건 처리시간 0.032초

유전알고리즘을 이용한 단기 수력 스케줄링에 관한 연구 (Short-term Hydro Scheduling by Genetic Algorithms)

  • 이용한;황기현;문경준;박준호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권9호
    • /
    • pp.1088-1095
    • /
    • 1999
  • This paper presents short-term hydro scheduling method for hydrothermal coordination by genetic algorithms. Hydro scheduling problem has many constraints with fixed final reservoir volume. In this paper, the difficult water balance constraints caused by hydraulic coupling satisfied throughout dynamic decoding method. Adaptive penalizing method was also proposed to handle the infeasible solutions that violate various constraints. In this paper, we proposed GA to solve hydrothermal scheduling with appropriate decoding method and dynamic penalty method. The effectiveness of the proposed method is demonstrated in the case study.

  • PDF

확률 타부 탐색법을 이용한 수화력 계통의 경제운용에 관한 연구 (Hydro-Thermal Optimal Scheduling Using Probabilistic Tabu Search)

  • 김형수;문경준;박준호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권3호
    • /
    • pp.153-161
    • /
    • 2002
  • In this paper, we propose a Probabilistic Tabu Search(PTS) method for hydro-thermal scheduling. Hydro scheduling has many constraints and very difficult to solve the optical schedule because it has many local minima. To solve the problem effectively, the proposed method uses two procedures, one is Tabu search procedure that plays a role in local search, and the other is Restarting procedure that enables to diversify its search region. To adjust Parameters such as a reducing rate and initial searching region, search strategy is selected according to its probability after restarting procedure. Dynamic decoding method was also used to restrict a search region and to handle water balance constraints. In order to show the usefulness of the proposed method, the PTS is applied on two cases which have independent or dependent hydro plants and compared to those of other method. The simulation results show it is very efficient and useful algorithm to solve the hydro-thermal scheduling problem.

확률 타부 탐색법을 이용한 수화력 계통의 경제운용 (Hydro-Thermal Optimal Scheduling Using Probabilistic Tabu Search)

  • 김형수;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.76-79
    • /
    • 2002
  • In this paper, we propose a Probabilistic Tabu Search(PTS) method for hydro-thermal scheduling. Hydro scheduling has many constraints and very difficult to solve the optimal schedule because it has many local minima. To solve the problem effectively, the proposed method uses two procedures, one is Tabu search procedure that plays a role in local search, and the other is Restarting procedure that enables to diversify its search region. To adjust parameters such as a reducing rate and initial searching region, search strategy is selected according to its probability after Restarting procedure. In order to show the usefulness of the proposed method, the PTS is applied on two cases which have dependent hydro plants and compared to those of other method. The simulation results show it is very efficient and useful algorithm to solve the hydro-thermal scheduling problem.

  • PDF

유전 알고리즘에 의한 수화력 협조를 위한 단기 수력 스케줄링 (Short-Term Hydro Scheduling for Hydrothermal Coordination Using Genetic Algorithm)

  • 이용한;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.289-291
    • /
    • 1998
  • This paper presents short-term hydro scheduling method for hydrothermal coordination by genetic algorithm. Hydro scheduling problem has many constraints with fixed final reservoir volume. In this paper, the difficult water balance constraints caused by hydraulic coupling satisfied throughout dynamic decoding method. Adaptive penalizing method was also proposed to handle the infeasible solutions that violate various constraints. The effectiveness of proposed method in this paper was examined through the case studies. Further studies for the validation of the hydro scheduling scheme obtained by genetic algorithm will be very appreciated.

  • PDF

양수발전기의 전략적 시장참여에 대한 해석 모형 연구 (A Study on the Strategic Competition Model of Pumped Storage Plant)

  • 이광호
    • 전기학회논문지
    • /
    • 제56권10호
    • /
    • pp.1738-1743
    • /
    • 2007
  • This paper addresses the bidding strategies of a pumped-storage hydro plant in an electricity market. Competitive bidding of pumping and generating of a pumped-storage plant is formulated in a game theoretic problem in accordance with the three different ownership of scheduling; Market Operator(MO), generating company(Genco), and combined type of MO and Genco. Optimal conditions for Nash Equilibrium are derived in the form of market prices during the scheduling periods. Simulation results show the different ownership models produce different schedules of pumping and generating, which correspond to the objective of the scheduling owner of a pumped-storage hydro plant.

발전기보수유지계획을 고려한 CO2배출량의 추정 (Assessment of the CO2 Emission Considering the Generator Maintenance Scheduling)

  • 전동훈;박정제;오태곤;조경희;최재석;백웅기
    • 전기학회논문지
    • /
    • 제59권9호
    • /
    • pp.1507-1513
    • /
    • 2010
  • The $CO_2$ emission can be decreased due to freedom of generator maintenance scheduling(GMS). This paper proposes assessment of $CO_2$ emission considering generator maintenance scheduling(GMS) and evaluates effect of the GMS on $CO_2$ emission. And also, this paper assesses the $CO_2$ emission and the probabilistic production cost simulation of nuclear and thermal power generators considering operation of hydro and pumped generator. The minimum reliability criterion level satisfied production cost minimization function model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system in Korea in 2010.

Tabu 탐색법을 이용한 수화력 계통의 단기 운용 계획 (A Short Term Hydro-Thermal Scheduling using Tabu Search)

  • 김성기;김형수;문경준;황기현;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.331-333
    • /
    • 2000
  • This paper propose the method combined Priority and Tabu search (TS) for short term hydro-thermal scheduling. We satisfy various conditions using TS, Restarting method is used as diversification strategy of TS to prevent a local convergence. Also, we use Lagrangian method to solve economic dispatch problems.

  • PDF

진화 프로그래밍기법을 적용한 단기 수화력 운용 (A Short Term Hydro-Thermal Scheduling using Evolutionary Programming)

  • 김재철;백영식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권8호
    • /
    • pp.917-923
    • /
    • 1999
  • This paper proposes an efficient method of hydro-thermal scheduling in coordination with head variation and hydraulically coupled plants using Evolutionary Programing(EP). Based on the EP technique, the proposed algorithm is capable of determining the global optimal solutions. The constraints such a power balance condition, water available condition and transmission losses are embedded and satisfied throughout the proposed EP approach. The effectiveness of the proposed approach is demonstrated on the test systems and compared to those of other method. The results show that the new approach obtains a more highly optimal solutions than the conventional other methods such as newton-raphson method, Dynamic Programming(DP), LU factorization.

  • PDF

기동정지계획을 고려한 제수발전소의 주간 운용에 관한 연구 (A Study on the Weekly Operation planning of pumped Hydrostorage plant Considering Unit Commitment)

  • 송길영;홍상은;김영태
    • 대한전기학회논문지
    • /
    • 제36권5호
    • /
    • pp.319-327
    • /
    • 1987
  • This paper presents a dynamic programming sucdessive approximation algorithm for scheduling pumped storage hydro plants and shows how this method can be coordinated with the commitment of the thermal units of the system. The general object of operation of pumped hydrostorage plants is the minimization of the overall production cost and the maximization of generation reserves. The basic procedure used to obtain a combined pumped storage-unit commitment schedule is to execute the pumped storage scheduler and unit commitment scheduler iteratively. A combined DPSA algorithm has been presented to coordinate the scheduling of the pumped storage with the scheduling of the thermal units.

  • PDF