Many production management systems for increasing productivity, minimizing inventory, keeping due dates and maximizing use of resources have been proposed, and GT, MRP and JIT are frequently used among these systems. The three systems have merits and demerits through comparing with each other. Because each system has mutual dependence, a hybrid production system Is necessary for using their merits maximally. In this study, a hybrid production system is designed by combining GT, MRP and JIT, which is suitable in the domestic production system and it is presented as followings. -. Basic research works for G7, MRP and JIT. -. Comparison and analysis are carried out for each system.- . The hybrid production system is designed. -. The hybrid production system is developed.
Proceedings of the Safety Management and Science Conference
/
2001.05a
/
pp.185-188
/
2001
Many production management systems for increasing productivity, minimizing inventory, keeping due dates and maximizing use of resources have been proposed, and GT, MRP and JIT are frequently used among these systems. The three systems have merits and demerits through comparing with each other. Because each system has mutual dependence, a hybrid production system is necessary for using their merits maximally. In this study, a hybrid production system is designed by combining GT, MRP and JIT, which is suitable in the domestic production system.
Journal of the Korea Society of Computer and Information
/
v.4
no.1
/
pp.54-61
/
1999
The MRP, OPT and JIT systems have the respective limitations to become the suitable production management systems of the future. Therefore it is highly requested to develop an integrated production management system by the hybridization of those production systems. Accordingly, this study has focused its hybrid model using MRP, JIT and OPT. There has been many efforts in comparing and analyzing the usefulness and the limitations of those production systems and applying the usefulness to the maximum which improving and supplementing the weakpoints of respective systems. In this respect, this study develop the hybrid simulation model, and this hybrid model are evaluated and compared with MRP(Push system) and JIT(Pull system) by using a simulation.
This paper presents a supply chain framework with the ODM (Original Design Manufacturing)-OEM (Original Equipment Manufacturing) hybrid production of textile industry in FTA (Free Trade Agreements) environments between Korea and other countries. The proposed supply chain framework with ODM-OEM hybrid production is a unique supply chain that has both domestic production with non-tariff advantages in FTA environment and oversea production with low labor costs. To investigate the validity of the proposed supply chain, we first construct its strategic profit model and supply chain planning and then show that each member of supply chain network-yarn manufacturer, fabric manufacturer, and apparel manufacturer-can maximize their own profits without conflicts among the members. The efficiency of the ODM-OEM hybrid production system is analytically verified in comparison with the general OEM and ODM production model using profit models. Comprehensive numerical examples are provided to illustrate the advantages of the proposed system.
Proceedings of the Korea Society for Simulation Conference
/
2001.10a
/
pp.280-287
/
2001
There have been some studies about hybrid production system, which integrate push system and pull system. Most of them are based on the simple production system considering one product line. Though there are many studies about hybrid production system, it\`s not practical to implement them for real factory, because most of them did not consider various factors about real factory. On this study we designed hybrid production system considering some factor - one is automatic kanban generation, the other is dispatching rule for Multi-tasking worker, and the last one is the priority of kanban. At last, We give simulation results fur a real company, which produce various cameras in Korea.
Journal of the Korean Society of Manufacturing Process Engineers
/
v.14
no.1
/
pp.105-110
/
2015
In this study, a high-speed procedure to be used in composite molding technology is developed for the production of a hybrid supercapacitor in a progressive and revolutionary current in a production system, as are the related operating conditions. Mold parts with solid modeling, the ease of programming of future mold product designs, tolerance management, and pre-explode tests by the building of a progressive die design system using Cimatron_E10 Die Design Software for the strip layout are done. The capacity of the super-hybrid composite mold design will save time and money through its verification of the manufacture of molds. We plan to apply this to future related products for production cost savings of more than 30% achieved by considering the components of the production costs, labor, and material costs of production as compared to conventional production methods.
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.2
/
pp.76-84
/
2011
To meet the needs of customer, manufacturing companies are diversifying product making methods. In order to adapt to changes, companies are trying to find a new manufacturing system. In this research, MTS (Make to Stock) and MTO (Make to Order) production methods are simulated using ARENA and the results are compared and analyzed to find a better system. As a result, by combining the advantages of MTS and MTO system, a hybrid production system is developed. The hybrid model is analyzed to verify that it is better than the existing two models, which is MTS and MTO model. The statistic results of output analyzer show that a new system helped to increase production rate and decrease work in process inventory. The hybrid model proved that it contains the merits of MTO production method and MTS production method.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2011.11a
/
pp.162-163
/
2011
This paper presents the system dynamics methodology for modeling and control the production/inventory system. Under system dynamics point of view, we can apply some production/inventory policies as if we use the control laws for dynamics systems, then the behavior of system is analyzed and evaluated to improve the performance of production/inventory system. We also utilize the hybrid modeling method for the dynamic of production system with the combination of Matlab/Simulink and Matlab/Sateflow. Finally, the numerical simulation results are carried out in Matlab/Simulink environment and compare with the results from other works. It is shown that our approach can obtain some good performances (such as operational cost, stability of inventory, customer service level).
The cycle time and power saving effect of a hydraulic hybrid injection molding machine using a servo motor are considered in this paper. In order to verify control characteristics, such as pressure and speed, experiments were performed with the hydraulic hybrid injection molding machine, clamping force of 110 ton. The power consumption and production cycle time of a conventional hydraulic injection molding machine were measured to compare its performances with the hydraulic hybrid injection molding machine. An injection molding machine with a clamping force of 1300 ton was used as the conventional machine, the hybrid machine was implemented by replacing its induction motors with servo motors. In the remodeled hybrid machine, experiments were performed to investigate how the displacement of the mold clamping pump affects the power consumption and production cycle time. The results showed that the production cycle time of the hybrid injection molding is similar to a conventional hydraulic injection molding machine but with a significant energy saving of about 40%.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2014.10a
/
pp.175-176
/
2014
The paper deals with the development of the multi-layer plant production systems using a sunlight and LED. Nowadays most of plant production systems have been developed by plant factory using only LED. In case of plant factory using LED, however, the light quantity is not sufficient for various kinds of medicinal plants. In this paper, authors have tried to apply the both the luminous sources using a natural sunlight and an appropriate LED. During the daytime, a natural sunlight was applied using the Heliostat, while in the nighttime, LED was used. The proposed mixed plant production system was constructed under the various environmental conditions such as $CO_2$ distribution, temperature and humidity. Through the hybrid plant prodution systems, the growth of Ginseng plants were recorded and demonstrated by CCD camera and monitoring program.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.